Sample Project Plan With Info
Sample Project Plan With Info
Sample Project Plan With Info
Poor data capture (rejections vs accepted loads) ~ Standardization of data for each step with validations to confirm integrity ~ Complete elimination of manual (email/ phone) processes The first two columns should com
and sufficiency ~ All callouts and communications are only via Ironsight HOW we will measure success.
~ Ironsight will track acceptance and rejections automatically building the
database required not only for the water validation process but also, provide
insight for vendor management efforts
Callouts made via phone calls and followed by emails ~ Automated callouts leveraging one of 4 methods to assign loads to different ~ Complete elimination of manual (email/ phone) processes
vendors: ~ All callouts and communications are only via Ironsight
1) Assign Directly/manually
2) Call out from Pool/Call-out list (time based)
3) Automatically assign (Dedicated trucks) and,
4) First come first serve
~ All correspondence contained in IronSight
Inability to evaluate vendor’s performance Ability to extract reports to evaluate Vendor performance ~ Predefined reports on metrics to evaluate performance, including productive
and non-productive time
Manual water validation process
Delays in water validation have led to past due payments ~ Streamline the water validation process by providing all required data and ~ Complete elimination of manual (email/ phone) processes
creating friction with multiple vendors support to validate loads to both the FAT and our Vendor base ~ Updated contracts with new payment terms
~ Ability to offer Net 15 terms vs Net 30
Poor data quality used to validate loads Standardization of data for each step with validations to confirm integrity and ~ Complete elimination of manual (email/ phone) processes
sufficiency ~ All callouts and communications are only via Ironsight
Using Vendor and SWD’s spreadsheets with backup images Standardization of data for each step with validations to confirm integrity and ~ Standardization across vendors with ability for them to attach files/ images as
sufficiency needed
Time consuming – manual process Automated process with pre-defined triggers and alerts to ensure timeliness ~ Complete elimination of manual processes
~ SLA-based triggers/ alerts to enforce target turnaround at every step in the
process
Inability to validate travel times (Yard to location, loading ~ Full visibility on travel through geolocation, allowing us to monitor and ~ TOC has visual updates on the location of each truck via IronSight
time, location to disposal sites, etc.) identify every load destination/disposal site utilized – critical for ESG purposes
~ Full visibility on travel through geolocation allowing us to monitor and
identify travel time outliers.
Inability to monitor/track destination/disposal of loads Precise, real-time tracking of each truck ~ TOC has visual updates on the location of each truck via IronSight
Inefficient Invoicing through Ariba
Vendors utilizing Factoring companies have had issues given Standardized formats and process ~ All invoicing will only be raised in Ariba, using standardized formats
Ariba’s self service capabilities
SES issues prevent multiple users from working concurrently Design a process that does not require concurrent access by multiple Users
on the same PO
Manual Truck management & tracking
TOC needs to call every driver/company to get ETA Precise, real-time tracking of each truck ~ Complete elimination of manual callouts
~ Dashboards that provide real-time status and ETA
Inability to re-route trucks with regard to real-time conditions Precise, real-time tracking of each truck ~ Real-time alerts to drivers and TOC
Unable to identify trucks on standby – Non-Productive Time TOC and Field personnel have real-time visibility of all incoming trucks ~ Dashboards that provide real-time status, including status post
through geolocation communicating emergencies/ change in routing* (is that accurate?)
Inability to re-direct on-route trucks from nearby jobs ~ Ability to release trucks on standby reducing unnecessary spend ~ Dashboards that provide real-time status
~ Ability for TOC to override hauls, identifying trucks closest to location in ~ TOC able to override jobs per need
case of emergencies and/or prioritization between jobs
Other benefits
Asset Shut-in Decrease risk (Can we measure it? $/day? $/hr)
Call-out optimization Decrease/ eliminate callouts Decrease from top 5 usage ~$642/yr
Water Validation Increase efficiency – Payment Terms Decrease from ~$600k/yr
HSSE/Legal/ESG Increased visibility
Escalation to other programs – i.e. Chemicals
Alignment with Enterprise Risk Management (ERM) Library This initiative addresses the following items on the ERM Library: N/A
ERM-14, ERM 18, ERM-20.
rter: The Project Charter provides direction on why we are undertaking a
ect, establishes authority, identifies the major stakeholders and sets the
ction for the initiative. Once it is approved, it formally authorizes a
ect and serves as its foundation.
first two columns should come from your Business case. In column 3, list
W we will measure success.
IronSight | RACI
* Steering Committee: Brian Paddock, Rolando Abreu, Keith R Responsible A Accountable C Consulted
Herndon, Antonio Falcon, Daniel Moore
To do the work For decisions/ delegations before decision taken
g
i ni n
ta)
n)
c hi
Tra
?)
aso
g (D are (
-Ar
nt/
ro)
l)
(M
ica
e
l ew
io)
me
Pro g Com jand
i
(An *
l)
an
g
ng
(Er
e
rae
tin
ton
a)
e
op
idd
orti
tt
e
ri c
rac
ger
ato ty (Is
(Al
mi
vel
ld A for M
Project
E
ta)
tin
ern y Rep
t
ana
in (
De
l)
on
Ste onsor
do
E & laji)
it
OC
uri
ue
un
ch i
ud
C
a
Deliverable
lan
)
tM
&
arc
n
e
cco
ght
Sec
tP
(Ba
(Ar
r
al a
ng/
ors
tur
Ma
ng
n
p
ty
Ro
je c
je c
(M
eri
nSi
c. S
pl y
nd
MO
r ci
rn i
IBA
u ri
ce n
or Activity
P(
gul
C(
P ro
SLT
Ir o
DT
Ve
Sup
Sou
E xe
Lea
Sec
SA
Fie
TO
AR
Int
HS
Re
EP
Ac
Leadership Project Team Members External Resources
Initiate
Develop & submit Business Case A R C C C C C C C C C C C C C I
Approve Business Case R A, C C, I I I I I I I I I I I I I I C, I I
Plan
Create Project Charter incl: Scope,
A, R R C R R R C C C C C R C
timeline, final estimated budget
Hold kickoff, align all on objectives, scope,
A, R C C R C C C C C C C C C
timeline, R&R
Secure cross-functional approval I A, R R R R R R R R R R R R C I
SLT approval I R, A I I I I I I I I I I I I I I
Execute
Finalize Vendors A R R R
Finalize Services A C R R C C C C C C C C C C
Finalize Workflow A R R R R R R R R R R R R R
Finalize Requirements (Day 1 and future) R A R R C R C C R R R R R R R C I
Configure platform/ infra A I I I I R R I I I I I I I R
Load data A I I I I R R I I I I I I I R
Configure fields I I I I R R I I I I I I I I R
Build forms A I I R
Create communication plan for roll-out I R A C C C C C C C C C C C C
Send advance alert of upcoming changes
I I R, A I I I I I I I I C I I
to Vendors
Get revise contracts for new net payment
I I A R R, C
terms signed
Report on status I I I I R, A C, I C, I C, I C, I C, I C, I C, I C, I C, I C, I C C
Design, build and test system - INTERNAL I I I I I A, R R R R R R R C, I C
Control
Perform Change Management A, R I I I I I I I I I I I I I I I I
Create and maintain Backlog for future
I I R R R I R R R R R R R R I R I
change/ enhancements
Report on status I I A R R R C R R R R R R R I I R I
Post go-live monitoring with CSM A R
Close
Hold Lessons Learned I I A R C C C, R C C C C C C C C C
Update artifacts & close project I I I A, R R R C, R R R R R R R R R R R I
Hold 3-month evaluation A R R R C, R R R R R R R R R R R I
I Informed The Steering Committee will have provide Stage Gate 2 Approval and also hold the decision-making authority du
and Go/ No Go for 'go live' assessment
Kept updated
ors
1 Any region other than WTX The platform must have the capability for WES to add regions without need for additional time/ effort from IronSight.
However, the initial rollout will only include WTX
This feature, a
remain focuse
refer the WBS
committed to
All items listed in this section WILL NOT be delivered in this project. Once
the Plan is approved, if we need to add any items from here into "Scope",
it must be first approved by the Steering Committee as part of Change
Management.
This feature, along with the WBS/ Scope enables the project team to
remain focused on what we committed to deliver. When in doubt, always
refer the WBS/ Scope and Out of scope section to determine what we
committed to deliver.
Projected timeline
# Task Name Duration Start Finish Predecessors
1 Main workflow finalized 15d 03/20/24 04/09/24
2 Approval from cross functional leads (Steering committee) 5d 04/10/24 04/16/24 1
3 Approval from SLT 5d 04/17/24 04/23/24 2
4 Complete AFE process 10d 04/10/24 04/23/24 2SS
5 Sign MCSA and Work order with IronSight 10d 04/24/24 05/07/24 1SS, 3, 4
6 Sign any other Work orders with Vendors 5d 04/24/24 04/30/24 1SS, 3, 4
7 (Formal) Project kickoff 0 05/08/24 05/08/24 5FS +1d
This is a high-level chart of wh
8 Discovery 3w 05/08/24 05/28/24 5
the basis for later developing
9 Communication re. upcoming rollout 10d 06/05/24 06/18/24 8FS +5d Schedule
10 Platform configuration (IronSight and WES) 2.5w 05/22/24 06/07/24 8SS +10d
11 Connect & Configure integration (includes testing and addressing UAT fixes) 9w 05/22/24 07/23/24 10SS
12 Dev, SIT testing (includes addressing UAT fixes) 25d 06/19/24 07/23/24 11SS +20d
13 UAT 10d 07/03/24 07/16/24 11SS +6w
14 User onboarding and Training 10d 07/10/24 07/23/24 13SS +5d
15 Go-live 0 07/24/24 07/24/24 14FS +1d
16 Commence post-live support 0 07/25/24 07/25/24 15FS +1d
This is a high-level chart of what needs to be done, and when. It forms
the basis for later developing a fully 'decomposed' (i.e., detailed) Project
Schedule
Total estimated costs for the initiative
Y1 $ Y2 $ Y3 $ Y4 $ Y5 $
One time:
Discovery, Configuration, Training, Support & Go-live $ 20,000.00
Access to IronSight API for SAP and BI Tools integration $ 20,000.00
IronSight Premium Form/ Chart Bundle $ 15,000.00
Recurring:
Licenses $ 319,400.00 $ 343,355.00 $ 369,105.00
Annual Maintenance & support $ 4,000.00 $ 4,000.00 $ 4,000.00
Other:
Development if middleware for SAP integration $ 175,000.00
Maintenance for SAP middleware (if support provided by IronSight) $ 25,000.00 $ 25,000.00 $ 25,000.00
Sub-totals $ 578,400.00 $ 372,355.00 $ 398,105.00
GRAND TOTAL OF ESTIMATED COST
The budget details what we expect to incur to deliver this project.
It must include all projected costs/ expenses, whether they are one-
time or recurring.
For projects that are completely internal, while we might not have
any tangible expenses for which there will be an outflow, there still
is a cost. In this case, it is the cost of the time of the team who will
work on the project
$ 1,348,860.00
Auto-calculated
Risks, Issues, Assumptions & Dependencies
Date Date Status Owner Function RAID Date Risk/ Issue/ Assumption/ Dependency description (IF… THEN)
opened closed (source) completed
1 03/18 WIP - on track Erica Solution/ Process IF we cannot use contract hierarchy in IronSight, THEN
we will need to include integration with SAP for PO
creation
2 03/18 WIP - on track Erica Solution/ Process IF we cannot use contract hierarchy in IronSight, THEN
we will need to include integration with SAP for PO
creation
3 03/18 Closed Gautam Solution/ Process 03/26 IF we need to integrate IronSight with SAP or Ariba,
THEN we might need to defer this work until the S4
upgrade is completed (Target: Sept., '24)
4 03/20 WIP - on track Erica Solution/ Process IF we use Contract Hierarchy THEN a new Invoice
Documents type will have to be created and tested
5 26-Mar WIP - on track Erica Solution/ Process IF we include DOA in IronSight THEN HR information will
need to reside in IronSight (sensitive information)
ncies
Mitigation plans/ Notes Type* Probability Impact RISK SCORE
(1 = Low) (1 = Low)
As above Resources 10 8 80
Write each item using "If" "Then" statements. If more than one
impact, add the same risk as many times as needed and select each
'Type'.
RAID Component Definition Example
Risk (R) These are uncertain events or conditions that, if they occur, can have an effect IF we see resistance from employees from adopting the new
on the project outcome. Remember, they could have a positive outcome, in HR software THEN we might need to consider training to
which case it DECREASES the score. If you have a 'positive' risk, enter it as a communicate the benefit specifically to them
negative value between 01 and -9, where -9 (remember, -1 is greater than -9)
Assumption (A) These are conditions believed to be true or things assumed to be in place, upon If any employees do not have basic computer skills
which the project plan is based. necessary to navigate and use the new HR software, then
we will need to plan to deliver training
Issue (I) These are current challenges or problems that are negatively affecting the If we are unable to address the technical issues within the
project or have the potential to do so if not addressed. When a risk materializes newly implemented HR system THEN we cannot go live
to become a reality, it becomes an issue
Dependency (D) These are tasks, milestones, or components that are reliant on one another for If trainers are not available ahead of go live, THEN we will
their progression or completion. need to cancel non-essential training to free up trainers
umptions, issues,
Facilities 7 Other
Finance 8
Governance 9
Health, Safety, Security & Environment 10
Human Resources, DE&I
Legal -8
Operations: North -7
Operations: South -6
Operations: All -5
Solution/ Process -4
-3
Risk -2
Issue -1
Assumption
Dependency
PROJECT SCOPE - Work Breakdown Structure (WBS) - Busi
PLEASE EMBED WORD, PPT/ pDF etc. DOCUMENTS, IF YOU CANNOT CAPTU
Business requirement Detail/ Use cases (To be fleshed out during Discovery)
(WHAT is needed)
1 Launch in WTX only Accommodate Vendors with differing billing (hourly or BBL)
See IronSheet data gathering sheet on Scalability: WES Admin must be able to add
'Documents Link' tab new regions without need to engage vendor
Gautam
This d
down
by th
List a
bulle
Laura - IronSight
Laura - IronSight
Laura - IronSight
Laura - IronSight
Laura - IronSight
Laura - IronSight
Laura - IronSight
Laura - IronSight
Laura - IronSight
Laura - IronSight
Laura - IronSight
Laura - IronSight
Laura - IronSight
Laura - IronSight
N/A N/A
N/A N/A
N/A N/A
This document build on the WBS. Please break each bucket of 'what'
down to more granular rows. The Functional column will be filled in
by the Tech team
List all work that must be done to complete the project, use outlined
bullets to make sure you capture every aspect of the work.
% Phase/ Task Duration Planned Dependen Planned Actual Actual Budget Actual spend
done start cies finish start finish
100% Initiation
1 Initiation $0 100% $0 $0
2 Planning $0 63% $0 $0
3 Execution $0 0% $0 $0
4 Control $0 50% $0 $0
5 Closing $0 0% $0 $0
$0
$0
Be as detailed as you can be, listing all tasks that must be $0
completed under this project. $0
$0
Remember to only use calendar days (exclude weekend and $0
holidays).
$0
If you have a milestone, set the duration to 0 days. E.g., 'Go $0
live' $0
Reach out to EPMO for help. $0
$0
$0
$0
$0
$0
Totals $0 $0 $0
Override date:
COMMUNICATION GOALS
• Keep stakeholders informed of ongoing progress and any changes
• Identify any roadblocks and resolve them early
• Create opportunities for feedback from stakeholders and team
COMMUNICATION PLAN
ACTIVITY TYPE FREQUENCY ATTENDING PURPOSE Template link
Project Kickoff In-person, Video One-time Project team members, POC, all SMEs, Outline goals, scope, roles & responsibilities To be added
Conference Vendor and project manager and timeline, and
assign first milestone tasks
Status call In-person, Video Weekly Project team members, POC, SMEs Discuss items completed, upcoming tasks, To be added
Conference needed per agenda, Vendor and project milestones, risks and action items
manager
Status Report Email Weekly Team members and project manager Summarize progress and outline To be added
achievements for week and goals for
following week; risks and help needed
Stage Gate In-person, Video As required POC, PM, Senior leadership (will differ Provide updates and secure approval to To be added
Conference based on Stage gate) proceed to next stage
Touch Base In-person, Video As required Team members and project manager Discuss any items needed To be added
Conference
Change In-person, Video As required POC, PM, Senior leadership Secure decision on Change requests To be added
management Conference
Lessons Learned In-person, Video End of Project POC, PM, Team members and project Assess successes and opportunities and To be added
Meeting Conference manager collect input for improvement of subsequent
projects
3-month look back In-person, Video End of Project POC, PM, Team members and project Assess if we are on track to achieve goals/ To be added
Conference manager benefits. Share report out with SLT
Edit as needed
1 03/21 Set up time to discuss impact/ next steps with Archita 03/22: Invite sent for 03/25
Erica, Antonio, Gautam and Manuel
2 03/22 Connect with Laura @ IronSight to start Discovery Erica 03/21: Laura has confirmed discussions can start ahead of PO
03/22: Laura sent initial documents; archita has requested templates to document
scope and shared the draft WES has started
03/22: Received templates and had discussion with Laura, to walkthrough their
implementation process
3 03/20 Confirm that IronSight can integrte OKTA Laura 03/20: IronSight to send documentation for OKTA integration approach so Marc can get
authentication sign-off from the Security team
04/02: Received and sent docs to Marc to confirm if it is adequate to get sign off from
the Security team
4 03/22 Set up formal kickoff and weekly touchbase for Archita 03/22: This will be set up once we have finalized the workflows
project 04/09: Initial internal call completed. Weekly calls will commence once we have
approval to proceed
5 03/22 Get MSA/ SOW executed with IronSight Antonio 03/22: This will be done in parallel with Stage Gate 2 and 3 approvals
6 03/26 Create Level 3 process maps to show future-state Erica 04/01: Archita to draft flow based on conversations to date, Erica to review
flows 04/09: # of 5 flows are complete
7 03/26 Request IronSight for details of where they have Erica 03/26: Sent request
executed integration with SAP/ Ariba 03/27: Received information from Laura - closed
8 03/26 Confirm that OKTA is added to MSA/ SOW (or Archita 03/27: Conveyed to Antonio; we will ensure this is added in the final version signed
Work order) as initial scope to be delivered
9 03/27 Confirm if we can skip DOA (as recommended by Erica 03/27: Erica confirmed with the Accounting team that we MUST include DOA ahead of
Gautam) or if must account for DOA as part of the PO creation. Also, we do not want to stroe DOA hierarchy in IronSight
approval, ahead of the PO being created
10 03/27 Confirm how master data must be sent to to Laura 03/27: Will this be SFTP? What is the file format? Csv, Xml, Json, other? Are there web
IronSight APIs available? Need technical details like are they exposed as web service, REST api,
etc; how change logic is handled, are these full reloads each interface or do they
ADD/DELETE/EDIT type logic in them, is master data feeds normally flat files but then
the PO push into IronSight is a web API?
03/28: Laura sent response: IronSight_Location_Sync.pdf – this document details how
to synchronize locations and cost centers in IronSight with an external source. It’s a
REST endpoint that accepts the full master dataset as a CSV file. Locations in the file
that aren’t already in IronSight are added, locations that already exist in IronSight are
updated in-place, and locations no longer contained in the CSV file are archived in
IronSight. To be confirmed with Marc: Good to close item?
11 03/27 Confirm how will we receive data from IronSight Laura 03/27: Are these web APIs exposed that we poll? What fields are available on the data
that’s exposed?
03/28: Laura sent response:IronSight_API_Sample.pdf – this document details a subset
of the IronSight API endpoints for reference purposes. Any operation that’s available
from the user interface is available through an equivalent API endpoint. In the Oxy
workflow they call the Get Jobs endpoint, then reconcile the data against SAP, then call
the Update Custom Fields endpoint to write the PO details back to the IronSight job. To
be confirmed with Marc: Good to close item?
12 03/27 Confirm IronSight testing approach Laura 03/27: Will IronSight provide/ help identify the test scenarios that need to be
executed? Will there be a test environment we can use or do we use the production
environment and if so how do we delete the test data? Will we have a test
environment for usage in general if we have support issues?
03/18: Laura sent details. To be confirmed with Marc: Good to close item?
04/ 02: Marc has conveyed preference for testing; IronSight to set up test
environments
13 03/28 Plan time and tasks in in schedule, to clear out all Erica
current POs pending processing ahead of go live
(to allow starting with a clean slate)
14 03/28 Need a correction flow for work to be routed Erica
back to FA
15 03/28 Check if there is a limit on the number of
Erica/
individuals in a team, who could have credentials Archita/
to access IronSight Laura
16 03/28 Confirm additional need for WES to get
documented consent from drivers for the use of
Bryan E
the their mobile phones with the IronSight app
installed
17 03/28 Confirm the level of data (how granular) IronSight Erica/
needs on geolocation Archita
18 03/28 Provide Archita with estimated duration and
dependencies/ sequential activities for and Marc
development-testing to be undertaken by WES
19 03/28 Provide Brian with a BRD template Archita
20 03/28 Provide Business requirements of the Operations
Brian P
team
21 03/28 The team raised the need to map coordinate Erica/
information with data in SAP, as they might not Archita/
match up 1:1 Laura
22 04/11 Establish RACI for use of IronSight Erica/
Archita/
Laura
Status Health
Status Date closed New New/ Not On track At risk Delayed Complete
started
Complete 03/22
On track
Delayed All Action items MUST begin with a verb so we know exactly
what needs to be done. E.g.: Instead of "Approval on
document", use a verb to know what's expected: "Get
approval on document"? "Provide approval on document"?
On track
On track
Complete 03/27
On track
Complete 03/27
On track
On track
Complete 04/02
New/ Not
started
New/ Not
started
Decision Log
# Date opened Details of decision needed Decision taken and justification Decision maker Status Date closed
1 03/18 Do we need integration with SAP and/ or 03/26: Integration is necessary to realize project Antonio Falcon Closed 03/26
Ariba for the PO and/ or the Invoice goals; team working to define when, how and
process? what data will be exchanged with IronSight.
Latter will be tracked separately under Action
items – closing this item
2 03/26 What will the PO/ PR process be, and what 03/26: Team evaluated the 3 options and will Daniel Moore, Gautam Open
data will be included in the integration? focus on two Ramdas, Manuel
03/28: Option 2 (PR approach) identified as Cavazos, Erica Nix,
optimal. Final flow to be presented to Marc Battistello
Accounting and SAP teams, to finalize the
decision
3 03/27 How should the post-go live environment 04/02: We will go with the second option. Marc Battistello Closed 03/27
be set up: Same for various purposes such IronSight will set up the environment accordingly
as training, troubleshooting etc.., or create
a distinct sandbox for environment that
can be configured by a WES Admin user,
that can be used for testing and
troubleshooting but with no integrations
linked to the sandbox?
Docume
what wa
Reach o
Status
New
Open
Closed
Deferred
Thes
repe
this
It is
whe
likel
Reac
Function
Accounting
Business Services
Commercial
Compliance/ Regulatory
Digital Technology
Facilities
Finance
Health, Safety, Security & Environment
Human Resources, DE&I
Legal
Operations: North
Operations: South
Operations: All
These can be any moment that lead to an insight: positive (we want to
repeat this behavior/ event) or negative (we take away how to avoid
this behavior/ event.
Erica Erica.Nix@westernmidstream.com
Archita archita.dasgupta@westernmidstream.com