Hunter Fire Solutions Ltd

Peterborough Court

Website: hunterventilation.com

Hunter Fire Solutions Ltd Unit 11, Woodroyd Mills, Cleckheaton, west Yorks, BD19 3AF
30th May 2023

Tel: 01422 825940

Peterborough Court – Lobby Depressurisation and Stair AOV systems

Michael J Lonsdale
For the attention of Lukasz Udela. Our ref: SO23-009Rev A.im

Dear Lukasz,

Further to receipt of your enquiry for the above project we are pleased to attach our
quotation for the works above.

We trust the attached meets with your approval, should you have any queries, please
contact the undersigned.

Yours sincerely,
For Hunter Fire Solutions Ltd

Ian Moore
Ian Moore
Email – ian@huntergroup-uk.com

Enc.

Hunter Fire Solutions Ltd Unit 11, Woodroyd Mills, Cleckheaton, west Yorks, BD19 3AF
The Project comprises:

Above Ground

West Core

Level B3 to 10th floor (14 levels)

1 number stair.

North Core

Level B3 to 10th floor (14 levels)

1 number stair.

East Core

Level B3 to 10th floor (14 levels)

1 number stair.

South Core

1 number stair AOV and associated controls.

Hunter Fire Solutions Ltd Unit 11, Woodroyd Mills, Cleckheaton, west Yorks, BD19 3AF
West Core

Item 1 1 no. Head of Powered Shaft Extract plant comprising:


710mm diameter EN12101-3 Certificated (300oC for 60 mins)
CE marked
3m max length Fire rated ductwork connected to a builderswork smoke shaft
with finished and weathered curb (Min 0.6m2 cross sectional area) Sgaft and
curb by others.
Inlet attenuator
Discharge attenuator
Shut off damper

Item 2 1 no. Head of Stair vents


1.0m2 Measured free area
24V motor
EN 12101 tested & certified
CE marked
Polycarbonate lid
Mill finished aluminium
140o Opening
Offset mechanism for combined AOV and roof access

Item 3 1 no. Ground floor vertical inlet AOV


1.0m2 Measured free area
24V motor
EN 12101 tested & certified
CE marked
Aluminium louvred
Mill finished aluminium

Item 4 14 no. louvred fire smoke dampers EN12101-8 Certificated in black


0.5m2 Measured free area
24V motor
CE marked
Complete with white linear bar grill

Item 5 14 no. Lobby Test Override Switches


Orange
Mounted on each level

Item 6 14 no. Pressure differential sensors

Item 7 2 no. Stair Fireman Override Switches


OPEN/AUTO
Orange
Mounted on top & bottom of stair

Hunter Fire Solutions Ltd Unit 11, Woodroyd Mills, Cleckheaton, west Yorks, BD19 3AF
Item 8 1no. Main control panel suitable to accept multiple number fire alarm
Interfaces. The panel locks out the non fire floors and opens the head of stair
vent with any of the end of corridor vents. Complete with battery back up
Suitable of receiving a single protected supply (ATS by others) and 15
number Fire alarm interfaces.

Item 9 1 no. Installation


Ventilator onto roof upstand / prepared weathered openings
Flaps or Damper/Grilles into structural opening
Control Panel onto wall structure
Switches onto wall structure

Item 10 1 no. Electrical Wiring


Ventilators in FP200+ or equivalent (onto containment provided by others)
Switches in FP200+ or equivalent (onto containment provided by others)
Fans in FP600 or equivalent (onto containment provided by others)

Item 11 1 no. Commissioning and Demonstration


Certification

Item 12 2 no. Attenuators (subject to confirmation of the noise specification) temperature


rated to 300oC

Item 13 1 no. CFD analysis to compare an natural prescriptive shaft.

Total supply and installation costs for the equipment

£112,296nett

Hunter Fire Solutions Ltd Unit 11, Woodroyd Mills, Cleckheaton, west Yorks, BD19 3AF
North Core

Item 1 1 no. Head of Powered Shaft Extract plant comprising:


710mm diameter EN12101-3 Certificated (300oC for 60 mins)
CE marked
3m max length Fire rated ductwork connected to a builderswork smoke shaft
with finished and weathered curb (Min 0.6m2 cross sectional area) Sgaft and
curb by others.
Inlet attenuator
Discharge attenuator
Shut off damper

Item 2 1 no. Head of Stair vents


1.0m2 Measured free area
24V motor
EN 12101 tested & certified
CE marked
Polycarbonate lid
Mill finished aluminium
140o Opening
Offset mechanism for combined AOV and roof access

Item 3 1 no. Ground floor vertical inlet AOV


1.0m2 Measured free area
24V motor
EN 12101 tested & certified
CE marked
Aluminium louvred
Mill finished aluminium

Item 4 14 no. louvred fire smoke dampers EN12101-8 Certificated in black


0.5m2 Measured free area
24V motor
CE marked
Complete with white linear bar grill

Item 5 14 no. Lobby Test Override Switches


Orange
Mounted on each level

Item 6 14 no. Pressure differential sensors

Item 7 2 no. Stair Fireman Override Switches


OPEN/AUTO
Orange
Mounted on top & bottom of stair

Hunter Fire Solutions Ltd Unit 11, Woodroyd Mills, Cleckheaton, west Yorks, BD19 3AF
Item 8 1no. Main control panel suitable to accept multiple number fire alarm
Interfaces. The panel locks out the non fire floors and opens the head of stair
vent with any of the end of corridor vents. Complete with battery back up
Suitable of receiving a single protected supply (ATS by others) and 15
number Fire alarm interfaces.

Item 9 1 no. Installation


Ventilator onto roof upstand / prepared weathered openings
Flaps or Damper/Grilles into structural opening
Control Panel onto wall structure
Switches onto wall structure

Item 10 1 no. Electrical Wiring


Ventilators in FP200+ or equivalent (onto containment provided by others)
Switches in FP200+ or equivalent (onto containment provided by others)
Fans in FP600 or equivalent (onto containment provided by others)

Item 11 1 no. Commissioning and Demonstration


Certification

Item 12 2 no. Attenuators (subject to confirmation of the noise specification) temperature


rated to 300oC

Item 13 1 no. CFD analysis to compare an natural prescriptive shaft.

Total supply and installation costs for the equipment

£112,296nett

Hunter Fire Solutions Ltd Unit 11, Woodroyd Mills, Cleckheaton, west Yorks, BD19 3AF
East Core

Item 1 1 no. Head of Powered Shaft Extract plant comprising:


710mm diameter EN12101-3 Certificated (300oC for 60 mins)
CE marked
3m max length Fire rated ductwork connected to a builderswork smoke shaft
with finished and weathered curb (Min 0.6m2 cross sectional area) Sgaft and
curb by others.
Inlet attenuator
Discharge attenuator
Shut off damper

Item 2 1 no. Head of Stair vents


1.0m2 Measured free area
24V motor
EN 12101 tested & certified
CE marked
Polycarbonate lid
Mill finished aluminium
140o Opening
Offset mechanism for combined AOV and roof access

Item 3 1 no. Ground floor vertical inlet AOV


1.0m2 Measured free area
24V motor
EN 12101 tested & certified
CE marked
Aluminium louvred
Mill finished aluminium

Item 4 14 no. louvred fire smoke dampers EN12101-8 Certificated in black


0.5m2 Measured free area
24V motor
CE marked
Complete with white linear bar grill

Item 5 14 no. Lobby Test Override Switches


Orange
Mounted on each level

Item 6 14 no. Pressure differential sensors

Item 7 2 no. Stair Fireman Override Switches


OPEN/AUTO
Orange
Mounted on top & bottom of stair

Hunter Fire Solutions Ltd Unit 11, Woodroyd Mills, Cleckheaton, west Yorks, BD19 3AF
Item 8 1no. Main control panel suitable to accept multiple number fire alarm
Interfaces. The panel locks out the non fire floors and opens the head of stair
vent with any of the end of corridor vents. Complete with battery back up
Suitable of receiving a single protected supply (ATS by others) and 15
number Fire alarm interfaces.

Item 9 1 no. Installation


Ventilator onto roof upstand / prepared weathered openings
Flaps or Damper/Grilles into structural opening
Control Panel onto wall structure
Switches onto wall structure

Item 10 1 no. Electrical Wiring


Ventilators in FP200+ or equivalent (onto containment provided by others)
Switches in FP200+ or equivalent (onto containment provided by others)
Fans in FP600 or equivalent (onto containment provided by others)

Item 11 1 no. Commissioning and Demonstration


Certification

Item 12 2 no. Attenuators (subject to confirmation of the noise specification) temperature


rated to 300oC

Item 13 1 no. CFD analysis to compare an natural prescriptive shaft.

Total supply and installation costs for the equipment

£112,296nett

Hunter Fire Solutions Ltd Unit 11, Woodroyd Mills, Cleckheaton, west Yorks, BD19 3AF
South Core

Item 1 1 no. Head of Stair vents


1.0m2 Measured free area
24V motor
EN 12101 tested & certified
CE marked
Polycarbonate lid
Mill finished aluminium
140o Opening
Offset mechanism for combined AOV and roof access

Item 2 2 no. Stair Fireman Override Switches


OPEN/AUTO
Orange
Mounted on top & bottom of stair

Item 3 1no. Main control Bazttery back up contraol panel

Item 4 1 no. Installation


Ventilator onto roof upstand / prepared weathered openings
Control Panel onto wall structure
Switches onto wall structure

Item 5 1 no. Electrical Wiring


Ventilators in FP200+ or equivalent (onto containment provided by others)
Switches in FP200+ or equivalent (onto containment provided by others)

Item 6 1 no. Commissioning and Demonstration


Certification

Total supply and installation costs for the equipment

£7,826nett

Resume of costs

Hunter Fire Solutions Ltd Unit 11, Woodroyd Mills, Cleckheaton, west Yorks, BD19 3AF
West Core £112,296 nett

North Core £112,296 nett

East Core £112,296 nett

South Core £7,826 nett

Total £344,714 nett


Exclusions: Builder’s work
Smoke/Heat detection system
Steelwork
Hoisting & Craneage
Main power supplies (primary & secondary)
Fire alarm interfaces
BMS interfaces
Containment (primary and secondary)
Scaffolding over 3.0m
External discharge louvre, plenums and shafts

Other commercial implications / savings:

Taking the pressurization system as shown compared with the Depressurisation system on
the West Core:

1 No fans or shaft to pressurise the stair required.


2 Fans to pressurise the lobby removed Circa 45kw.
3 Fans to depressurise the lobby added Circa 9kw.
4 Ductwork to serve the lift lobby to have a damper at each floor.
5 Ductwork to serve the lobby removed.
6 Accommodation air relief not required.
7 Extract system within basement removed.
8 Size of protected power supply to the system dramatically reduced.

Hunter Fire Solutions Ltd Unit 11, Woodroyd Mills, Cleckheaton, west Yorks, BD19 3AF
Installation: Fixing of all the above items shall be carried out in one continuous operation.
Our quotation has been based upon continuity of work during normal working hours
(8:00am to 5:30pm Monday to Friday) with clear adequate site access at all times.
Installation will proceed on a mutually agreed programme of works. Any additional
cost resulting from or delays or acceleration caused or required by others would be
submitted as an additional item. A re-established charge for return to site will be
£525.00 for each occasion.

Scaffolding: Any scaffold / access / hoisting equipment available for our use and provided by
others should be suitable for our requirements. Should this not be the case, an
additional charge will be levied to cater for our operations.

Sealants: Our offer does not include for final pointing.

Drawings: Drawings will be supplied for the contract placed within 4 weeks from receipt of
Construction Issue drawings in DWG format.

Design: 10% of contract value will be due for payment upon issue/approval of design
drawings.

O&M: Operation & Maintenance Manuals are available on request at a cost of £50.00 for
the first and £15.00 for each copy thereafter. This will consist of a colour project
specific hard copy of the manual, a full CD containing the O&M, as-built drawings in
AutoCAD .dwg format and an electronic copy of our louvre brochure.

Attendances: The attendance’s implicit in our offer are set out on the enclosed attendances
schedule.

Terms &: Our Terms & Conditions will apply in absence of any others being agreed.
Conditions

Payment: Within 30 days from submission of invoice.

V.A.T: All prices quoted exclude VAT, which will be charged at the rates ruling at time of
invoice.

Validity: Our quotation is open for acceptance for a period of 90 days from quotation date.

Variations: Our price is based on the cost of the items stated above. Should variations occur
they will be priced and charged accordingly.

Credit: Our offer is subject to a satisfactory credit arrangement being reached at the
contract stage.

Retentions: Due to our limited involvement in this project, it is deemed that Retentions are not
accepted.

Hunter Fire Solutions Ltd Unit 11, Woodroyd Mills, Cleckheaton, west Yorks, BD19 3AF
FACILITIES TO BE PROVIDED BY OTHERS HFSL NOTES
1. Design of system X
2. Preparation of structure fans (suitable X
base)
3. Provision of drawings for approval X
4. Unloading & safe handling of our X
materials
5. Primary steelwork X
6. Secondary support steelwork for fans X
7. Distribution of our materials X
8. Specialist scaffolding X
9. Mobile towers up to 3m X
10. Hoisting of equipment to roof X
11. Solid floor to work from X
12. Installation of Induction fans and controls X
13. Installation of extract arrangements X
14. Supply and install ductwork X
15. Protection for delivery X
16. Power supply (110v) for small hand tools X
17. Primary containment X
18. Secondary containment X
19. Electrical wiring to fans & controls X
20. Safe storage of materials on site X
21. Responsibility for the protection of our X
works on site after installation
22. Provision of in-house contracts engineer X
23. Clear rubbish to skip provided on site by X
others
24. Louvres to elevation X
25. Extract Intake (internal) grilles X
26. Extract Intake (internal) dampers n/a
27. Prepared structural openings X
28. Site engineer X
29. Site survey/measure X
30. Risk Assessments X
31. Installation Method Statements X
32. Testing & Commissioning X
33. O&M Manual and Certification X

Hunter Fire Solutions Ltd Unit 11, Woodroyd Mills, Cleckheaton, west Yorks, BD19 3AF