Professional Documents
Culture Documents
December 2023
December 2023
,QWHUQDWLRQDO5DLOZD\-RXUQDO
,QWHUQDWLRQDO5DLOZD\-RXUQDO
The mobility transition from road to rail is happening right now. And Knorr-Bremse is driving it
forward – with new developments, high-speed innovation cycles, and stellar quality standards.
We’re pouring our expertise into research and innovation programmes such as the Europe’s Rail
Joint Undertaking. With transformative concepts like reproducible braking distances, the Digital
Freight Train, the new digital electromechanical brake. And other cutting-edge technologies for
eco-friendly travel.
| rail.knorr-bremse.com |
Contact us
Editorial offices
Contents
December 2023 Volume 63 issue 12
7
Kevin Smith
ks@railjournal.co.uk
Consulting Editor/
Associate Publisher IRJ’s Young Rail Leaders Award 2023
David Briginshaw
db@railjournal.co.uk
The industry’s best and brightest
Associate Editor
20 Profiling the 16 winners of this year’s
Robert Preston Young Rail Leaders Award
rpreston@railjournal.co.uk
Business Development Manager
Ann Gamble
South and Central America
20
anngamble@railjournal.co.uk
Production Manager 32 Metro slowly but surely shows its worth
Sue Morant
Metrô Bahia in Salvador goes from strength to strength
sm@railjournal.co.uk
35 Getting Guatemala’s goods to market
Political and administrative issues delay ambitious project
32
Optimising experiences at all points in the modern station
42
Brazil’s MRS Logistics reveals its track renewal strategy
International Railway Journal (Print ISSN 2161-7376,
Digital ISSN 2161-7368), is published monthly by
Simmons-Boardman Publishing Corp, 1809 Capitol
Avenue, Omaha, NE 68102, USA. Printed in Great
Britain by Micropress and distributed in the USA
by Mail Right International, 1637 Stelton Road B4,
Piscataway, NJ 08854, USA. Periodicals postage
Also in this issue Front cover IRJ
December 2023 | Volume 63 Issue 12
valuable asset
something the wider industry with European educational
should take note of, particularly institutions to deliver training
as it looks to combat the well- and instruction better suited to
T HE Covid-19 pandemic,
unprecedented industrial
action, delays to the delivery of
update senior management on
the situation on the ground.
Building a greater sense of
publicised skills and recruitment
challenges that threaten to hold
back much-needed progress in
the needs of the modern
railway (IRJ November p34).
Interestingly, Marleen chose
a new fleet and uncertainty belonging extends to the customer. the coming years. to pursue a career in the rail
over future industry reform are Mann said there has been Industry leaders regularly industry due to its sustainability
among the challenges that increased engagement with the refer to rail’s image problem as credentials. She cares about the
British passenger operator South more than 100 volunteer posing a challenge to its future future of the planet, and she is
Western Railway (SWR) has organisations that help to sustainability. Yet too often it not alone among young people
endured over the last few years. maintain stations across the SWR feels like the sector hides in wanting to make a difference.
Many of these issues have network. The operator has also behind this perception rather This is something that should
been out of the operator’s control. built partnerships with charity than finding ways to overcome and could work to rail’s
And as SWR managing director, organisations, including to install it. As SWR has shown, one advantage when attempting to
Ms Claire Mann, revealed to defibrillators at stations, and has way is to invest in and attract talent. How about
the Rail Industry Association secured funding to improve the champion the talented people launching a recruitment
(RIA) annual conference in appearance of many stations on already working in the sector campaign that really spells out
London on November 2, it its network. “It’s made a who are doing remarkable the important role that rail is
would have been easy for SWR difference to how people feel things to improve rail’s playing, and will play, in
to roll over, and for performance about the railway,” Mann said. performance every day. decarbonising transport, and
and company morale to challenges talented young
“
dwindle. Instead, she focused people to sign up?
on what the operator could Rather than hide behind the
control and improve: its SWR’s Step Up programme is offering negatives and the excuses, it is
people. time to be proactive and sell
SWR has implemented a new support for talented women who want the industry as a place where
strategy in the last two years, ambitious and smart people
which focuses on the to advance to more senior roles. can achieve great things. The
performance of its staff and experiences of our Young Rail
their relationship with Leaders certainly show the
customers. The objective is to Recruitment processes have This is the idea driving our positive impact these people
restore both trust among also been revised, with Mann Young Rail Leaders Award are having. SWR’s work also
passengers and pride in the saying that SWR has altered its (p20). This year’s award feature demonstrates what is possible
railway as a good place to when you invest in rail’s most
job descriptions, objectives and profiles of 16 remarkable
work, which Mann feels has
the way new recruits are people working in a variety of important asset: its people.
been lost. New leadership
training was central to these onboarded. Even apprenticeship roles across the global rail
efforts. Mann said that many of programmes are seeking to industry. Among our winners
SWR’s managers have simply deliberately encourage young are Christoph Seffrin, a project
risen through the ranks by people who love the railway to director at Siemens Mobility,
default, meaning that they did play a part in making it even who has successfully led the
not necessarily possess the better. ICE 3neo fleet project with ks@railjournal.co.uk
people skills integral to The results are impressive German Rail (DB); Nicholas
effective leadership. Specialist with the lowest level of absence Dryer who has pioneered the
workshops attended by 750 due to staff sickness the operator use of drones at BNSF; Mehdi
SWR managers attempted to has even seen as well as Gib, who is advancing the use
address this. “They are good at improvements in train of IoT technology to maintain
the technical side of their job, punctuality. Mann also reports ageing assets in Algeria; and
but they have never had the strong buy-in from staff for the Kateryna Izmailova, who has
training to effectively deliver group’s sustainability plan and worked tirelessly to bring
and lead people,” Mann said. road map to net zero. Feeling veterans back into the workforce
The strategy also emphasises part of something bigger than at Ukrainian Railways.
improving inclusiveness. themselves has similarly Marleen van de Kerkhof also
SWR’s Step Up programme is instilled a sense of purpose in stands out as a Young Rail
offering support for talented maintenance crews who Mann Leader who is tackling the
women who want to advance said are continuing to beat the recruitment challenge head on.
to more senior roles. Assistance odds and get ageing trains into Marleen is leading a group
for people from black, Asian and service, day after day. of young people
minority ethnic communities “We’ve had industrial action working in the
who want to move up into for 18 months now but the rail sector in the
management roles, but perhaps people in my organisation still Netherlands.
lack the confidence to progress, feel engaged because we talked She also is an
is similarly available. Mentoring to them,” Mann says. “We’re advocate for
programmes are also in place open, we’re honest… it’s the wider
throughout the company, important to get people to come adoption of the
including reverse mentoring into work every day and to feel work of the
where frontline staff regularly proud of what they do.” European
4
Shape the future.
With a strong financing partner.
We support all those investing in the future of mobility.
For private companies and the public sector: we work with you to develop solutions that meet your particular
needs. We offer you know-how and experience gained from current projects in your industry all over the
world. Together with you, we can shape the future – with long-term and individually structured financing.
Source: Verkehrsverbund Mittelsachsen
Because the future belongs to those who think ahead. Let’s shape it together.
News | headlines
Australia
Hitachi Rail is due to begin the
First German BEMU fleet enters service: Germany’s first fleet of new battery EMUs (BEMUs) third and final phase of
entered passenger service in the northernmost state of Schleswig Holstein in late October. The first upgrading the interlocking
trains are operating in Kiel on the non-electrified suburban route between the main station and system on Rio Tinto’s fully
Kiel Oppendorf, operated by Errix Holstein. Photo: Keith Fender automated heavy haul network
in the Pilbara region. Following
Photo: Wabtec
Europe
Online ticketing retailer Rail
Europe and Fairlyne, a French
developer of a resale-as-a-
Wabtec unveils first 100% battery-powered heavy-haul locomotive: Wabtec has unveiled the first
service platform for the travel
FLXdrive battery locomotive, which it says is the first 100% battery-powered heavy-haul
industry, have announced a
locomotive for mainline duties. The launch customer is Australian iron ore mining company
memorandum of understanding
Roy Hill, which operates a 344km line in the Pilbara region.
(MoU) to develop a ticket
resale platform for Rail
DB awards high-performance network upgrade contract Europe’s customers. Rail
G ERMAN Rail (DB) has all 20 stations along the route already been secured in the tickets are not typically sold
awarded four contracts to and constructing 15km of noise federal budget. between third parties as the
upgrade the 70km Riedbahn barriers. In order to manage the ticket issuer is usually
between Frankfurt am Main The contracts have been construction workload and to responsible for arranging any
and Mannheim, the first line to awarded to Leonhard Weiss, avoid closing the line during exchanges or refunds.
be upgraded under a new Spitzke, Swietelsky the UEFA Euro 2024 football
accelerated process to create a Baugesellschaft and Siemens championship, which Germany France
high-performance network. Mobility. The work has been is hosting from June 14 to July Rolling stock leasing company
The strategy announced by divided into two lots, for the 14, DB is concentrating Railpool has created a new
the federal government and Frankfurt/Main - Biblis and preparatory works to take subsidiary, Railpool France, to
DB in June 2022 involves the Biblis - Mannheim sections. place in January 2024, which increase activities in what it
full closure of lines to allow DB has significantly will result in the closure of the says is a growing rail leasing
sufficient work to take place in increased the scope of the line between January 1 and 22. market in the country. The 50
order to eliminate the national project to include conversion to DB says this “dress rehearsal” Traxx Universal multi-system
renewals backlog. electronic interlockings, which will also allow it to test locomotives ordered by
The Riedbahn will be closed began in February 2022, while processes and further optimise Railpool earlier this year are
for five months for work the cost of the station upgrades concepts ahead of the full expected to obtain approval to
including the renewal of and an increased price buffer closure later in the summer. operate in France by mid-2025.
120km of track, 150 points and have also added to the overall The full high-performance
140km of overhead line, as well project cost. DB has therefore network programme is targeting Mexico
as signalling and train control increased the funding required completion of upgrades on 40 Mayan Train director general,
systems. DB is also modernising to €1.3bn, of which €1.1bn has route sections by 2030. Mr Óscar David Lozano
Águila, says that the first
GBRfr pioneers digital real-time wagon monitoring section of the new line
construction project will open
12
12 IRJ ???????? 2015 IRJ December 2023
In brief
Korea to support
Photo: Alstom
T HE British government has the railway sector. to legislate within the next Qualifications (RFQ) for a
included a draft Rail Reform The government says the bill session of Parliament. contract to design track and
Bill in the King’s Speech must be scrutinised by “The rail industry has been overhead line systems for the
delivered on November 7, parliamentarians and industry awaiting progress on reform Central Valley high-speed line.
outlining its priorities for the experts due to the scale and since the Williams Review = The San Diego Association
next parliamentary session, the complexity of the changes started over five years ago, of Governments (Sandag) has
last before a general election being made. It also points out culminating in the Plan for Rail appointed HDR to lead
which must take place before that many of the reforms being published in 2021,” says environmental clearance work
January 28 2025. proposed, such as simplifying Mr Andy Bagnall, Rail Partners and advanced conceptual
As a draft bill there is no fares and more pay-as-you-go chief executive. “Delivering engineering for the project to
guarantee that parliament will ticketing, can be introduced that plan remains the best relocate an 8km section of the
have sufficient time to debate without legislation. foundation to build a better Los Angeles - San Diego line
and pass the proposed legislation Rail Partners, which represents railway for Britain, and not within the City of Del Mar.
to establish Great British private-sector operators and seizing the moment now means This single-track section runs
Railways (GBR) as a new freight companies, called the continuing uncertainty until along coastal bluffs threatened
arm’s-length body overseeing draft bill a “missed opportunity” after the next general election.” by rising sea levels. IRJ
IRJ ????????
IRJ December20152023 13 13
News | transit
SJ awarded emergency Stockholm commuter contract Prague selects
G REATER Stockholm Local
Transport (SL) has signed
had difficulty earning
sufficient revenue to deliver
year period with two one-year
extensions from March 3 2024. Škoda for big
an emergency contract with SJ high-quality services, while As part of a supplemental tram contract
P
to operate Pendeltåg commuter rolling stock issues were also agreement, MTR Pendeltågen
RAGUE Transport (DPP)
services in Stockholm, replacing being neglected, which affected will pay SL SKr 580m ($US
has selected Škoda Group
MTR Nordic, a subsidiary of service reliability. 51.6m), comprising an exit fee
as the winner of a tender to
Hong Kong operator MTR. MTR says that since June, of SKr 280m and SKr 300m to
supply up to 200 uni-
MTR Nordic commenced a Stockholm commuter services settle other outstanding issues.
directional low-floor LRVs
10-year contract to operate the have continued to suffer serious MTR Pendeltågen will also
under a framework contract
network on December 11 2016, disruption caused by a shortage transfer inventory, spares and
worth Koruna 16.6bn ($US 720m).
which included an option to of drivers and maintenance assets to SJ. MTR estimates that
DPP will initially order 40
extend to 2030. The contract issues, resulting in cancellations it will need to recognise a
ForCity Plus trams from this
includes train operation, and irregular and delayed charge of approximately SKr
contract, with the first 20
station management and departures. However, the 1bn in its 2023 financial results.
scheduled for delivery in 2025
rolling stock maintenance. company, which had been “Close cooperation between
and another 20 in 2026.
However, SL announced in operating at a loss, was said to SL and SJ is a prerequisite for
The 32m-long, double-
May that it would not be be working hard to improve its this to be successful,” says SL
articulated vehicles have
exercising the extension option financial performance. CEO, Mr David Lagneholm.
capacity for 220 passengers,
and would launch a tender to On November 1, SL announced “The signing of this agreement
including 60 seated.
find a new operator from 2026. that following discussions with marks the start of work to
The contract also includes
At the time, SL said there had MTR and SJ, it has signed a restore stable and reliable
support and development of
been “serious problems” since contract for SJ to take over commuter train services. It will
the vehicle’s onboard software,
autumn 2022, and the current responsibility for operating the take time, but conditions are
licensing of the onboard fault
contract meant the operator network from MTR for a two- now improving.”
diagnosis software, technical
documentation, training of
Vienna’s €2.4bn S-Bahn upgrade project begins DPP employees and 10 sets of
spare parts.
Coventry Very Light Rail vehicle tested on new slab track maintenance and operation for
an initial three-year period.
T HE battery-powered
Coventry Very Light Rail
(CVLR) vehicle under
research centre at the University
of Warwick.
Thinner than conventional
weeks by civil works contractor
Galliford Try. The VLRNC test
track includes a tight curve and
The line will have 14 stations,
including seven elevated and
five underground, and will
development in the West light rail track, the new design a 250m vertical hump, as both interchange with the existing
Midlands in Britain has been can be laid just 300mm deep into are significant challenges for Centrepoint and Creek
successfully tested on a new the road surface, reducing the traditional slab track designs stations, the termini of the Red
design of slab track that avoids need to divert all underground that add to the cost and delivery and Green lines, respectively.
the need for expensive and utility pipes and cables, which time of light rail projects. The contract also includes
time-consuming utility diversion. can add significant cost and Combined with the battery- the supply of 28 driverless
The new slab track has been delay to light rail projects. powered CVLR vehicle, it is trains, the construction of a
designed by engineering The new track design was hoped that the new track system depot to accommodate up to
consultancy Rendel, working installed at the Very Light Rail will enable cities to install rapid 60 trains, and the construction
in conjunction with the WMG National Innovation Centre transit systems much more quickly of all associated roads, facilities
international manufacturing (VLRNC) in Dudley in a few and at a significantly lower cost. and utility diversion works.
T
2019. The introduction of the
HE 8.7km Agargaon -
new vehicles follows a test
Motijheel section of MRT
phase lasting several months.
Line 6 in Dhaka, Bangladesh,
opened on November 5, with Edmonton
trains operating every 10 The much-delayed 13km
minutes from 07.30 to 11.30. Valley Line Southeast light rail
Only two intermediate
line opened on November 4.
stations at Farmgate and
The line runs from downtown
Secretariat (Press Club) are
Edmonton south to Mill
currently open, with the
Woods. LRVs are operating at
remaining intermediate
First new London Underground Piccadilly Line train presented: five-minute intervals at peak
stations at Karwan Bazar,
Transport for London (TfL) and Siemens presented the first of times and 10 minutes off-peak.
Shahbag and Dhaka
the New Tube for London trains being built for the Piccadilly The line serves 11 stops and is
University expected to be
Line at the Wildenrath test centre in western Germany on operated with a fleet of 26
completed in February 2024.
November 16. The 94 nine-car Piccadilly Line trains are being Flexity LRVs supplied by
The first 11.7km section of
supplied under a £1.5bn contract awarded in 2018. They will Alstom.
Line 6 opened on December 28
replace the existing fleet of 86 six-car trains introduced between
2022 from Uttara North to
1975 and 1977. Each train is formed of five long and four short
Agargaon. According to Mr M
Manila
cars with the short cars cantilevered between the five long Loan agreements and further
A N Siddique, managing
vehicles which are mounted on bogies. Photo: Keith Fender consultancy contracts for the
director of Dhaka Mass Transit
Metro Rail Transit Line 4
Company (DMTCL), Line 6 is
Helsinki - Espoo light rail line opens currently used by 90,000
(MRT-4) project in Manila will
H
now be signed next year. This
ELSINKI’s light rail Line between the two cities, the passengers a day, which is
expected to rise to 500,000 is a year behind the initial
15 opened on October 21 construction consortium, and
passengers a day when all target for concluding funding
ahead of schedule, providing the project design team, which
stations are fully operational. agreements.
an alternative to the congested comprised Ramboll Finland,
Each train on Line 6 can
bus route 550, the busiest in Sito, and VR Track.
accommodate up to 2300
Paris
Helsinki. The 25km line runs Services will initially operate RATP, French National
from Itäkeskus in Helsinki to every 12 minutes, with this passengers. The maximum
Railways (SNCF) and Île-de-
and Keilaniemi in Espoo, with increasing to every six minutes speed is 110km/h.
France Mobility have awarded
16km in Helsinki and 9km in following the delivery of more A further 1.16km extension
Alstom a 12-year framework
Espoo. LRVs. HKL ordered 29 LRVs from Motijheel to Kamalapur
contract worth almost e300m
Line 15 runs mostly on a from Škoda subsidiary railway station is expected to
be completed by June 2024, to equip RER lines B and D
dedicated right of way and has Transtech in 2016, exercising
taking Line 6 to its full length with NExTEO CBTC. Alstom
34 stops located on average an option from a contract for
of 21.26km. In total, the will equip a total of 350 trains
every 800m. The line serves up to 90 LRVs that was
elevated Line 6 is expected to and 100km of the two lines.
Itäkeskus, Aalto University awarded in December 2010.
have cost Taka 334.72bn ($US
and Keilaniemi metro stations Up to six more light rail lines
3.04bn) to build.
Rome
and Oulunkylä, Huopalahti are planned in the Helsinki Construction is now in full
and Leppävaara railway region by the mid-2030s, with Construction of Dhaka’s
swing of Piazza Venezia
stations. the Kruunusillat line the next first underground metro line,
station, which will become a
Construction began in 2019 to be implemented. The city MRT Line 1, was inaugurated
central hub of Line C, Rome
and the project was council of Vantaa also voted in on February 2, and work
started on the 20km MRT Line Metro’s first fully automated
implemented using an alliance favour of building a light rail
5 on November 4. metro line. Piazza Venezia is
model based on a contract line on May 22.
at the western end of the 3km
Section T3 of Line C which
Singapore line upgrade projects completed will run via Colosseo/Fori
Imperiali and Porta Metronia
S INGAPORE’s Land
Transport Authority (LTA)
has completed a project to
December 2016, while the
replacement of the third rail
and installation of CBTC were
NSEWL significantly. The
NSEWL has recorded a mean
kilometres between failure
to San Giovanni. Section T3 is
currently 91% complete and is
scheduled to open in 2025.
renew and upgrade the North- completed in September 2017 (MKBF) performance of more
South and East-West lines and 2018, respectively. than 1 million train-km since Toronto
(NSEWL). Since then, work has focused 2019, compared with 70,000 Alstom has delivered the first
Starting in 2012, the renewal on the renewal of track circuits, train-km and 60,000 train-km of 60 low-floor Flexity LRVs to
and upgrade of the NSEWL’s power supply, and trains. All on the NSL and EWL Toronto Transit Commission
six core systems was three systems have been respectively in 2012. (TTC) as the first step in
conducted in phases, in close equipped with condition In July 2018, LTA awarded a fulfilling a contract signed in
collaboration with operator monitoring to allow faults to contract to Bombardier, now June 2021. The remaining
SMRT. The replacement of be pre-emptively addressed. Alstom, for the supply of 66 LRVs will be delivered by
wooden sleepers with concrete LTA says that work has trains. Another 40 trains were 2025. IRJ
sleepers was completed in improved the reliability of the purchased in 2020.
T HE United States’ Federal signalling and stations. worth €950m to maintain, the companies participating in
Railroad Administration Amtrak CEO, Mr Stephen overhaul, service and clean the the Request for Information
(FRA) has awarded $US 16.4bn Gardner, says the funding will fleet of 34 class 220 Voyager (RFI) exercise requested an
in funding for 25 passenger help to advance its plans to and 24 class 221 Super Voyager extension to the original
rail infrastructure modernise the NEC “and unlock diesel trains operated by November 15 deadline.
improvement projects along major bottlenecks on the busiest CrossCountry, owned by = Alpha Trains has ordered 12
the Northeast Corridor (NEC) rail corridor in America.” rolling stock leasing company Euro 9000 locomotives from
through the Federal-State The new funding is part of Beacon Rail. The fleet will be Stadler, the first time it has
Partnership for Intercity the $US 66bn allocated to fitted with an Intelligent ordered this locomotive type.
Passenger Rail Programme passenger rail in the Biden Engine Stop Start (IESS) system The six-axle multi-voltage
(Fed-State NEC). Amtrak will administration’s Infrastructure to help reduce fuel consumption, hybrid locomotives will be
receive nearly $US 10bn for the Investment and Jobs Act. The emissions and operating costs. delivered in 2025 and 2026.
12 projects it will lead. FRA awarded Amtrak nearly = Akiem has awarded a
The 735km NEC links Boston, $US 200m through the Czech Republic contract to Newag for 30
New York and Washington, Consolidated Rail Infrastructure The European Investment Dragon 2 electric locomotives.
DC, carrying approximately and Safety Improvements (Crisi) Bank (EIB) has agreed to lend The contract, which includes
2200 Amtrak, commuter and grant programme in September. Koruna 24bn ($US 1bn) to the maintenance for eight years,
freight trains on some portions Amtrak expects to receive further Czech Ministry of Finance to will be worth nearly €500m if
of its route each day. grants to improve its long- assist infrastructure manager an option for another 50
FRA funding will support distance and state-supported SŽ in the modernisation of locomotives is exercised.
the replacement or upgrade of services outside the NEC TEN-T lines in the Czech
12 major bridges and tunnels through the FRA’s Corridor ID Republic and facilitate the Namibia
on the NEC, as well as Programme and the Fed-State deployment of ERTMS. African Development Bank
renewals and upgrades to Partnership Programme by the = Czech Railways (ČD) has Group (AfDB) has approved a
track, traction power supply, end of this year. exercised an option from a $US 196.43m loan to cover
framework contract with Pesa 51.8% of the cost of the second
Austria to invest €21.1bn in rail Bydgoszcz, Poland, for 30 phase of Namibia’s Transport
Infrastructure Improvement
infrastructure in 2024-2029
additional Regiofox DMUs,
taking the number of trains Project (TIIP). The Namibian
A USTRIA’s Climate Protection Ministry will provide €21.2bn ordered from the contract government will fund the
for infrastructure investment under the 2024-2029 framework signed in 2021 to 106 sets. The remaining 48.2%.
plan agreed with Austrian Federal Railways (ÖBB) to encourage new agreement is worth
modal shift by providing more capacity on new and upgraded Koruna 3bn ($US 130m).
Portugal
The government plans to invest
lines.
The delivery schedules and cost of ongoing projects will be France €1.34bn in rail and public
The Auvergne-Rhône-Alpes transport in 2024, a 23% increase
adjusted, ÖBB says, but major projects such as the Semmering
(Aura) region will invest on the €1.09bn invested in 2023.
Base Tunnel, the new 250km/h Koralm railway under construction
€5.7bn in local rail services by
between Graz and Klagenfurt, and the Brenner Base Tunnel will
2035, with the aim of increasing
Romania
continue as planned. Railway Reform Agency (ARF)
Investment will also focus on expanding urban rail services., service frequencies by 30% and
has awarded a contract for the
making regional services more attractive and electrify more growing traffic from 220,000 to
supply of 62 Regio RE-R
lines. 300,000 passengers a day. €3bn
EMUs for regional services,
ÖBB points to studies demonstrating that €1 of investment in will be spent on 130 new
worth Zlotys 3bn ($US 730m).
rail creates value of €2 for the national economy and says that a Alstom Régio 2N double-deck
€1bn investment project will generate around 15,000 jobs during EMUs while the remaining Switzerland
the construction phase. €2.7bn will be spent on Matterhorn Gotthard Railway
New projects include a new line between Köstendorf and infrastructure. (MGB) has signed a contract
Salzburg, providing four tracks in the Salzburg area, increasing worth SFr 266m ($US 295m)
freight capacity by providing more passing loops, and a Germany with Stadler for the supply of
marshalling yard modernisation programme. The federal government has another 25 Orion three-car
In addition to the €21.1bn being provided for investment projects, reached an agreement with the rack EMUs. Delivery of the
ÖBB will receive €4.7bn for the maintenance of the national rail states to continue funding the metre-gauge trains will start in
network in 2024-2029. Deutschlandticket in 2024. autumn 2025.
The ticket, which offers
unlimited travel on all regional United States
and local transport for a flat fee Voters in Cincinnati have
of €49 per month, was introduced granted Norfolk Southern (NS)
in May 2023 following the permission to purchase the
successful three-month 9-euro City of Cincinnati-owned
ticket initiative in summer 2022. Cincinnati Southern Railway
(CSR) for $US 1.62bn. The
International 532km line connects Cincinnati
The deadline for the submission and Chattanooga and has been
of concept proposals for the operated under a lease from
Kuala Lumpur - Singapore the city since 1881. IRJ
T
HE global rail industry is not particularly innovative, meaning digital technologies - in all corners of
experiencing two concurrent attracting the most talented people is the world. All of our award winners are
human resources challenges: the proving difficult. below the age of 40 and many look well
impending retirement of a significant Scratch below the surface of these placed to become leading figures in
proportion of its experienced and perceptions and you find a growing their respective companies in the years
knowledgeable workforce; and an cohort of talented and highly regarded to come. We hope that bringing their
ongoing battle to secure a new young people who are doing remarkable work to the industry’s wider attention
generation of talent versed in the digital things. In IRJ’s second Young Rail will support their progress in some way
skills the sector requires to progress. Leaders Award we aim to bring many and also inspire others to follow in their
Losing years of experience and of these individuals to light by telling footsteps.
industry know-how could set the sector the stories of their careers and most Don’t see your colleague on our list?
back by many years just when it is noteworthy experiences. Don’t worry, we plan to run the
under pressure to get more trains onto Our 16 award winners work in a initiative again in 2024. Also keep an
track. Rail also has a reputational issue. variety of roles across the industry - eye out for nominations for our Women
It is often perceived as a dirty and from project management and track in Rail Award, which we will feature
dangerous working environment that is engineering to advanced signalling and next June.
U
As the war progressed, Kateryna was remotely. “I went to his hospital,
KRAINE’s national railway has the initiator of the “Return to the Iron prepared the documents and helped to
experienced significant hardship Family” project, which involves organise his training,” Kateryna says.
since the Russian invasion of retraining employees injured during the “These types of cases soon became
2022. However, the enduring spirit of war and adjusting the workplace so it is more common so we decided to turn it
its employees helped Ukrainian suitable for them to return to work. UZ into an official programme.”
Railways (UZ) to successfully support has provided psychological support for Kateryna has also been a key
the evacuation of thousands of people the veterans. UZ is working to train its representative for UZ employees. As
in the early days of the conflict, and to own personnel as well as full-time the head of the Youth Council of the
keep the railway operational as the war psychologists to undertake this work. Trade Union of Railway Workers and
has continued, despite ongoing damage An example of an employee that has Transport Builders of Ukraine she has
to infrastructure and assets. been through the Return to the Iron fought tirelessly during negotiations to
Kateryna Izmailova has played an Family project is Andriy Sobkovskyi, a reinstate suspended payments for workers,
active role in helping to evacuate 22-year-old who tragically lost his legs particularly younger employees.
Ukrainian citizens by rail to safety after a Russian rocket hit the barracks Kateryna says her career objective is
during the early weeks of the conflict. in which he was staying. He was found to continue to campaign for fair wages,
She helped coordinate efforts to provide 12 hours later, still alive under a pile of to end discrimination in the workplace,
food to passengers and conductors rubble. Sobkovskyi was discharged in and for fair interactions between
onboard trains while also supporting September and went on sick leave from colleagues. She is credited with using
critical thinking to overcome challenges,
taking her time before making sound
and consistent decisions, for being
comfortable with leading negotiations
and adept at identifying partners to
implement ideas.
“You can come to her with any
request and she will find a way to
process it and help you,” her nominator
writes. “Kateryna is the kind of person
who will always find a way out of any
situation. She made her way from being
an ordinary employee to the head of
her department. She enjoys respect
among her colleagues and management
listens to her. She is a courageous and
purposeful person.”
H
worked to ensure sufficient availability education in the state of Jharkhand.
AILING from the small town of of both manpower and materials so this Nitansh’s short-term objectives include
Solan in the foothills of the work could continue during Covid working to expand KPIL’s activities
Himalayas, Nitansh Platia really restrictions. He initiated online meetings beyond India. He has already identified
found his feet after making the bold to keep teams connected and accessed areas where it could deliver railway
decision to attend a college in Bhopal, more special funding to pay for sanitising projects and a dedicated team, established
than 1000km away. A willingness to workplaces and to provide protective by Nitansh, is now meeting the necessary
throw himself into public speaking and clothing and equipment where required. technical requirements and bidding for
cultural clubs while at university helped Rather than hindering project delivery, contracts. He hopes that this work will
Nitansh overcome his natural shyness. the pandemic proved an opportunity to further establish the company as a major
A presentation during his final year at accelerate work, as fewer train presence in the global railway industry
the Indian Institute of Technology (IIT) at movements provided more time on the and reinforce his position as a
Delhi in 2007 was a critical moment and track to complete electrification. Nitansh prominent Young Rail Leader.
A
contributions is equally exceptional,”
NY visitor to Progress Rail’s on a part-time basis. She has also spent her colleagues state. She is a worthy
facility in South Queensferry, a considerable amount of time away recipient of IRJ’s Young Rail Leaders
Scotland, is likely to be quickly from home in the past 14 months while Award.
introduced to Dr Hannah Persson, a she qualified as a flash butt welder.
senior design engineer. Hannah is Hannah is a passionate advocate for
described as “an engaging person who greater inclusion in the rail industry, in
represents the best of our company,” by particular for women. She is currently
her colleagues. During site tours she involved in the Unblocking the Equality
regularly offers expert insight into the Pipeline in Mechanical Engineering
complexities of Progress Rail’s products project with her alma mater, Heriot-
and processes in an engaging manner, Watt University in Edinburgh, and Nile
leaving visitors informed. She University in Giza, Egypt. The two
“genuinely promotes how we add value universities are establishing networks of
to our customers,” a colleague states. mechanical engineering students and
Hannah has a PhD in cast crossing alumni to raise awareness of gender ratios
design and analysis, and her academic from early education to the highest levels
studies challenged existing in the profession, to assess whether these
preconceptions in this field. Her work on ratios are changing, and if not, what can
bearer spacing resulted in a change in the be done to accelerate the pace of change.
next-generation of crossing design for Other outreach work includes assisting
Network Rail, Progress Rail’s key British with school, university engineering site
client. Hannah also makes daily decisions visits tto help raise awareness of Stem
on whether a crossing should be careers in the rail industry. She also serves
scrapped and balances product needs as the vice-president, Scotland, of the
J
complex engineering problems and
AMES Zhang has been involved in delivering innovative railway solutions.
a range of railway infrastructure His nominator says he is committed to
projects during his career, including further integrating cutting-edge
in his early years in the industry while technologies such as BIM and modular
working in his home country of construction techniques to improve
Australia, and later in Hong Kong and project efficiency and quality. He also
Thailand. Two major highlights are his wants to implement sustainable practices
work to lead design of the Tung Chung in his projects, raising the standards of
East station on the MTR Tung Chung railway infrastructure development. make him an exceptional asset to any
Line in Hong Kong and OR19 station on James’ status as a Young Rail Leader project,” his nominator writes.
the Orange Line metro in Bangkok. is emphasised by his success in leading “Foremost among these is his
These complex projects have showcased a multi-disciplinary team to deliver the proactivity. He doesn’t just react to
James’ capability to effectively design design of the entire Tung Chung Line challenges as they come; he anticipates
both surface and underground stations. station project. A notable initiative was potential issues and addresses them
On the MTR project, James served as the bringing his design team together with before they become problems. This
design team lead and introduced engineers on the ground to improve proactive mindset has been instrumental
innovative design solutions to enable project delivery. He also regularly made in maintaining project timelines and
delivery under a fast-track construction high-level decisions, liaising with ensuring the smooth execution of tasks.
programme. He implemented the government authorities for approvals, “James is also highly engaged in his
reduction of station length, the adoption and coordinating with the end client to work. He’s not just interested in ticking
of modular and precast construction ensure timely delivery. The project is off tasks on a checklist; he genuinely
methods, and established a robust system now in the detailed design and cares about the projects he works on
for managing design coordination construction phase, and key milestones and the teams he leads. He takes the
throughout the project. including the start of piling work have time to understand all aspects of a
In addition, his use of Building been met ahead of schedule. project and is always willing to go the
Information Modelling (BIM) throughout “James possesses several qualities that extra mile to ensure its success.”
M
ARLEEN van de Kerkhof which she says is critical to achieve
plays a key role in the these ambitions. She is convinced this
international activities of can be facilitated by accelerating the
Dutch supplier Dual Inventive, which is cross-border implementation of digital
a developer of wireless technology technologies. For example, she cites
products that are designed to make Dual Inventive’s digital systems for safe
working on the railway safer and more track access, which enable infrastructure
efficient while also boosting the capacity managers to offer instant and safe track
of existing infrastructure. access, minimising disruption to rail
Marleen has supported the company’s operations by reducing the duration of
growth. However, she is also steadily temporary capacity restrictions.
building a profile as a passionate rail Among the company’s innovative
ambassador in Europe, particularly to approaches to encourage innovation is
support growing rail’s market share to the opening of research and development
achieve carbon neutrality. centre, FieldLab Rail. Here young
Indeed, Marleen says she was graduates are encouraged to pursue
inspired to enter the rail sector by the their own projects often in the digital
need to address climate change. She technology space but with a focus on
worked on a Hyperloop project while rail using the facilities at their disposal.
studying systems engineering at Delft The company has also established a
University of Technology. And while partnership with the National Rail
impressed by the concept, she felt work Educational Centre (Railcenter) based in
to reduce transport emissions should Amersfoort where new innovations are
focus on improving the extensive tested and advice can be sought from
infrastructure that we already have, experts.
Marleen van de Kerkhof including Europe’s railway network. Unfortunately, Marleen has found that
International Affairs Manager, Marleen believes that growing rail’s Dual Inventive’s approach is the exception
market share is crucial for helping rather than the rule and believes that such
Dual Inventive, The Netherlands Europe achieve carbon neutrality and is initiatives should be extended more
Age: 31. Years in the Industry: 6 a strong proponent of the Single broadly to other European research and
European Railway Area, delivery of educational institutions. (Continues on p24)
CONGRATULATIONS TO HANNAH
AND TO ALL OF THE WINNERS OF THE
IRJ YOUNG RAIL LEADERS AWARD.
230058
which describes the order as one of its other’s situation - he spent a lot of time
largest ever industrial projects. at Bombardier’s bodyshell production
The person responsible for overseeing site in Wroclaw, Poland, which was
the programme is project director, specifically set up for the project. “There
Christoph Seffrin. Christoph has worked was a definite learning curve,” he says.
in various high-speed rolling stock project “It gave me a lot of insight of how to
management roles during his 12-year career manage what is important at these types
with Siemens Mobility. The ICE 3neo, of production sites.”
however, was his first as project director. Christoph was approached to work on
Christoph says he has followed the what would become the ICE 3neo project
typical career path for a project manager as Siemens Mobility was reaching the
at Siemens Mobility, beginning as a sub- conclusion of the tendering process in
project manager, where he was February 2020. Yet there was one caveat:
responsible for one area of the train, before the strict delivery schedule of just two-
taking a major step up to become deputy and-a-half years, the fastest-ever for a
project director for the ongoing ICE 4 Siemens high-speed train project.
project to supply 137 trains to DB in 2016. The train is based on the Velaro D
This project was delivered by Siemens (ICE 3), a project that suffered some
Mobility and Bombardier (now Alstom) technical problems and delays. While
as a major subcontractor. Christoph some doubted whether the ICE 3neo
worked on it for three-and-a-half years project could be done in such a short
and was responsible for the Bombardier time, Christoph says his familiarity with
element of the project, for change this train platform and understanding of
Christoph Seffrin management, the entire production side, what went well and not so well
Project Director, Siemens and supplier management. previously gave him the confidence to
Mobility, Germany “I had time to learn what is important take up the challenge.
in a big project like this,” he says. If the strict delivery timeframe was not
Age: 39. Years in the industry: 12 “Especially of how to work with DB and enough, the project was finalised and
T
HE new ICE 3neo is a central also working with Bombardier. As you commenced in mid-2020 at the height of
component of German Rail’s (DB) can imagine, it’s not always easy when the Covid-19 pandemic, requiring a total
future long-distance fleet. DB you have to work so closely with one of rethink of how a project of this scale could
signed a framework contract with your competitors. I really learned a lot, be managed and delivered effectively.
Siemens Mobility for 90 of the multi- including how to solve conflicts and Christoph says he focused management
system, 320km/h trains in July 2020, how to manage critical situations.” on three key elements: his team; the
initially ordering 30 eight-car sets and Consortium projects are always very customer; and the train.
placing further orders for another 43 in challenging. Especially when the share For his team, he says he had the
January 2022 and 17 in May 2023. The of scope between both parties is very freedom to choose who he wanted to work
first four class 408 trains entered service large. He says effective communication alongside, selecting people he trusted
on time in December 2022, a major was essential to overcome this challenge from previous projects. He also chose to
achievement for Siemens Mobility, as a well as good understanding of each focus their efforts on the December 2022
24 IRJ xxxxx 2016 IRJ December 2023
deadline. “It was very simple, very Christoph says. “Every week, they knew solutions if parts are missing. And
transparent. It doesn’t matter if you’re at everything about our time schedule and during commissioning, when we have had
home online, we have this one goal,” he what was happening. It is very open, delays, we have found new techniques
says. “It was also important to and potentially very risky. But I think if and how to implement them in our
acknowledge and celebrate success, you show the customer this kind of trust, factory. It’s natural for Siemens Mobility
especially when working from home.” he will show it back to you. It proved to be flexible, but you still have to guide
For the customer, Christoph says that especially useful for certification of the train.” the team, manage them, support them
normally he would try to bring the and trust that they will succeed.”
customer and his teams together Delivery of the ICE 3neo fleet is
physically so they could understand each The train continuing. “Every train is on time,” he
other better. During the pandemic this For the train itself, Christoph says says, adding that this success is resulting
required a creative approach: the Project close relationships with all managers in a change in the project’s scope from
Acceleration and Coaching Teams (Pact) within the project, in purchasing, delivering 10-12 trains per year to 17 from
Workshop. During this initiative in summer engineering, production, commissioning, the start of 2025. “I think this underlines
2020, around 60 people from Siemens certification, and warranty, were essential the customer’s trust in our project, our
Mobility and DB gathered for a day-long for success. This helped to maintain a product, and our team,” Christoph says.
workshop in an unusual location, on the consistent time schedule for delivery by As for his own future, Christoph hopes
roof of a car park at Siemens’ Erlangen providing a buffer of available stock for he might one day be able to apply his
site. Standing 2m apart and in the fresh vital components, which became especially experience and skills gained on ICE 3neo
air, people working across the project important with the challenges posed to to an international project. He says he is
could interact and get to know each the supply chain after the outbreak of particularly intrigued to see how his ideas
other, which would benefit future work. the Ukraine war. With the project “set of co-creation would work effectively
Further close collaboration was up on a really stable basis,” Christoph beyond DB. Another potential avenue is
reflected in a concept that Christoph has says the team was able to ride out this to lead other project managers at Siemens
pioneered called co-creation. Rather than storm and ultimately succeed, even Mobility. Certainly, Christoph’s success
observe the project from a distance, DB exceeding expectations by delivering the is likely to prove an influential model
became an active part of the project first four trains a full week early. for future large-scale Siemens projects in
management team, often taking a decisive “With production, we have to be very the future, in which he is likely to play a
role. “I think this is very powerful,” flexible,” he says. “You have to find central role.
BNSF.com/Careers
December
IRJ XXXXX 2023 25
2016 25
IRJ Young Rail Leaders Award
Darin’s journey with PTC began PTC, according to his nominator.
following his selection to contribute to Darin’s transition to a leadership role
various important PTC initiatives in the coincided with the start of the Covid-19
early years of his career, including being pandemic. While always valuing face-to-
part of the team responsible for face interaction for building
implementing one of the first PTC- collaboration, he successfully managed
equipped railway subdivisions in the to replicate this in a remote working
country. environment, developing practices that
Building relationships throughout the were rolled out across the railway. In
railway was a key part of the successful addition, Darin’s recognition of the
delivery of the PTC projects on which importance of metrics has driven high
Darin has worked. He has worked closely levels of success in PTC by effectively
with signalling teams to install hardware identifying accomplishments and areas
and software; with network operations for improvement.
centres to coordinate implementation; “By leading by example and promoting
with track crews and inspectors to a shared sense of responsibility, Darin
Darin Shelor coordinate and validate installation; and his team have achieved and
Senior Director, Advanced Train with suppliers to deploy new software; sustained success with our train control
Control, CPKC, United States with back-office teams to validate PTC; systems,” his nominator states.
and with other railways to deliver Darin’s infectious leadership style also
Age: 36. Years in the industry: 13
T
seamless integration and compatibility. played a crucial role in the success of
HE rollout of Positive Train Darin says there was early recognition the merger to create CPKC
Control (PTC) as a universal in the PTC programme that despite Among current PTC projects are the
signalling and train control often being competitors, everyone was introduction of “self-healing” technology,
technology was perhaps the defining united by a shared understanding that proactive monitoring, and integrating IT
achievement for US railways in the “we were, and still are, in this together.” solutions that directly translate into
2010s. It is also providing the foundation Darin has continued this spirit of business time savings. PTC is not
for future technological advance, collaboration in his work at the railway, standing still, and Darin believes his
including at Canadian Pacific Kansas including in his transition to a senior team possess the necessary skills and
City (CPKC), where Darin Shelor, is leadership role. He attempts to foster an resources to deliver CPKC’s future
playing a key role. environment of high standards: he says safety and operational initiatives. This
PTC has been a consistent presence he will not ask his team to perform a includes pushing the boundaries of the
throughout Darin’s 13 years with the task that he would not do himself. This train control technology and potentially
railway. Indeed, he says “it is surreal to approach ensures that everyone is opening new possibilities for the railway
think how deeply I now understand a committed to delivering exceptional of the future, in which Darin is well
field I never imagined being part of.” results and upholding the integrity of placed to play an influential role.
with the answer now staring them in enable them to develop the necessary
Se Yeon Won the face, Se Yeon convinced his seniors technology and expertise.
Manager, Korail, Korea to back his proposal. Se Yeon is described by his nominator
Age: 35. Years in the industry: 7 A task force was subsequently as a colleague “that everyone wants to
I
established to implement Se Yeon’s idea work with because he is very kind and
N a country with a traditional and oversee the new administrative calm even in difficult situations.” He
hierarchical working culture like process that has been introduced for also works hard, even staying late at the
Korea, convincing senior leaders to purchasing components. Effective office when working with colleagues
embrace a new idea might appear a communication was again critical to Se overseas to achieve the optimal result. It
daunting if not futile task, especially if Yeon’s success as he brought together a appears he has a bright future. “I have
that idea comes from a younger, less diverse group of management, high expectations for him to become a
experienced member of the team. procurement and technical staff to form competent executive within Korail,” his
Yet Korail’s Se Yeon Won was not to the new group. And it has been a great nominator states.
be deterred. He spotted an opportunity success. Purchasing costs have been
in February 2020 to reduce the cost of reduced by Won 1.6bn ($US 1.2m)
procuring spare parts and maintaining while Se Yeon has also identified
the components and systems of Korail several domestic companies capable of
rolling stock by turning to domestic repairing every component.
rather than international suppliers. He By repairing rather than replacing
subsequently made it his mission to items such as transformers, traction
convince decision-makers to back his motors and brake cylinders, Korail is not
proposal. only saving money. It is also assisting
With colleagues initially not convinced the expansion of Korean small and
by his idea, Se Yeon gathered product medium-sized companies into new
specification data and estimate sheets areas. Se Yeon has provided these
and compared them to find the suppliers with access to testing facilities
evidence that his approach was correct. and technology at Korail. They are also
This was a time-consuming task. But receiving advice on securing grants to
I
in the field, factory or office. More than
T is not unexpected that a director of ongoing challenges of recruitment, 200 Loram leaders as well as those from
human resources will strive to do particularly for field operations. More several of its customers have benefitted
their utmost to support a company’s than 33,000 people from across the US from this training.
employees. Yet Alexander Clark goes applied for 350 positions with a four to Among future initiatives is the use of
above and beyond what is required. A six-week onboarding process. Yet AI systems to improve HR processes,
self-starter, and someone willing to take candidate fallout exceeded 1500 people, including becoming more competitive in
the initiative, Alexander has made notable significantly increasing costs. securing and deploying talent. “Alex
contributions to improving worker safety, To address this, Alex and his team embraces change and leverages
offering support for the military community, completely overhauled the talent technology and process efficiencies to
talent acquisition and leadership since acquisition and onboarding process. support the company’s objectives,” his
joining Loram just 18 months ago. Through better targeted recruitment nominator writes. Certainly, his work has
To improve safety, Alex identified a activities, the introduction of assessments helped to enhance Loram’s performance
solution to assess an employee’s mental to identify candidate suitability for and will go a long way to delivering
alertness without the presence of a safety-related roles and duties, as well improvement in the future.
Congratulations to Greenbrier’s
JAMIE
CALDWELL
and all the outstanding
recipients of the 2023
International Railway Journal’s
YOUNG RAIL
LEADERS AWARD.
www.gbrx.com
JAMIE CALDWELL
Sr. Manager, Customer Experience
IRJ XXXXX 2016 27
T
HE use of drones by railways has hundreds of employees throughout
become an increasingly effective BNSF and his strong reputation means
way of inspecting assets. At BNSF, that other departments often come to
Nicholas Dryer has been instrumental in him for advice and support.
developing new and innovative ways of His dedication is reflected in how he
using drones to serve the Class 1 freight consistently supports the night shift
railway. For example, he recently set up after he has completed his day shift to
an aerial surveillance solution to help ensure his team works seamlessly with
deter and stop theft from freight trains, other departments.
with the solution responsible for several He also works with people outside of
arrests and the recovery of stolen items. the railway, whether that is working on
In addition, Nick developed a drone- science, technology, engineering and
based solution for yard security and mathematics (Stem) programmes at
inventory and has acted as the product local schools, supporting internships
owner for “Uber for drones” software and offering tours of BNSF’s operational
that handles requests from BNSF headquarters. He has also worked with
departments to capture imagery, perform police departments to offer advice and
a service, or report results to drone-trained assistance as they have set up their own
BNSF employees in the field. Likewise, drone programmes.
Nicholas Dryer Nick assisted with the development of a Nick is able to identify alternative
Senior Manager, Technology software solution to manage and solutions to big problems that have
Services - UAS Programme, disseminate imagery captured by drones. historically only been partially solved or
Nick is described by his nominator as not at all. “Nick is an asset to not only
BNSF, United States a dedicated, reliable, innovative and his team and BNSF but to the rail
Age: 37. Years in the industry: 18 resilient employee. He works with industry as a whole,” his nominator says.
I
N April 2020, in the first weeks of the Covid-19 pandemic, for the Prototype Centre after taking over its leadership in
a young doctor at one of Canada’s “hot clinics,” where 2018. He implemented a new strategy for rolling stock
medical teams were triaging Covid patients, told local media component validation as well as service activities. Under his
that the clinic was so lacking in personal protective equipment leadership, the St Bruno centre also became Alstom’s first 3D
(PPE) that medical staff were forced to purchase scuba masks printing site in the Americas.
from a nearby department store to continue working. In his current role leading the entire project engineering
This dire situation spurred David Benguigui into action. community for rolling stock components, David has put
David at the time was the general manager of the Prototype together a dedicated group to support projects already in
Centre and head of validation and verification at Bombardier’s revenue service and offer additional value to customers by
(now Alstom) site at St Bruno, Quebec. In just a few days he increasing reliability and warranty support.
reorganised the centre, recalled staff who were on furlough, David also is praised for his ability to empathise and listen
and developed a prototype visor. Within four weeks, David and to his team. He also extends this to commitments outside work,
his team were able to deliver 40,000 certified visors to the Quebec including as a director of Le Transit crisis centre, a facility for
provincial government for distribution to medical centres. people with severe mental health issues, and as a voluntary coach
David’s entrepreneurial spirit is reflected in his work on of a children’s rugby team. “His project management and delivery
more conventional projects for Alstom. He is currently skills are exceptional, and he has a talent for synthesising
managing project engineering director for Alstom’s North information to provide clear and concise insights that help
American Rolling Stock and Components division as well as people make decisions quickly,” his nominator writes.
serving as the bids technical manager for the North America “David’s business acumen and understanding of operations
and Monorail product line. He has worked on metro, light have been invaluable. Overall, he is an exceptional leader with
rail, monorail and automated peoplemover contracts in North much to offer any organisation.”
M
to replace the entire system, his friend
EHDI Dib’s journey into the asked him to come up with a more cost-
railway industry is perhaps effective solution that would retain the
slightly unconventional. His existing display. Mehdi says he reverse-
academic background is in robotics and engineered all the mother board and
industrial computing, and while a native server cards, to come up with a solution.
of Algeria, he won a scholarship through When attending the station’s grand
the Swedish Institute’s Young Leaders reopening, an event attended by the
Visitors Programme. While in Sweden, minister of transport and the CEO of
28 IRJ xxxxx 2016 IRJ December 2023
Algerian National Railways (SNTF), system equipped with cameras and and accessible technology to do so.”
Mehdi recalls how the old-fashioned sensors and worked with Stadler to install Looking ahead, Mehdi believes that
appearance of the split-flap display was this on a Flirt EMU operating on the RER. greater availability of data now readily
criticised. He quickly passed the SNTF The system can precisely locate collected from railway assets could prompt
CEO his mobile phone and told him to infrastructure faults, issuing notifications further improvements in infrastructure
write whatever he liked into it. What to maintenance teams that are able to visit performance. His new pet project is his
was written suddenly appeared on the the location and correct the issue at the most ambitious yet: the development of
display, leaving the CEO extremely next available opportunity. an open-source platform for asset
impressed. The technology succeeded in reducing information. He hopes that this can
He was subsequently approached by the number of incidents to almost zero, channel experience, especially from IT,
the CEO of EPE Rail Electr about joining Mehdi says. Further updates include the to have a tangible impact on railways in
the company as an IT assistant. He has addition of Lidar sensors to identify in North Africa and beyond.
since risen to become the firm’s chief 3D objects that are or could potentially His belief is that wider access to this
technology officer (CTO). interfere with catenary such as trees. information will prompt the development
EPE Rail Electr provides maintenance of small and medium-sized upgrade
services for railway electrification projects. He reports receiving an
equipment in Algeria. Much of Mehdi’s Contrasts encouraging response from railways in
work has focused on using IoT and other Mehdi says that EPE Rail Electr’s Morocco, Tunisia and Jordan to his
technologies to support SNTF with approach contrasts with traditional proposal. Yet there are challenges still to
maintenance of its ageing infrastructure. railway suppliers. He says that while overcome, namely accessing data held
Mehdi says that this has become especially major firms are keen to offer more by major private-sector players who he
pertinent as budgets for maintenance sophisticated technologies to SNTF to says are reluctant to share their
have been slashed and the railway has replace outdated equipment, including information. “Some private players in
had to use its resources more wisely. He signalling that relies on more than some countries do not share even the
has also helped develop software for 40-year-old relays, EPE Rail Electr is basic stuff,” he says.
stock management, and geolocation focusing on developing new maintenance Yet if there is one thing that his career
solutions for rolling stock. techniques using IoT to prolong asset life. has shown, this difficulty is only likely
A key recent project for SNTF is the Mehdi believes this is more suited to to spur Mehdi on. It is certainly an idea
development of preventative maintenance rail and the capabilities of SNTF, which and an initiative to keep an eye on.
techniques for pantographs. Mehdi says does not necessarily have the expertise “It’s a project that is eating me alive,”
around 40 pantographs were being in-house to adopt the latest technology. he says. “I really want to do this and
damaged each month on the Algiers RER “We can be competitive, especially in make something that is accessible to
due to maintenance issues. He our region,” he says. “We are developing more people so we can help solve these
subsequently developed an IoT-based the products, and we are using cheap problems in more places.”
J
AMIE Caldwell is described as a cooperation between commercial
current and future leader at business units, creates meaningful
Greenbrier and a “beloved and customer benefits, and increases cross-
highly-valued employee.” She works on functional capabilities.
Greenbrier’s management services team, The high regard in which Jamie is
leading the customer service and contract held is reflected in her selection to lead
administration group, and holding an a stretch assignment, directly sponsored
account representative position that sees by the CEO and management team. This
her work closely with many of the project includes managing, coordinating
company’s key customers. Her team and tracking a large, multi-business unit
oversees critical customer-facing project, which will lay the groundwork
communications and coordination to for how Greenbrier manages work for the
ensure effective management of wagon new programme in the future. Jamie was
fleets and that contracts are reviewed, chosen to head-up the project due to her
implemented and adhered to. ability to reach every business unit
A motivational leader, Jamie was a within the company and to make sure
significant contributor to creating and that smooth and efficient processes are
managing Greenbrier’s current customer in place at the programme’s inception.
service approach. She did this by initiating Her nominator writes that Jamie
a scalable process that includes cross- overcomes challenges through self-
functional questions, issue tracking, and awareness, empathy and a willingness
best practice knowledge transfer. Her to drive the team towards excellence.
nominator credits Jamie’s diligence and Her managers also describe her as a
attention to detail for improving the passionate and dedicated worker who
customer experience team’s internal and doesn’t back down from a challenge.
Jamie Caldwell external communications, which is
providing better support for customers
“She enjoys solving problems and is
dedicated to continuous improvement
Senior Manager, Customer and their individual requirements. She by holding her team to high standards
Experience, The Greenbrier has also twice been the recipient of while ensuring that she remains
Greenbrier’s Integrated Business Model accountable,” they say. “We look
Companies, United States Recognition Award, which recognises a forward to seeing Jamie’s continued
Age: 38. Years in the industry: 9 team member that exemplifies growth and leadership at Greenbrier.”
N
offers potential business of up to $US 1.2bn. city such as Austin, Texas, or Boise, Idaho.
ICK Langel credits the darkest “The account we were bidding for was He also wants to establish UP as a leader
moments of his life - the tragic too large for one person to target alone, in the Omaha philanthropic community.
murder of his mother-in-law by so I strategically formulated a team to “I have been deliberate about pushing
his father-in-law and the later breakdown proactively court the customer,” he says. my fellow co-workers to get involved
of his family around eight years ago - “I leveraged the skills of the individuals and make an impact in our community,”
for spurring him on to become the that I pulled into the team, so that we he says. “I hope that when I’m in an
successful person he is today. had the most well-rounded package. I executive role someday, that I can create
“Instead of internalising the issue and had functional owners give presentations, even more change and positive impact
going down a similar dark path, I overviews, and tours of UP processes on UP’s stake in the communities we
channelled that energy and poured it and facilities to ensure the customer had serve.”
out positively by starting to get involved full comfort and trust in our company.
in the community,” Nick says. “I began After we won the business, I hosted
volunteering on a small basis, taking my weekly onboarding calls and brought in
son with me, while meeting new people. every group from UP to ensure a
I eventually started taking on more smooth transition for the customer. In
responsibility, was accepted onto the end, we had 103 people that were
multiple boards in the Omaha non-profit able to make a positive impact on the
community, and also started to thrive in team and help negotiate and onboard
my career at Union Pacific (UP).” the customer.”
Among his achievements at UP are Among his philanthropic work is
the establishment of the first on-dock leading the community investment
intermodal service in Portland, Oregon, review team for the United Way of the
convincing traditional ocean shippers Midlands, and serves as a board
ONE and SM Line to also use rail, and member for the Christ Child Society of
facilitating the purchase of 980 refrigerated Omaha. He has also led various charity
wagons for UP. He also led an initiative fundraising efforts in the local community.
Y
preparing for it.
ANNIK Thomas is responsible Yannik possesses particular expertise
for managing a network of 85 in engineering and improving processes.
terminals and ramps across the This helped him to successfully lead a
eastern United States to offer a high- cross-functional team in NS to establish
quality customer experience. He is also a high-frequency corridor between
responsible for developing design Chicago, Harrisburg, Pennsylvania, and
engineering solutions for what are Croxton, New Jersey, in the second half
described by his nominator as the of 2022, a project that has proven a
“most complex challenges to achieving major success for NS.
Norfolk Southern’s goals for safety, The challenge was to redesign an
service and productivity” in its inefficient operating plan to increase In addition, the rate at which NS moves
intermodal and automotive businesses. both service quality and capacity. The containers and road trailers has improved
Yannik’s leadership philosophy is based result was a complete recast of the dramatically, resulting in more capacity
on judging when it is best to listen and operating and terminal plans for all and better asset utilisation for customers
when to direct. He approaches trains to and from northeastern states to on these key routes.
challenges armed with data to identify originate and terminate at the 47th The success of this project is testament
the best path forward for his team. He is Street intermodal facility in Chicago, to Yannik’s passion for contributing to
also a believer in getting buy-in from as the busiest on the NS network. This the growth of the North American rail
many stakeholders as possible. new high-frequency plan has since freight sector. Indeed, he has set himself
However, he is also willing to drive the improved service performance by over a target of doubling NS intermodal
team to “disagree and commit” if there 30%, achieving over 90% reliability. shipments by 2030.
A
has a global reach, connecting more than
MONG the highlights of Florina 40 experts in her field. Florina’s leadership
Hoza’s varied career at Systra is helped to double the budget for the
her work to effectively lead and initiative this year, doubling the number
coordinate a team of senior engineers to of projects delivered by the network.
interface with the client and deliver major She also recently led a webinar on “all
metro depot projects in Santiago, you want to know about maintenance,”
Jakarta, Buenos Aires and Bogotá. She sharing her passion for the topic with
has been helped by her ability to speak colleagues working throughout Systra,
four languages, while her expertise and explaining complex concepts in a
contributed to the efficiency, safety, and clear and comprehensible manner.
cost-effectiveness of these major depot In the future Florina wants to develop
projects. the next generation of engineering
She is also playing a key role in the experts by taking on a leadership role Her willingness to push the
Grand Paris Express project. Here where she can influence the growth of boundaries of her work and skills is
Florina is supporting work on four Systra’s maintenance teams. Florina is a reflected in Florina’s desire to always
depots that will provide maintenance passionate advocate for advancing look for further ways to improve. She
services for three automated metro lines opportunities for young people and recently started studying psychology to
totalling 230km, which will be served by women into the industry. She is a native better understand human behaviour,
more than 100 trains. of Romania, and after moving to France motivation and communications, so that
As an interface manager, Florina to study she became president of a she might provide more effective
managed to solve an issue that was youth association that led intercultural leadership and improve her problem-
holding up the project, avoiding six humanitarian and educational projects. solving skills.
months of potential delay and enabling She is also a member of an association that “Florina likes to go above and
the testing schedule to begin on time. works in senior schools to encourage beyond, even when activities are not
On another occasion she stepped in after young women to pursue careers in part of her job description,” her
realising that work was not progressing science. Florina often talks about her nominator writes. “She is passionate
as planned due to a major dispute passion for her career in rail engineering, about creating a space where knowledge
between two stakeholders. Florina took encouraging other young women to is shared and her motto is Team:
it upon herself to solve the conflict by follow a similar path. together each achieves more.” IRJ
IRJ XXXXX
December 2023 31
2016 31
South America | Salvador
T
HE metro in Salvador has been a After opening just in time for the Fifa When installing the telecommunications
long time coming. More than a World Cup, the metro is continuing to system, Siemens integrated data
decade after construction began serve football fans, with Campo da transmission, fixed communications,
in 2000, limited public services began Pólvora station located near the Fonte multimedia, message panel and timing,
on the first phase of the network on Nova arena in Itaipava. The station as well as the electrical monitoring and
June 11 2014, just two days before the plays an important role in ensuring radio subsystems. Siemens was also
city hosted its first fixture in the 2014 people arrive and leave the game safely responsible for the installation of the
Fifa football World Cup. with tens of thousands of fans passing 3kV dc catenary.
The project suffered repeated delays through the system on a match day. Bahia Metro has also put its own
to its original schedule to open in 2003 “Normally when we have a soccer stamp on Siemens’ CBTC system. With
as a result of contractual disputes and game, this is very crowded,” says Metrô standard CBTC systems, the signal
political wrangling, which ultimately Bahia customer service executive aspects would usually show green or
resulted in the Bahia state government manager, Mr Leonardo Balbino, red when operating in manual mode, or
taking over responsibility for pointing to a CCTV image of the station switch off when a train is operating in
completing the line in 2013. When within the Operations Control Centre CBTC mode. However, Balbino says
services finally began, they initially (OCC) showing the station platform.
operated on the 7.6km five-station Lapa However, Campo da Pólvora station is
- Retiro section of Line 1 between 12.00 still not as busy as Lapa station, which
and 16.00 with trains running at is located next to Campo da Pólvora
10-minute intervals with free travel for and previously coped with 50,000
passengers. However, on match days, passengers in a day. “The station was
access was limited to football fans with very crowded, it was very interesting,”
tickets for the game. Balbino says.
Fast forward nearly a decade from In May 2021, Siemens was awarded a
that first opening, and it’s a very contract by Bahia State Transport
different story in the capital city of the Company to install CBTC on the Pirajá -
state of Bahia in Brazil. Águas Claras section, to match the
The opening of the 1.5km Pirajá - system installed across the rest of the
Campinas section of Line 1 on June 14 network. Siemens also provided a
of this year took the total length of the software update for all onboard units
line to 13.4km, including 1.4km in on the existing fleet of 40 trains and for
tunnel and 5.8km elevated, with nine both the main and back-up OCCs. The
stations. contract included the installation,
Construction on Line 2 began in testing and commissioning of a radio
February 2015, and the first 2.3km system, electronic interlockings, and
Acesso Norte - Rodoviária section wayside equipment.
opened on December 5 2016. Following Siemens’ Trainguard MT radio-based
the opening of the 3.5km Mussurunga - CBTC, implemented between March
Airport section on April 26 2018, Line 2 2015 and July 2018, allows for automatic
is now 19.6km long with 12 stations. operation at Grade of Automation 2
Services on both lines operate from (GoA2). Even though the driver starts
05.00 until 00.00, with the service the train manually, the system
frequency adapted to meet demand. automatically takes over acceleration,
Work is also continuing to further braking and speed control between
expand the network. stations, and controls the opening and
In May 2019, a consortium led by closing of the doors at stations. The
Camargo Corrêa, Brazil, was awarded a system also allows for automatic
contract to construct the 4.7km driverless reversing in turnback sidings.
extension of Line 1 from Pirajá to Águas Line 4 in São Paulo, which is operated
Claras, including the now-open Pirajá - by Via Quatro, in which CCR has a 75%
Campinas section. The consortium stake, is similarly equipped with CBTC
submitted a bid of Reais 424.7m ($US with full driverless operation. However,
105.4m) for the two-station extension, Balbino says this is not possible on the
the lowest offer in the tender. Salvador Metro, as unlike Line 4 in São
The network is operated by CCR Paulo, which is fully segregated with
Metrô Bahia under a 30-year Public- platform screen doors, some of the
Hyundai Rotem supplied 40 four-car trains for
Private Partnership (PPP) contract Metrô Bahia network is at grade, with
use on the Salvador metro. Photo: Metrô Bahia
awarded in February 2014. no platform screen doors at stations.
32 IRJ December 2023
Metrô Bahia was worried that this would trends monitored over the preceding Traction current is provided by three
make it more difficult to detect signal weeks. That particular week, Monday substations, which receive 69kV from
faults, and instead asked for the signal and Friday are operating to a different the grid and supply the 3kV dc required
to show both green and red aspects at timetable to Tuesday, Wednesday and for the overhead catenary. Each
the same time when the train is Thursday, with 10 trains in service on substation normally feeds a particular
operating in CBTC mode. Line 1 and 17 trains on Line 2. section of the network, but there is a
“For safety, we have a driver on all of “Every week, we look at the demand redundancy whereby they can provide
the trains,” Balbino says. When the train of the week before and try and predict the energy to other sections of the network
is operating in CBTC mode, the driver coming week,” Balbino says. “Analysing if needed.
must still press a button when boarding last week, we saw that Mondays and However, the system has occasionally
is complete to acknowledge that they Fridays had one type of demand and the been forced to deal with bigger
are still alert, and that it is safe to other days had another type, so we have electrical problems, suffering a full
proceed to the next station. The driver two timetables. Normally we have more blackout in August for the first time in
is also responsible for activating the trains operating on Line 1 than Line 2.” three or four years.
emergency brake if there is a person or Services are usually quite reliable, This caused all trains to stop, and
other obstruction on the line. Balbino says, but issues can be caused resulted in passengers having to
by the theft of lineside cabling, which in disembark and walk along the track to
turn causes communication problems the nearest station, escorted by Metrô
Peak timetable between the OCC and the trains. When Bahia staff. To provide a back-up in
During a visit to the main OCC on a this happens, drivers switch to case of future power failures, Metrô
Monday morning in September, Balbino operating in manual mode, but are then Bahia is installing large generators that
explains that services are operating to a limited to 30km/h instead of the normal would provide enough energy to move
peak timetable based on ridership 80km/h, impacting network capacity. trains to the nearest station.
A
number of other transport projects have been proposed across Salvador to A server for the radio system, for
integrate with and complement the metro network. example, shut down within 10 seconds
In August 2022, CCR Metrô Bahia presented the state government of of the power being cut, and had to be
Bahia with a study that proposed the construction of a light rail line from the Piatã manually reset.
district of Salvador to São Luiz in the municipality of Simões Filho. The new route
would be 20.4km long, running along the BA-528 road, the Avenida Orlando
Gomes and the Avenida 29 de Março, and would provide interchange with the Depot
Salvador metro network. There would be a total of 20 stops serving a local As well as the state-of-the-art control
population of 530,000 residents. The new route would be operated with a fleet of centre, Metrô Bahia has also developed
27 LRVs, each able to accommodate 400 passengers. a modern maintenance depot to ensure
Construction would be undertaken in two stages, with the first stage running trains operate smoothly.
from the proposed bus station in Águas Claras to Praia de Piatã. The second stage Services on the network are provided
is dependent on the widening of the BA-528 road and would run from Águas with 34 Bravo trains and six older
Claras to São Luiz. Alpha trains, both supplied by Hyundai
The light rail line would serve the same area as a proposed Bus Rapid Transit Rotem.
(BRT) route, which is included in the public transport development plan for The depot is equipped with gantries
Salvador but has been the subject of disagreement between the city of Salvador to allow maintenance to be performed
and the state of Bahia. on equipment mounted on the roof of
A monorail has also been proposed to replace the suburban rail line from the trains, such as the air-conditioning
Calçada to Paripe. The previous governor of Bahia, Mr Rui Costa, signed a contract system. It is also equipped with a lift to
in 2019 to launch an elevated monorail project that will link the commercial district allow the bogies to be removed, and
of Salvador with Ilha de São João in Simões Filho. two wheel lathes including one which
Skyrail Bahia, a consortium of Build Your Dreams and Metrorail, was selected to can machine the wheels while still
construct and operate the line in 2019 under a Reais 1.53bn public-private under the train. The wheels are
partnership (PPP). The 19.2km, 21-station line was to have capacity for 150,000 reprofiled every six months on average,
passengers a day. explains Bahia Metro maintenance
Originally planned as a light rail project, the line will use part of the alignment manager, Mr Caio Cardoso.
of the 13.6km suburban line from Calçada to Paripe. Buildings at the line’s 10 The depot also features a laboratory
stations will be retained and converted for other purposes. which, among other tools, is equipped
with two 3D printers. They have been
Ilha de São João Metro open used to manufacture everything from a
Metro under construction
Monorail Phase 1
box made of biodegradable material to
Paripe N Monorail Phase 2 store and transport radios or a fire
detector nozzle made with flame-resistant
0 km 3 material, through to a microphone holder,
seat lever handle, substation circuit-
Periperi breaker support, and a central pivot
calibrator for adjusting the height of the
nylon guides for the train doors.
Lauro de Freitas Cardoso explains that being able to
Águas Claras manufacture the parts on-site is a major
São João Airport time and cost saver.
“It’s very important economically to
manufacture the spare parts, and it has
f!2
Campinas
Mjo
O
RGINALLY due to start on as possible. As De León explains, this the wider range of goods available in
January 20, work to revive has seen Remed acquire an adjacent site Mexico. “A passenger service would
Guatemala’s currently disused from fertiliser company Duwest. Combined make a lot of sense for tourism,” he says.
914mm-gauge network as a modern with dedicated customs facilities at Although the focus of Remed’s project
1435mm-gauge freight railway and Tecún Umán and electronic document is very much on freight, development
build new cross-border links to El transfer, Remed believes that these new work has included examining the potential
Salvador and Honduras (IRJ December rail-connected facilities have the for operating passenger services to serve
2022, p28) has been set back by political potential to substantially reduce the the 3.1 million inhabitants of Guatemala
circumstances and related administrative time it takes for freight to cross the City using battery-powered rolling stock
delays, according to Remed Mexico border from Guatemala into Mexico. developed by British rolling stock
operating manager, Mr Mauricio De León. With the current road crossing congested supplier Vivarail, which entered
Following the election of Mr Bernardo with large numbers of small lorries, De administration in December 2022.
Arévalo as Guatemala’s next president León says that it can take “hours and Deploying Vivarail’s quick-charging
in August, the handover of power and hours” to complete border formalities, technology would have offered the
the transition to a new government has which include the requirement for road potential to decarbonise local transport
proved to be a lengthy and at times vehicles to change number plates from in Guatemala, taking advantage of
controversial process. Arévalo is now one country to another. Combined with comparatively cheap hydro-electric
expected to take up office next month, the poor state of the road network, this power and avoiding the need to install
and De León hopes that work can begin means that freight moving by lorry overhead electrification equipment
in earnest later in 2024 once the new from Guatemala to Mexico and the US where clearances might be limited.
administration has finished “dotting the can take between seven and 14 days to Remed is still working to determine
Is and crossing the Ts” of the remaining reach its destination. which of the 200 stations on the national
paperwork and complete the other tasks The value of Guatemala’s exports was network it will require, and De León
that it is responsible for, such as clearing an estimated $US 15.3bn in 2021, of which reports that discussions are also
illegal construction that has encroached 32% went to the United States, 12% to continuing with potential passenger
on the right of way since the last trains El Salvador, 10% to Honduras and 4% operators. No final decisions have yet
ran in September 2007. to Mexico. Faster rail service would been made on what contractual shape
Comprising 800km of new or upgraded therefore have significant benefits for this would take, however. “We are open
railway and expected to take two years Guatemalan companies exporting to any possibility,” he says.
to complete at a total cost of $US 1.76bn, agricultural products such as bananas, Similarly, for the core freight operations
the Remed project has been divided raw sugar and palm oil, of which a great on Guatemala’s revived national network
into three stages. deal is destined for the US, according to this issue is “not settled yet”, but as De
Stage 1 mainly comprises an upgrade De León. “A massive amount rots in transit,” León points out “Remed has no operating
of the 235km running from Tecún Umán he says. “The freight infrastructure isn’t experience” and will probably require a
on the Mexican border via Río Bravo and there and their output is constrained by suitably qualified partner. Discussions
Santa María (north of Obrero) to Puerto their ability to move it.” have been held with a number of
Quetzal, Guatemala’s largest port on the Cross-border shopping trips are potential operators, but “we don’t need
Pacific coast. The focus of Stage 2 is to popular in Guatemala, De León notes, an operator for a while,” he says.
revive rail links to Caribbean ports, due to both the relative strength of the “When we start building, I think we’ll
involving the upgrade of 317km running quetzal against the Mexican peso and have a queue for that.” IRJ
inland from Puerto Barrios and Santo
Tomás de Castilla, just south of Puerto Central America
Barrios, to Zacapa and Guatemala City.
Stage 2 includes upgrading the 89km MEXICO
Dbsjccfbo!Tfb
Puerto Barrios Puerto Cortes
route from Guatemala City to Santa
Entre Rios
María, connecting stages 1 and 2. Under GUATEMALA
Stage 3, a 91km line will be built to the Ciudad Hidalgo HONDURAS
border with El Salvador from Obrero, Tecún Umán Zacapa
on Stage 1. The new 19km line to the Puerto Retalhuleu Guatemala City
Honduras border runs from Entre Ríos Chiapas Obrero N
Tegucigalpo
near Santo Tomás on Stage 2.
Pending the start of this major Puerto San Salvador
Champerico Puerto
construction programme, work is now Quetzal
Arajutia NICARAGUA
underway in Guatemala to lay track at La Union
the freight terminal, free port and EL SALVADOR
industrial park that Remed is Puerto Corinto
Existing lines
developing in Tecún Umán with a view Managua
Disused lines to be reopened
to start moving freight by rail to Mexico, New lines Qbdjgjd!!Pdfbo IRJ
the United States and Canada as soon
IRJ December 2023 35
Stations | design
I
N May this year the International services and stations that they use. groups of passengers, and explore how
Association of Public Transport “This handbook is about how to design stations can be made more welcoming
(UITP) published its report How to stations,” said Mr David Vitezy, CEO and and inclusive for all. The report notes,
Make Stations Lively Hubs for Both senior public transport expert at Hungarian however, that the limitations of the study
Citizens and Public Transport Users: consultancy Transport Research Budapest, include the lack of direct involvement of
Solutions. The report has been produced and a former CEO of Budapest public passengers or station users.
within the framework of the Stations of transport authority BKK. Chairing a To determine user requirements, two
the Future project, led by UITP in session on Stations of the Future at the contrasting demographic groups were
partnership with lift and escalator UITP Global Public Transport Summit chosen, Generation Z, or those born
manufacturer Kone. in Barcelona on June 6, Vitezy stressed between 1997 and 2012, and “representatives
Compilation involved collecting the need to place the passenger at the of the Silver Economy.” They were selected
examples of best practice from around heart of the design process. in recognition of the fact that user
the world, gathered online and at “Our whole journey experience in expectations change with age and to
workshops and “brainstorming sessions” public transport is defined by the highlight the importance of catering to
held at locations including Singapore, experience we have at stations, how different, yet significant, segments of the
Jacksonville and Delhi. Pointing to best they are designed, how clearly we find customer base.
practice along the way, the report takes our way, what the quality of the Key challenges identified during the
a step-by-step journey through the station architecture is,” Vitezy said. analysis of user needs included
to highlight areas in each phase of the “The station is the face of our public differences in speed of movement
process where improvements can be made, transport systems, both rail and metros, through the station as well as digital
both in new-build projects and at existing and I think putting the attention needed proficiency and autonomy. The report
stations, to meet changing passenger in designing and managing them is really says that while some passengers feel
needs. These solutions fall into the very important to attract more customers comfortable using their mobile phones
categories of technology, infrastructure to our systems to fully recover after the to plan their journeys and find their way
and management, and are considered pandemic.” around, and also prefer self-service
from the perspective of public transport The study has aimed to identify the solutions, others prefer human contact
users as well as the operators of the needs and expectations of different when seeking information and assistance.
The way in
both RATP in Paris and WMATA in need to be displayed in the same way
Washington DC now providing across the entire station, as at some
information on the availability of lifts locations it may be appropriate to not
The report’s journey through the station and escalators. As Mr Cãlin Hera, display information about departures
starts with Entrance, considering how Kone’s business development manager when it is no longer possible to reach
to make it easier for passengers to find for the public transport sector, pointed the platform without rushing.
their way when arriving at the gateway out in Barcelona, “nowadays, equipment
to a public transport network. like lifts and escalators can be
To better manage and segregate connected to the internet. Therefore
people flows, recommendations here this information is available in real
include dedicated entrances and exits, time for the system operator to
as well as dedicated entrances from provide it to the people who need it.”
bicycle parking areas. The report says The threshold crossed, the report
that at least one entrance - and goes on to consider the Concourse/
preferably all gateways to the station - Ticket Hall in its next section. To
should be fully accessible to passengers help passengers find their way
with reduced mobility (PRM), citing around, one recommendation is to
here as best practice Madrid Metro’s install projectors to display
Accessibility and Inclusion Plan that information in either a static or
has seen lifts and other complementary animated way, which is more
measures installed at stations. attention-grabbing than
Alongside such infrastructure conventional floor markings and
improvements, one management has the advantage of not causing
solution recommended here is to alert any physical obstruction to
passengers in advance if station passenger flows. Another
equipment such as lifts and escalators, management change is to provide
or passenger facilities such as toilets, are an indication of the walking time
out of service. This could be provided and distance to the platform.
via mobile phone apps or other online Here, the report also notes that
journey planners, with the websites of train departure times do not
36
mobile phones at MTR of Hong Kong, provide support for those needing more
and the first deployment of contactless help, and the report also recommends
payment on a metro system in Brazil by making trained instructors available to
MetrôRio of Rio de Janeiro. Considering help passengers understand how to use
the TVMs themselves, the report says that journey planners, ticketing apps and
they should be intuitive for passengers other digital tools.
to use, with readable displays and Turning to waiting areas, passenger
clear and concise instructions in a wellbeing here could be improved by the
selection of languages. This would creation of silent zones, and the provision
reduce frustration, shorten queues of drinking water or entertainment such
and make reliance on support staff as TV or reading matter.
unnecessary. If no staff are present, Recommended infrastructure design
the TVM should be equipped to enhancements for the Concourse/Ticket
enable the user to seek remote Hall area include clear lines of sight
assistance. enabling passengers to see exactly where
While some passengers are happy they need to go, and providing more
to use digital tools, others need or natural light and green space to create a
prefer more personalised assistance more calming and inviting atmosphere.
involving human interaction. The Charging points for mobile phones and
report therefore recommends that other devices should be provided in the
Ticketing and customer service centres should station, and a strong mobile phone signal
be accessible to the maximum should be available to enable passengers
customer assistance number of users at major hubs. to work and access digital travel tools.
As best practice, UITP cites the use of Third-party services that could be
To avoid queues at ticket offices or stations on the SMRT network in provided include co-working areas and
ticket vending machines (TVMs), UITP Singapore as “Go To Points” for people parcel collection points, as well as retail
recommends that operators provide with dementia, providing assistance to outlets, which will enable operators to
multiple payment options, citing as best enable them to return home safely. take advantage of their city centre
practice payment using QR codes on Volunteers or staff ambassadors could location and generate extra revenue.
On the platform
making station ventilation and air-
conditioning easier to control. Sensors
or CCTV cameras to detect passengers
The Platform section of the report considers falling onto the track are also suggested,
the interface between the station and the as part of systems that would
train, and says that this should be as automatically generate an alarm, bring
safe and smooth to negotiate as possible. trains to stand and stop any other
To ensure even distribution of passengers, appropriate equipment. Help points
floor markings should be used to direct should be installed to enable passengers
users away from the entrance to the to contact staff in the event of an
platform, which might also be achieved emergency or for other assistance, and
with the “nudge” of placing services or the report says that holograms and
retail facilities further away from the robots could provide a more interactive
entrance. Passengers can be directed to or intuitive alternative to fixed help points.
less busy sections of the train by The use of robots to provide passenger
harnessing onboard load monitoring or assistance and undertake other tasks as
passenger-counting data to provide real- part of a wider digital transformation
time information on train occupancy. programme is now being tested by East
UITP’s example of best practice here Japan Railway (JR East) under its own
is the Hector system developed by Station of the Future project, as Mr Ippei
French National Railways (SNCF), Nemoto, a researcher at JR East’s Frontier
which is now being rolled out across the Service Development Lab told the UITP
Paris suburban network after a successful summit in Barcelona. “The concept of
trial on Line H. This uses data gathered the Station of the Future is to transform
by infrared passenger-counting sensors the role of stations from a hub for transport robot stands still and performs what
located above the doors to display train to a hub for daily life,” he said. “By Nemoto described as “sentry duty.”
occupancy in real time at stations. At providing enhanced guidance, we can JR East is also testing AI communications
quieter times, it can help passengers to provide peace of mind to our customers.” robots to provide passengers with
be closer to one another if they have A prototype autonomous robot has assistance and advice on journey
personal safety concerns about travelling been deployed at Takanawa Gateway planning via station information points
alone. Station displays and timetables station, whose movements and functions and mobile apps. One problem here is
should also indicate train composition are guided by passenger congestion that the current systems are not linked
and the location of onboard facilities, data gathered using webcams and 70 in order to provide a common set of
the report says, with platforms marked laser sensors, Nemoto explained. When responses to the questions most
to indicate the position of specific cars the level of congestion is low, the robot frequently asked by passengers, and
within the train. moves freely around the concourse at Nemoto said that JR East’s goal was to
To improve safety at the interface speeds of up to 3km/h, undertaking bring the data together in order to
between the station and the train, the duties such as cleaning the floor or automate the process. A communications
report recommends the installation of inspecting it for defects that could cause robot would be able to contact a
platform screen doors, which offer the passengers to trip and fall. A medium physical member of staff if it could not
additional benefits of reducing train level of congestion sees the provide the necessary information, and
noise and robot operate in stop/go mode, the response used to modify the
patrolling and providing information supplied in future. Analysis
guidance at up to 2km/h. At of the questions asked by customers
times of high congestion when would also enable JR East to better
it would be hard to move, the understand their needs.
“
“Meld Studios partners with organisations to solve
complex problems using a human-centred design approach
which, simply put, is putting those who are involved in When we are experts in a field, it is
the change at the centre of the change,” she explained.
The company’s preferred solution to achieving a user-
really easy to forget that we don’t know
friendly design for anything from a push button to a new what we don’t know. Zoe Green
train or even a major transport interchange is prototyping,
presenting future users with a design concept and asking
them for feedback based on their own personal experience.
“We let them tell us the truth,” Green said. “The more “There’s a temptation to spend more, to start with a higher-
you can test with customers, the more data you can fidelity near-perfect model of what we think needs to be true,
gather, developing more confidence in the thing that with the assumption that that’s the only way to gather
you’re putting out into the world, ensuring that it’s not valuable insights,” Green pointed out. “But what I’d argue and
just an assumed need, it’s an actual need.” actually recommend is starting quite the opposite way with a
Prototyping can be done “at any scale, at any fidelity, low-fidelity model. And using raw customer insight to
and at any budget,” according to Green. She defined continuously iterate feedback into the design. We can then test
fidelity as “the exactness of a thing,” and low-fidelity it again and again, building up to these high-fidelity models.”
prototyping could involve presenting the future user with “When we are experts in a field, it is really easy to forget
printed 2D renderings that are then discussed, annotated and that we don’t know what we don’t know,” Green said. “And
drawn on. A slightly higher degree might involve roleplay, we are not the typical transport user which we are designing
which has seen future passengers walking around mock-ups for. There’s always something new to learn, especially from
of future interchanges. “They were able to reflect in real time, human experiences that are very different from your own.”
telling us what they needed in those situations,” Green said. To ensure that a wide range of passenger experience informs
The next step up is to use virtual reality (VR), which offers its prototyping work, Meld Studios takes a different approach.
exciting possibilities and is “very sexy at the moment,” Green “We flip the typical recruitment models to make sure that we’re
says. asking a really diverse and inclusive group of people so that
“It’s about translating these CAD models into VR reality we’re not just getting the same nine to five commuters that
models where customers can put the headset on and generally find commuting reasonably straightforward,” she says.
physically almost walk through these stations. We attempted In conclusion, Green quoted the great American architect
this with five stations and over 300 customers, and they were and designer Frank Lloyd Wright who said “you can use an
able to interact with the station, the precinct and the interchange eraser on the drafting table or a sledge hammer on the
step by step. The great thing about VR is it helps to give that construction site.” Green’s own advice was “test early and
sense of scale that a 2D piece of paper can’t really provide.” test often. It removes risk for projects before it is too late.” IRJ
R
AIL transport relies heavily on sophisticated imaging technologies and as the inspection vehicle moves along
the integrity of its infrastructure. data analysis algorithms to detect and the track. They capture images with a
The Rail Surface Inspection System quantify rail surface defects with a level minimum resolution of 0.4mm at
(RSIS) is designed to offer a methodical of precision that human inspectors speeds up to 105km/h, ensuring that
approach to improve how rail surfaces cannot achieve. even at high speeds, the system does
are assessed and maintained. By These systems use high-resolution not compromise on the level of detail
incorporating machine vision technology, cameras to capture detailed images of captured. This high-resolution imaging
RSIS provides a more measured and the rail surface as inspection vehicles is crucial for detecting the early stages
data-driven process for identifying rail travel along the track. The images are then of rail surface defects, which can escalate
surface damage, moving away from the analysed using specialised software that into more significant issues if not
more traditional, manual inspection can detect a wide range of surface anomalies, addressed promptly.
methods. from the smallest cracks to the early signs Once the continuous rail surface image
Historically, rail surface assessment of spalling and corrugation. This level of is captured, it is segmented into five
has relied heavily on visual inspection detail enables maintenance teams to longitudinal bands. This segmentation
and manual measurement. While these identify potential issues long before is not arbitrary; it reflects the areas of
methods have served the industry for they become visible to the naked eye. the rail that are most susceptible to
decades, they come with significant Data plays a central role in advanced different types of wear and damage and
limitations. Human inspectors can miss rail surface assessment. RSIS, for comprise:
small cracks or imperfections, especially example, generates a wealth of data on = gauge corner: the part of the rail that
when they are new or hidden beneath rail surface conditions, including comes into contact with the wheel flange
dirt and rust. Moreover, the subjective measurements of crack density, depth, - damage here can lead to derailments if
nature of visual inspection can lead to and orientation. This data can be not managed
inconsistent assessments, making it integrated with information on rail = mid-gauge: this area is prone to
difficult to track the progression of wear geometry, wear patterns, and traffic rolling contact fatigue (RCF) due to the
or damage over time. loads to create a comprehensive picture high stresses it experiences
The consequences of undetected or of rail health. = top of rail: the uppermost surface where
misjudged rail surface defects can be The ability to track changes in rail the wheel sits, which can be affected by
dire. Cracks can propagate under the surface conditions over time is another slip-stick action and can develop
stress of passing trains, leading to rail advantage of advanced assessment corrugations or other wear patterns
breaks that may result in derailments. systems. By comparing data from = field side: the side opposite the gauge
Similarly, undetected wear can lead to successive inspections, maintenance face, which can show damage due to
rail head defects, compromising the teams can identify trends and predict wheel-rail interaction dynamics,
wheel-rail interface and potentially when and where defects are likely to especially on curves, and
causing accidents. Thus, the need for a worsen. This predictive capability is = full rail width: a comprehensive view
more precise, objective, and consistent essential for planning maintenance that helps in assessing the overall
method of rail surface assessment is not activities, allowing railways to address condition of the rail head.
just a matter of improving maintenance issues proactively rather than reactively. With the latter, each band is further
routines; it is a critical safety concern. At its core, RSIS is about precision and divided into 300mm segments, which is
The shift towards advanced rail surface prevention, using high-resolution linescan a strategic choice. This size corresponds
assessment methodologies is driven by cameras to capture the minutiae of rail to the data intervals of track geometry
the need to overcome the limitations of surface conditions that are invisible to and rail wear data, allowing for a direct
traditional inspection methods. the naked eye. comparison and integration with
Advanced systems like RSIS employ Linescan cameras scan the rail surface existing maintenance data sets.
Figure 1: RSIS sub-bands, allowing for Figure 2: Preventive RCF detection on a sub-band level, aiding the detection of specific
targeted analysis of specific areas of the rail. areas of the rail that require immediate action.
40 IRJ December 2023
The segmentation into bands allows sections near spirals can inform track and aids in pinpointing areas that
for targeted analysis of specific areas of engineers about the dynamic behaviour require immediate attention.
the rail, crucial for identifying localised of trains exiting curves, which can lead Field data collected using RSIS has
issues such as RCF and other forms of to targeted adjustments in track led to several unique findings.
surface damage. geometry or rail profiles to mitigate Preliminary evaluations have identified
For each 300mm segment, RSIS these forces. areas of RCF and rail surface spalling
calculates several critical parameters: The RSIS data integrates seamlessly associated with track geometry
= RCF crack density: this measures the with existing rail maintenance protocols. conditions. Moreover, RSIS has revealed
total area of RCF cracks within a The strip charts generated by RSIS can interesting rail surface conditions not
segment, providing a density figure that be used alongside traditional track only within curves and spiral locations
helps in assessing the severity of the geometry and rail wear data, providing but also in tangent sections near spirals.
condition a more comprehensive understanding For example, RSIS has detected
= average crack width: by measuring of rail condition. This integration is unground sections within curves, such
the average width of RCF cracks, crucial for planning maintenance as at level crossings, where rail grinding
maintenance teams can determine the activities such as grinding, where RSIS equipment cannot operate. It has also
stage of the fatigue process data can help in identifying the exact identified significant RCF at tangent
= average crack angle: the angle of RCF location and extent of rail surface sections near spirals, suggesting that
cracks can indicate the type of stresses damage, ensuring that grinding rail vehicles do not reach a steady-state
the rail is subjected to, which is vital for operations are targeted and effective. position immediately after exiting a
determining the root causes of rail Two software tools - GeoEdit 8 and curve, leading to RCF damage due to
damage Virtual Track Walk - are key elements of oscillating wheel flanges.
= surface damage area: this ratio the RSIS. GeoEdit 8 is used to view strip Ultrasonic rail flaw testing is a critical
measures the area of surface damage chart data and rail profiles, while Virtual component of rail maintenance. RSIS
within a segment against the total area, Track Walk allows for visualisation of data can be used to plan for successful
giving a clear indication of the extent of the imagery. These tools are synchronised, ultrasonic tests by identifying sections
surface degradation, and enabling users to simultaneously view with surface conditions that may
= rail surface index: a composite index strip chart data and imagery at any interfere with testing, such as shelled,
that weighs the above parameters into a given location on the track. spalled, or corrugated (SSC) areas.
single value, providing a quick RSIS employs a two-step algorithmic The introduction of RSIS has the
reference to the overall condition of the process to quantify rail surface condition. ability to transform detailed visual data
rail segment. The first step involves detecting whether into practical analysis, aiding in the
the rail surface has been ground, meticulous planning of rail maintenance.
adjusting calculations accordingly to While RSIS enhances the precision of
Insights for maintenance avoid misinterpretation of grinding pre-grinding inspections and the
The RSIS methodology is not just marks as surface defects. The second identification of rail surface issues, its
about detecting and quantifying rail step involves the segmentation of the true value lies in its contribution to the
damage; it is about providing strategic rail surface into different bands and the systematic upkeep of rail infrastructure.
insights that can guide maintenance calculation of various condition values. This should not only prolong rail life
decisions. For example, the detection of This visual representation in the RSIS but also help to improve the safety and
RCF on the gauge face in tangent track data highlights the extent of damage efficiency of rail transport. IRJ
RAILMASTER
Linsinger´s latest development the
”RAILMASTER® ” is the perfect fusion of the
ZERO Emission
most advanced rail milling technology powered
by zero emission propulsion systems.
This is our contribution to a better future.
Track | fastenings
L
ATERAL stability and durability of This is why it is even more necessary profile, sleeper design, and sleeper type
continuously welded rails on to develop and use innovative technical as well as the torsional resistance of the
ballasted track are crucial for high solutions that can guarantee the safety rail fastening system.
speeds and loads. Maintaining track of the track even at high rail There are various ways to prevent
stability is therefore becoming temperatures. track buckling. However, the question
increasingly important as global Lateral track stability during rail is which solutions are technically
warming intensifies and the potential heating is treated with the energy method effective, economical, and as simple as
for track buckling during prolonged in the calculation procedure developed possible to apply. The quickest measure
high temperatures increases. by H Meier. The basic parameters of is to implement a temporary train speed
Track buckling is caused by the lateral track stability are defined as lateral restriction to minimise the dynamic
superposition of three adverse factors: sleeper resistance (LSR), rail profile, curve effects. However, this leads to delays,
high compressive forces in the rail, radius, lateral track misalignments operational disruption, high costs, and
weak points in the ballasted track, and resulting from the operational load, and ultimately to a loss of image for the
the dynamic effects of the train traffic, frame stiffness. The theoretical moment railway and is therefore not expedient.
which reduces the resistance of the of inertia ITH of the track grid The second possibility is to increase
superstructure due to the forces and represents the frame stiffness, which lateral sleeper resistance by using
vibrations introduced. can be determined experimentally in heavier concrete sleepers with profiled
Buckled track typically has large the laboratory and is used as a discrete sides such as scallops and sleeper pads
short-wave lateral misalignments that value in Meier’s formulae. or by using sleeper anchors. Other
lead to derailments when a train passes However, the theoretical moment of possible measures include reducing
over them. For example, an average of inertia alone cannot precisely reproduce sleeper spacing, using high-quality
38 train derailments per year were actual track force deformation ballast, ballast bonding, or widening the
recorded in the United States between relationships since the theoretical ballast shoulder. Such solutions are fine
1998 and 2002 because of track buckles. moment of inertia is not constant in on new lines or during track upgrading
The costs incurred during this period reality but depends on the lateral but are costly and take time to
amounted to $US 55m. In June 2016, a displacement (corresponding to the implement on existing lines.
freight train derailment also occurred in lateral track misalignment or deflection A third possibility is to increase track
Germany between Gaildorf West and in the test) of the track grid as well as stiffness by using fastenings with a high
Schwäbisch Hall-Hessental due to track on defect length. The theoretical inertia torsional resistance (HTR) or by laying
buckling, causing total damage of €1.74m. moment is mainly influenced by the rail a particular design of sleeper such as
Figure 2: Schematic and actual test setup for determining the theoretical moment of inertia of the track grid with nine sleepers.
sleepers have also been studied. In general, higher values of the conventional fastening system (Skl 14/
The following types of superstructure theoretical moment of track inertia Wfp 14). This results in higher resistance
with the W14 fastening system were occurred with the HTR angled guide against track buckling. With the installation
analysed, whereby every version was plate and the combination of HTR and of the novel components M7/HTR, it
examined with two distinct types of rail M7 tension clamp compared with the also could be possible to dispense with
clamps: common Skl 14 and innovative M7: standard angled guide plate and widening the ballast shoulder in certain
• Wfp 14 K with Zw 687a tension clamp. This applies to the test cases and the necessity to impose
• Wfp 700 HTR with Zw 687a results with hard pad Zw 687a and the temporary speed restrictions.
• Wfp 14 K 900 with Zw 900, and test results with elastic pad Zw 900.
• Wfp 900 HTR with Zw 900. Variations will be compared using
The determination of these measured values at a 10mm deflection, Advantage
characteristic values was obtained by because this deflection was measured The M7 and HTR have a clear economic
using a section of track with nine sleepers. for every system and resembles a value advantage compared with other measures
The track’s vertical bearing is as approximately in the middle of ITH. for improving lateral track stability,
frictionless as possible through a track In the case of the systems with hard such as sleeper or ballast replacement.
ball bearing on top of steel plates. With rail pad Zw 687a, the use of the M7 and The cost of replacing tension clamps
a sleeper spacing of 60cm, the spacing conventional guide plate shows an ITH and angled guide plates is many times
between the lateral bearing results in increase of 8.1%. Using the HTR with lower and the remaining, existing rail
4.8m (see Figure 2). For a lateral conventional tension clamp leads to an fastening components such as rail pads
bearing, the end faces of the sleepers at ITH increase of 39.8%. Combining the and screws can continue to be used.
the end of the track section were used. novel HTR with M7 results in a 50.2% Even under the imminent danger of track
The rail fastening was uniformly increase in ITH (Table 1). buckling, when quick action is required,
tensioned to 250Nm. Similar behaviour appears for systems the newly developed rail fastening
A centrally arranged force application with the Zw 900 elastic rail pad. The use components can be installed in the track
was applied to the end face of the centre of M7 with conventional angled guide with relatively little effort during night-
sleeper on the support-free side of the plates results in a 27.2% increase in ITH. time possessions when the rails are
track. During the tests, the track The use of the Skl 14 tension clamp cooling down. And finally, compared
deflection was continuously increased together with the HTR results in a with other temporary measures to prevent
in steps up to 25mm. In each case, 51.7% increase in ITH. The combination track buckling such as speed restrictions,
increments of 5mm were generated of M7 with HTR shows a 58.5% increase line closures, and “white” rails, the M7
three times before continuing with the (Table 2). With these values, the critical and HTR can provide a permanent and
subsequent larger deflection. The tests temperature increase of the rails until sustainable solution. IRJ
were evaluated using an average of track buckling could be determined
three loads with the same deflection. with Meier’s Theory. *This article was written by Timo Wastlhuber
In both cases (with hard rail pad Zw In summary, the rail fastening system and Prof Dr-Ing Stephan Freudenstein with the
687a and elastic rail pad Zw 900) the with higher torsional resistance (M7/ Institute of Road, Railway and Airfield
rail fastening with a W14 angled guide HTR) leads to an increase in the Construction at the Technical University of
plate and a Skl 14 tension clamp was theoretical moment of inertia ITH of a Munich, and Dr-Ing Dimitre Iliev and Winfried
Bösterling with Vossloh Fastening Systems.
chosen as the reference system. track section compared with a
D
EEP in the Brazilian investment plan drawn up in September 2022, as well as replacing the
countryside, down winding conjunction with the Ministry of wooden and steel sleepers with concrete
roads, a major project is Infrastructure and ANTT, which is based sleepers, which began in April 2023.
underway to modernise part of the on three pillars: expanding capacity to The launch of the project followed a
country’s heavy-haul rail network that meet performance targets; structuring decade of planning, including research
connects iron ore mines in the state of investment in the public interest; and into which track machines would be
Minas Gerais with ports in the state of work to improve urban mobility and best suited to the challenging
Rio de Janeiro. minimise conflict with road traffic in requirements of the Brazilian network.
The project is one of the major urban areas. Overall, MRS plans to After conducting its market research,
investments underway following the invest Reais 31bn ($US 6.3bn) by 2056, MRS purchased:
long-term renewal of the concession including an outlay of around Reais • two 09-2X tamping machines, two
held by Brazilian freight railway MRS 11bn in infrastructure work and USP 2005 ballast profiling machines, a
Logistics in July 2022, which has purchasing promised in return for the Unimat 08/475 S 3S tamping machine,
prompted a major programme to early renewal of the concession. and a PBR 500 ballast profiling machine
improve the 1643km network operated MRS is now working towards from Plasser & Theurer
by the company across the states of meeting the more than 500 obligations • an LRV Railvac rail-mounted excavating
Minas Gerais, Rio de Janeiro and São included in the plan, which are machine and 17 MHC series material-
Paulo. designed to guarantee the quality of the handling wagons from Loram, and
MRS Logistics was created in 1996, services provided by the company, to • a C 75-2C double-screen ballast
when the government privatised the maintain the assets in perfect operating cleaner and a P 190 track renewal train,
southeast regional rail network. The condition and to improve the level of with two material handling wagons,
southeast region which the network service for customers. from Matisa.
serves is responsible for generating
about half of Brazil’s GDP, and MRS
says that approximately 20% of the Track renewal
freight volume exported in Brazil and Among the company’s current
one third of all freight transported by investments is a $US 500m project to
rail in the country passes over its renew more than 560km of
network. 1600mm-gauge track on the Steel
The railway operates a fleet of more Railway and Serra do Mar lines, which
than 18,000 wagons and 800 carry iron ore from mines in Minas
locomotives. Gerais south to four ports in the state of
The company’s initial concession was Rio de Janeiro. Full wagons are moved
due to expire in 2026, but the contract along on the Steel Railway from
signed with the federal government in Itabirito, Minas Gerais, to Barra Mansa,
the 1990s provided for an early renewal, Rio de Janeiro, before travelling on the
which MRS applied for in 2015 before double-track line from Serra do Mar to
presenting its business plan and the four ports of Rio de Janeiro, Itaguai,
holding public hearings to gather input. Sudeste, and Guaiba. Empty wagons
On July 27 2022, the board of the are then transported back to Minas
National Land Transport Agency Gerais on the Central Line of which
(ANTT) approved the studies and MRS operates the southern broad-gauge
documents for the early renewal of the section.
contract to operate the network, with Track renewal is due to take place
the agreement extending the contract between 2022 and 2033 at a rate of more
until 2056 signed on July 29 2022. Under than 50km a year. Ballast on the lines
the terms of the new contract, MRS has reached the end of its useful life,
plans to double the volume of general with low resistance and high variation
freight and multiply the volume of in stiffness causing significant dynamic Among the four track machines purchased by
intermodal freight by seven times over impacts. The project includes MRS for the renewal project is a a C 75-2C
the new contract period. undercutting and renewing the ballast double-screen ballast cleaner from Matisa.
The new contract includes an along the route, which began in Photo: MRS
42
“We selected the machines according ballast an hour and screen 1500m³ per A Catt guiding system minimises the
to the maintenance needs identified for hour, with two free oscillating screens, amount of corrections to track
our line, the line clearance and the and can operate on curves of down to geometry after ballast cleaning. The P
maintenance interval model proposed 150m radius. The machine has 12 190 track renewal train is able to lay up
for our situation,” says MRS railway powered axles, and multiple to 650m of sleepers per hour.
maintenance specialist, Mr Fábio Melo. interchangeable excavating units to Training of maintenance and
“Due to the need for complete ballast adapt to various worksite conditions. operating personnel was provided by
the equipment manufacturers, Melo
says, with specialised technical support
“
staff hired to continue staff
development. Specialist experts who
We selected the machines according to the maintenance have already worked with similar
needs identified for our line, the line clearance and the models of machines were also hired.
Work is now well underway, with
maintenance interval model proposed for our situation.
Fábio Melo
43
Track | Brazil
around 15km of track already renewed railway line such as pieces of buried MRS purchasing three of each.
in the Pinheiral region by the end of track, which affects the reliability of the “These wagons are necessary due to
November. In August, MRS organised a equipment,” he says. MRS’ work model, as we often work
visit to the section between Valdemar It was also challenging to gather a with night maintenance shifts,” Melo
de Brito and Vargem Alegre during the team that was suitably qualified and says. “As a result, we need field
International Heavy Haul Association experienced to plan, schedule and maintenance support from the
(IHHA) conference in Rio, which execute such a major project. The high maintenance wagon, and a dining area
enabled attendees to see the project at number of tunnels and viaducts has and space for administrative meetings
first hand and to discuss with the caused issues with clearances, along in the staff wagon.”
engineers the lessons learned so far, as with the geometric alignment, with the The project also includes the
well as to provide advice on ways to tight curve radius in some locations construction of a new workshop to
further improve the project and the directly interfering with planning. support the maintenance of the more
operation of the machines. The hot climate of Brazil has required than 26 machines and 81 wagons
the machines to be adapted due to the purchased for the track renewal project,
viscosity of oil used in Europe, while a condition included in the concession
The visit radiators needed to be adapted to avoid renewal.
During the visit, IHHA delegates saw overheating. When complete the lines will be
how the first line had been completed, The remoteness of the worksites has upgraded from maintenance class 3 to
with work underway on the second. also required some Brazilian ingenuity, class 4, with axleloads increasing from
Trains were continuing to operate on with MRS working with engineering 32.5 tonnes to 37.5 tonnes and the
the completed line while work was still firm ANX of Paulínia, São Paulo, to maximum speed raised to 64km/h.
underway. Both the ballast cleaning and develop a maintenance wagon and staff This investment means that, despite
track renewal trains were in operation, wagon, which can be attached to the the costs and challenges, MRS is well on
about 2km apart, with both followed by rear of the tamping or ballast cleaning its way to improving capacity and
a tamping machine. train. Both are built using 20ft therefore its ability to meet its
Working on track that hasn’t been containers mounted on a flat wagon, ambitious growth targets. It also means
renewed for more than 100 years is not modified to include a workshop inside it will be leaving the infrastructure it
easy, Melo says. the maintenance wagon, along with a took over in 1996 in a better condition
“Because we’ve gone a long time small kitchen, toilet and staff room than when it received it, and ready for
without cleaning the ballast, we complete with TV inside the staff expected traffic growth over the next 30
encountered several obstacles on the wagon. Both are air-conditioned, with years or so. IRJ
REGISTER NOW!
PARTICIPANTS FROM 8 THEMED EXHIBITORS FROM
48 COUNTRIES SESSIONS 20 COUNTRIES
“
because they’re going to get transparency over the cost of
there 10 minutes quicker,” he the project.
Fundamentally, said. “They'll go because it's “Governance comes right at
affordable, it's reliable and it's the beginning, understanding
you have to have quick.” In addition, “the way who's responsible for what,”
we used to value time savings he said. “Fundamentally, you
a vision, you is different for all the people have to have a vision, you
who are getting on the train have to know where you're
have to know now,” he said, noting how trying to go. And you have to
many passengers were get people to buy in to that
where you're travelling for leisure off-peak. vision,” he said. “There's no
“The world has changed as
trying to go. And a consequence of Covid,”
magic wand. So you've got to
be realistic. But start by saying
you have to get Armitt said. “We are almost what you are trying to do,
certainly not going back to what’s the vision, what do we
people to buy in five-day weeks. Commuters want to do. What's the future
will now buy a daily ticket, going to look like. How can
to that vision. not monthly or yearly. All we make it better, because
these things we have to take we’re only going to make it
onboard. We have to design better together.” IRJ
© Jacky Lannoy
We do it!
Year after year, accurate reprofiling of the complete tunnel in one single-pass operation
with a guaranteed metal removal of 0.3 mm on the whole railhead.
SPENO INTERNATIONAL
speno.ch
HIGH CAPACITY I PRECISION I RELIABILITY
plassertheurer.com
”Plasser & Theurer“, ”Plasser“ and ”P&T“ are internationally registered trademarks