I hereby request for fuel for HDPE PIPE works for the following machines below;
Operator Machine/Vehicle Hourly Reading FUEL % Previous FUEL WORK DONE PLANNED SIGN
Fuel REQ ACTIVITY FOR
REQUEST
START STOP HOURS START STOP % % PREVIOUS
WORKE USED AFTER FUEL
D FUEL
1. OKOT DENIS EXCAVATOR 05 1096. 1096.6 0.1 12.1 11.0 1.1 100L 100L No work done -Removing soil
5 fuel level too and broken rocks
low 1.1% used from the trench at
for cleaning the cp 15-18.
chain of the -Transfer machine
machine. from cp 15 to cp
36
-Desilting and
backfilling at cp
36.
2. OPIO KENNETH EXCAVATOR 11 744.8 750.0 0 14.9 14.4 0.5 130L 100L No work done -Complete rock
fuel level too breaking at cp 15.
low 0.5% used -Transferring
for cleaning the machine from cp
chain of the 15 to cp 36.
machine. -Rock breaking at
cp.36.
3.ADA AMBROSE WHEEL LOADER 344.6 344.6 0 28.8 28.8 0 80L 0 No work done -Transferring
06 the two machine from cp
excavators lack 15 to cp 36
fuel for work. -Pulling pipes into
the trench when
laying at cp 15
and 36.
Thanks
James Eguma