Professional Documents
Culture Documents
Automation & Control Requirements For Package With PLC (Coc)
Automation & Control Requirements For Package With PLC (Coc)
03
02
INDEX
1 INTRODUCTION .................................................................................................. 3
1.1 DEFINITIONS ................................................................................................ 3
1.2 ABBREVIATIONS ......................................................................................... 4
1.3 REFERENCE DOCUMENTS ......................................................................... 5
2 ENGINEERING ..................................................................................................... 6
2.1 LIST OF DOCUMENTS REQUIRED FOR THE PACKAGE CONTROL
SYSTEMS ENGINEERING ...................................................................................... 6
2.2 SOFTWARE REQUIREMENTS FOR DOCUMENTATION ........................... 7
2.3 ENGINEERING SERVICES........................................................................... 7
2.4 SCOPE OF SUPPLY ..................................................................................... 8
2.5 AUTOMATION & CONTROL – BATTERY LIMITS..................................... 12
Identification Code
1 INTRODUCTION
This specification defines the general requirements about the automation and control (limit of
supply, standard execution, materials) to be foreseen for the CO2 Compressor (20-K-102)
package.
1.1 DEFINITIONS
In this and in all the other applicable documents, the following terms will be used to identify
the different parties involved:
1.2 ABBREVIATIONS
Acronym Description
AC Alternate Current
AI Analog Input signal
AO Analog Output signal
CPU Central Processing Unit
DC Direct Current
DCS Distributed Control System
DI Digital Input signal
DO Digital Output signal
EMC Electro Magnetic Compatibility
ESD Emergency Shutdown System
EMI Electromagnetic Interference
FAT Factory Acceptance Test
FBD Functional Block Diagram
HART Highway Addressable Remote Transducer Protocol
HAZOP Hazard and Operability Analysis
HMI Human Machine Interface
HW Hardware
IAMS Instrument Asset Management System (HART)
IFAT Integrated Factory Acceptance Test
I/O Input / Output
IOM Installation, Operating and Maintenance Manual
IS Intrinsically Safe
LED Light Emitting Diode
MCC Motor Control Centre
MDR Manufacturing Data Report
MOS Maintenance Override Switch
MPS Machinery Protection System
NIS Not Intrinsically Safe
OPC Open Connectivity standard (OLE for Process control)
PLC Programmable Logic Controller
RFI Radio Frequency Interference
SAT Site Acceptance Testing
SIF Safety Instrumented Function
SIL Safety Integrity Level
SIS Safety Instrumented System
SOE Sequence Of Events
SW Software
UPS Uninterruptible Power Supply
VDU Visual Display Unit (LED / TFT Monitor)
Identification Code
The following project specifications form a part of this specification & shall be applied:
CONTRACTOR will advise VENDOR of any changes to Reference Documents after the
Package Purchase Order issuing. VENDOR shall comply with CONTRACTOR instruction to
fully comply with any changes on Referenced Documents. VENDOR shall advise of conflict (if
any) among Reference Documents or other technical specification listed in the Package
Material Requisition and therefore CONTRACTOR will determine which shall govern and
inform timely VENDOR.
Identification Code
2 ENGINEERING
1) UCP PLC system, complying with “Type 2 Package Equipment - Complex Process
Package” requirements mentioned in ‘PLC Technical Specification document no. 4128-
JK-SE-00000130’.
2) UCP PLC system shall be supplied with the following
a. Proven, standard fault tolerant, fail-safe, dual redundant logic processors
(CPU) including redundant I/O bus extenders and accessories
Identification Code
b. redundant I/O modules for all types of I/Os (AI/AO/DI/DO) signals of SIL and
non-SIL certified hardware
c. redundant communication modules, dedicated for DCS communication
(Modbus TCP/IP with auto-changeover)
d. redundant communication with vendor supplied Operator and Engineering
stations.
e. redundant network switches
f. redundant power supplies
3) Engineering and Operator stations shall be supplied with the following
a. One (1 no.) Operator station HMI PC of latest configuration with 24” monitor
(Full HD), suitable for 24 x 7 service. This PC shall be loaded with the latest
version of Windows operating system, software for all the operator functions
required for the control of the supplied package Machinery and any other sub-
systems in the UCP supply. This PC shall be in the Operator room of the
central control building and primarily used for Operational purposes. The HMI
software used shall have the functionality of facilitating all required operations
of the machine consisting of graphic displays, First-out alarm, other alarm
messages, operator action journal, SOE / time stamping of trips, real time and
historical trend viewing and export of trend data in Excel format. This PC could
also be loaded with engineering software, in case of failure of Engineering PC
with license interchange.
b. One (1 no.) Engineering / Operator Station HMI PC of latest configuration with
24” monitor (Full HD), suitable for 24 x 7 service. This PC shall be loaded with
the latest version of Windows operating system, all engineering & configuration
software for all the sub-systems in the UCP supply. This PC shall be in the
engineering room of the central control building and primarily used for
Engineering / configuration purposes. This PC shall also be loaded with
Operator functionality (same as above (a)) capable of performing all the
functions of Operator Station.
c. To meet the above requirements, it is recommended to have similar hardware
configuration for both the stations.
d. USB speakers shall be provided for the Operator station HMI PC for
generation of audible alarm for Operator action.
e. Accessories for PCs like keyboard, mouse, power cables, monitor stands, etc.
f. UPS power supplies for Operator and engineering stations shall be powered
from the UCP cabinet itself.
4) Machine Protection System shall be supplied with the following
a. Bently Nevada 3500 Machine Protection System (MPS) rack(s) shall be
supplied in compliance with latest revision of API 670. All the monitoring
parameters shall be transferred to the PLC via redundant serial links. Trip
commands shall be hardwired from MPS racks to PLC.
b. Bently rack configuration software shall be supplied and loaded in the
engineering station.
Identification Code
(19” size, only if recommended by OEM) installed near the machine shall be
included in the scope of supply. Single mode F.O cable with SC connector
shall be considered as project standard.
d. UCP panel shall be mounted in the rack room of the CCR building. Vendor
shall supply CAT-5E (minimum) Ethernet cable with RJ-45 connectors
between UCP network switches and the Operator station (located in Operator
Console bay) and Engineering Station (located in Engineering room). Vendor
to consider 100m cable length for each leg of communication cable link.
e. Software licenses are preferred over hardware license (e.g. USB dongle) for
the project. Wherever hardware license(s) are mandatory to be used, they
shall be securely located inside the CPU compartment of the PCs using
suitable USB ports/extenders. In case of Tower PCs, the CPU case shall be
supplied with lock and key arrangement. No hardware license dongle shall be
located outside the CPU casing in any case. In case such hardware dongles
are to be dispatched separately, they shall be handled in person by the
vendor’s field service engineer visit during SAT at site, to avoid loss / theft of
such critical items.
f. DCS to PLC Serial communication shall be through a single dedicated
redundant Modbus/TCP-IP channel. All the subsystems (like BN3500) of the
UCP shall transfer the data to PLC and PLC shall consolidate all the
subsystems data and provide as a single source of data link to DCS. DCS shall
be the Master of such communication link.
g. If permitted by machinery OEM, MOS key switches shall be supplied within the
UCP panels with key lock arrangement for safety.
h. If required by machinery OEM, Printer for alarm, trend, graphic printing from
Operator / Engineering station shall be supplied.
i. Vendor shall share their Operator HMI graphic pages as design inputs to the
Contractor selected DCS vendor for duplication of similar graphics in DCS for
monitoring purpose.
j. Vendor control engineering scope in compliance with serial communication
guidelines, HMI development guidelines, Basic Plant Control Philosophy,
Safety Requirement Specification, etc as per the reference documents issued
for the project.
Identification Code