Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 8

Technical Education and Skills Development Authority

RTC-ILIGAN

TRAINEE’S RECORD BOOK

I.D
3
2x2

Trainee’s No. ____________

NAME: ________________________________

QUALIFICATION: __________________________

TRAINING DURATION: ____________________

TRAINER: ________________________________
Instructions: NOTES:
This Trainees’ Record Book (TRB) is intended to serve as
record of all accomplishment/task/activities while undergoing __________________________________________________________
training in the industry. It will eventually become evidence
that can be submitted for portfolio assessment and for __________________________________________________________
whatever purpose it will serve you. It is therefore important __________________________________________________________
that all its contents are viably entered by both the trainees
and instructor. __________________________________________________________

The Trainees’ Record Book contains all the required __________________________________________________________


competencies in your chosen qualification. All you have to do __________________________________________________________
is to fill in the column “Task required” and “Date
__________________________________________________________
Accomplished” with all the activities in accordance with the
training program and to be taken up in the school and with __________________________________________________________
the guidance of the instructor. The instructor will likewise __________________________________________________________
indicate his/her remarks on the “Instructors Remarks”
column regarding the outcome of the task accomplished by __________________________________________________________
the trainees. Be sure that the trainee will personally __________________________________________________________
accomplish the task and confirmed by the instructor.
__________________________________________________________
It is of great importance that the content should be
written legibly on ink. Avoid any corrections or erasures and __________________________________________________________
maintain the cleanliness of this record. __________________________________________________________
This will be collected by your trainer and submit the __________________________________________________________
same to the Vocational Instruction Supervisor (VIS) and shall
form part of the permanent trainee’s document on file.

THANK YOU.
Unit of Competency: Perform roughingin, wiring and cabling requirements
works for single-phase distribution,
1.5 Install conduit Completed
power, lighting and auxiliary systems
couplings and
NC Level: II elbows
Learning Task/Activity Date Instructors according to job
Outcome Required Accom- Remarks requirements
plished 1.6 Thread conduit Completed
Install 1.1 Determine the Completed in line with job
electrical correct requirements
metallic quantities of
/nonmetallic conduit, fittings, 1.7 Follow safety Completed
(PVC and accessories procedures as
conduit) as per job defined by
requirements standard
1.2 Select the Completed operating
appropriate procedures
tools and (SOPs)
equipment Completed
according to job Install wire 2.1 Interpret the Completed
requirements ways and correct drawings
1.3 Ensure that Completed cable tray to determine job
conduit is requirements
assembled with 2.2 Select the Completed
fittings fully correct
inserted and quantities of
tightened as per materials as per
job job
requirements requirements
2.3 Choose the Completed
1.4 Verify that Completed
necessary tools
conduit bends
and equipment
do not exceed 90
for the job
degrees, in line
requirements
with job
2.4 Install wire ways Completed
and cable trays
in accordance 3.6 Follow safety Completed
with job procedures in
requirements line with SOPs
2.5 Adhere to safety Completed Prepare for 4.1 Prepare the Completed
procedures in cable pulling necessary tools,
line with SOPs and equipment,
Install 3.1 Interpret the Completed installation materials, and
auxiliary correct drawings personal
terminal to understand protective
cabinet and job equipment (PPE)
distribution requirements in line with job
panel 3.2 Determine the Completed requirements
correct 4.2 Identify the Completed
quantities of requirements
materials and constraints
required as per for cable pulling
job and installation
requirements from the plan
3.3 Select the Completed and site
necessary tools inspection
and equipment 4.3 Set up cable Completed
based on job layout and
requirements installation
3.4 Install auxiliary Completed equipment in
terminal accordance with
cabinets the
according to job manufacturer's
requirements instructions and
job
3.5 Set up auxiliary Completed requirements
main
distribution 4.4 Ensure the site Completed
frames as per is safe and
job secure for cable
requirements installation
pulling
4.5 Select suitable Completed materials to
protective meet the
clothing and required
ensure required specifications
safety devices
are used 5.4 Secure cable Completed
permanently to
4.6 Assess the Completed the support
support structure in
structure to accordance with
ensure it's safe standard
for normal installation
working procedures
conditions
5.5 Maintain the Completed
Perform 5.1 Follow safety Completed proper bending
wiring and procedures radius and loop
cabling lay based on safety tolerance for
out regulations and cable materials
select PPE in at all times
line with safety
requirements 5.6 Follow the Completed
5.2 Identify and Completed schedule of wire
obtain the cutting lists
necessary tools, based on
equipment, estimates,
pulling quantity, and
compound, and sizes to avoid
other safety wastage
requirements for
layout and 5.7 Seek further Completed
installation instructions if
5.3 Ensure proper Completed unplanned
installation and events or
tensioning of conditions occur
5.8 Check the Completed
quality of work
to ensure it
meets
instructions and
requirements
Notify 6.1 Perform final Completed
completion of checks to
work ensure that the
work conforms
to instructions
and job
requirements
6.2 Notify the Completed
supervisor upon
completion of
work
6.3 Clean, check, Completed
and return tools,
equipment, and
surplus
materials to
storage in
accordance with
established
procedures
6.4 Clean up the Completed
work area and
make it safe
according to
OHSA
regulations

__________________ ___________________
Trainee’s Signature Trainer’s Signature
Unit of Competency:
NC Level: __
Learning Task/Activity Date Instructors
Outcome Required Accom- Remarks
plished
___________________ ______________________
Trainee’s Signature Trainer’s Signature

You might also like