Inspection and Test Plan – Metal Wall Cladding System of Fixed Bridge Type C
& Type F @ T2 (Type: EWS-501 & EWS-502)
APPROVAL
Prepared
Rev. Description / by Checked by Approved by
No Date Reason for
Subcontractor Technical Office Deputy Construction
Issue Limak Engineer QAQC Manager HSE Manager
Manager Manager
1st Issue for Mohammed
A 25.06.2022 Internal Sahin Sevgi Selcuk Bekir Oghzan Yenilmaz Evren Bingol
Fetoh
Revıew
1st Official Mohammed
00 27.06.2022 Sahin Sevgi Selcuk Bekir Oghzan Yenilmaz Evren Bingol
Submission Fetoh
Wuhan
2nd official Mohammed
B 29.09.2022 Sahin Sevgi Selcuk Bekir Oghzan Yenilmaz Evren Bingol
Submissions Fetoh
Doc. Title: Inspection and Test Plan – Metal Wall Cladding System of Fixed
Page 20.
1. F.8 Survey check of installed Aluminum
Panel (Line & Level)
2. Spc. 07 42 13,part-3 Cl.3.03 A.1
11 Noted and revised in related activity.
3. Each Section
4. Refer clause and provide values
5. H.H.H.H.H
6. IRF through ACONEX Survey Report
LKW-FCD-MST-000009
Structure Calculation Report
WHLY-FCD-CAL-000114
Thermal Calculation Report
WHLY-FCD-CAL-000115
Table top mock up(EWS-501)
MAS-LKW-MPW-001195
WPS/PQR
LKW-STR-PRO-000043
ISO 9001:2015
SBT-WTRAN-000016
SBT-WTRAN-000015
LKW-WTRAN-174364
Page 2 of 25
Legend:
W- Witness Inspection Point, H- Mandatory Hold Point for Inspection,
S-Surveillance Inspection Point (No notification required, but activity may be subjected to the Engineer) R- Record/Review
MINISTRY OF PUBLIC WORKS
Construction, Completion, Furnishing, and Maintenance for Kuwait International Airport New Passenger Terminal
II SPA/214
Inspection and Test Plan for Metal Wall Cladding System Installation of T2
(Type:EWS-501&EWS-502)
ITP No: LKW-FCD-ITP-000010 Issue Date:
02.10.2022
Discipline: Architectural Rev. No: 01
Inspection Type
Activit Inspection/Activity Requirements Frequency Acceptance Sub 3rd Site QC Eng
Reference
y Description Reference Criteria Con Pty Eng Eng. Rep Doc. To Be Verified
No
B.1 Metal Wall Cladding Spec. 07 42 13 Before the work Pre-load at 50% of the positive design wind Material Test Certificate
System(PMU test for EWS- o Part 1 Clause 1.04 commencement load H H R W H Test Reports Through
101 with Fixed Bridge C,H,I,J,K • Pre-load the specimen at + 618 Pa ACONEX WF.
interface): Spec. 05 41 00 (50% of the higher positive design wind
Pre-load at 50% of the o Part 1 Clause 1.04 C,F load) for 10 seconds.
positive design wind ASTM E 283 • No separation, plastic deformations or
load ASTM E331 deleterious should be observed.
Air infiltration AAMA 501.1
Static water ASTM E 330 Air infiltration
penetration test AAMA 501.4 • Positive static pressure + 600 Pa.
Dynamic Water AAMA 501.5 • Air leakage of fixed wall area shall not
Penetration test NFPA 251 exceed 1.5m³/Hr/sqm.
100% Structural ISO 10140 -2: 2010
performance Test LKW-FCD-MST-000009 Static Water Penetration Test
Seismic Racking Test WHLY-FCD-REP-000013 • Test shall be in accordance with ASTM
Thermal cycling test E331, this pressure to be+600
Structural safety test Pa.Adjust the water spray to the
with 1.5 times wind specified rate of 3.4L/m2.min.
pressure • The total time of test is no less than 15
Impact test according minutes with water flow rate
to ANSI Z97.1 .for class 3.4L/m2.min. Remove the air pressure
A glazing difference and stop the water spray.
Safety event Seismic
performance test Dynamic Water Penetration Test
• Dynamic water penetration testing is
conducted at the specified air pressure
differential by utilizing a wind
generator employing an 84" diameter
propeller.Water is simultaneously
sprayed on to the exterior face of the
Page 3 of 25
Legend:
W- Witness Inspection Point, H- Mandatory Hold Point for Inspection,
S-Surveillance Inspection Point (No notification required, but activity may be subjected to the Engineer) R- Record/Review
MINISTRY OF PUBLIC WORKS
Construction, Completion, Furnishing, and Maintenance for Kuwait International Airport New Passenger Terminal
II SPA/214
Inspection and Test Plan for Metal Wall Cladding System Installation of T2
(Type:EWS-501&EWS-502)
ITP No: LKW-FCD-ITP-000010 Issue Date:
02.10.2022
Discipline: Architectural Rev. No: 01
Inspection Type
Activit Inspection/Activity Requirements Frequency Acceptance Sub 3rd Site QC Eng
Reference
y Description Reference Criteria Con Pty Eng Eng. Rep Doc. To Be Verified
No
Page 5 of 25
Legend:
W- Witness Inspection Point, H- Mandatory Hold Point for Inspection,
S-Surveillance Inspection Point (No notification required, but activity may be subjected to the Engineer) R- Record/Review
MINISTRY OF PUBLIC WORKS
Construction, Completion, Furnishing, and Maintenance for Kuwait International Airport New Passenger Terminal
II SPA/214
Inspection and Test Plan for Metal Wall Cladding System Installation of T2
(Type:EWS-501&EWS-502)
ITP No: LKW-FCD-ITP-000010 Issue Date:
02.10.2022
Discipline: Architectural Rev. No: 01
Inspection Type
Activit Inspection/Activity Requirements Frequency Acceptance Sub 3rd Site QC Eng
Reference
y Description Reference Criteria Con Pty Eng Eng. Rep Doc. To Be Verified
No
Page 6 of 25
Legend:
W- Witness Inspection Point, H- Mandatory Hold Point for Inspection,
S-Surveillance Inspection Point (No notification required, but activity may be subjected to the Engineer) R- Record/Review
MINISTRY OF PUBLIC WORKS
Construction, Completion, Furnishing, and Maintenance for Kuwait International Airport New Passenger Terminal
II SPA/214
Inspection and Test Plan for Metal Wall Cladding System Installation of T2
(Type:EWS-501&EWS-502)
ITP No: LKW-FCD-ITP-000010 Issue Date:
02.10.2022
Discipline: Architectural Rev. No: 01
Inspection Type
Activit Inspection/Activity Requirements Frequency Acceptance Sub 3rd Site QC Eng
Reference
y Description Reference Criteria Con Pty Eng Eng. Rep Doc. To Be Verified
No
Page 8 of 25
Legend:
W- Witness Inspection Point, H- Mandatory Hold Point for Inspection,
S-Surveillance Inspection Point (No notification required, but activity may be subjected to the Engineer) R- Record/Review
MINISTRY OF PUBLIC WORKS
Construction, Completion, Furnishing, and Maintenance for Kuwait International Airport New Passenger Terminal
II SPA/214
Inspection and Test Plan for Metal Wall Cladding System Installation of T2
(Type:EWS-501&EWS-502)
ITP No: LKW-FCD-ITP-000010 Issue Date:
02.10.2022
Discipline: Architectural Rev. No: 01
Inspection Type
Activit Inspection/Activity Requirements Frequency Acceptance Sub 3rd Site QC Eng
Reference
y Description Reference Criteria Con Pty Eng Eng. Rep Doc. To Be Verified
No
C Material
C.1 Shear stud MAS-LKW-MPW-000862 Upon Delivery Type:Types:M12*40 H - H H H MIR
Spec. 07 42 13 Steel grade:Grade 4.8 Delivery Note
o Part-1 Clause 1.03 F,8 Tensile strength:min. 490MPa Material Certificate
WHLY-FCD-DWG-02-900-XX- Yield strength :min. 245MPa (MTC)
2750059 Elongation(G=2in):min.40%
WHLY-FCD-DWG-02-900-XX- Material confirming to approved MAS
2750065
WHLY-FCD-DWG-02-900-XX-
2750067
WHLY-FCD-DWG-02-900-XX-
2750068
WHLY-FCD-DWG-02-900-XX-
2750072
Page 9 of 25
Legend:
W- Witness Inspection Point, H- Mandatory Hold Point for Inspection,
S-Surveillance Inspection Point (No notification required, but activity may be subjected to the Engineer) R- Record/Review
MINISTRY OF PUBLIC WORKS
Construction, Completion, Furnishing, and Maintenance for Kuwait International Airport New Passenger Terminal
II SPA/214
Inspection and Test Plan for Metal Wall Cladding System Installation of T2
(Type:EWS-501&EWS-502)
ITP No: LKW-FCD-ITP-000010 Issue Date:
02.10.2022
Discipline: Architectural Rev. No: 01
Inspection Type
Activit Inspection/Activity Requirements Frequency Acceptance Sub 3rd Site QC Eng
Reference
y Description Reference Criteria Con Pty Eng Eng. Rep Doc. To Be Verified
No
ASTM A 307
AWS D1.6/D1.6M: 2017
LKW-FCD-MST-000009
C.2 Aluminum panel (#240 PVDF) MAS-LKW-MPW-001270 Upon Delivery Thickness:3mm H - H H H MIR
Spec. 07 42 13 Yield Strength:min.125MPa Delivery Note
o Part-2 Clause 2.01 A Tensile strength:145~185MPa Material Certificate
WHLY-FCD-DWG-02-900-XX- Elongation:≥5% (MTC)
2750059 Material confirming to approved MAS 3RD Party Certified
WHLY-FCD-DWG-02-900-XX- Fabrication Reports
2750065 Material test report
WHLY-FCD-DWG-02-900-XX- certified by 3rd
2750067 party
WHLY-FCD-DWG-02-900-XX-
2750068
WHLY-FCD-DWG-02-900-XX-
2750072
AAMA 611
ASTM B209
LKW-FCD-MST-000007
LET-LKW-MPW-01355
Page 10 of 25
Legend:
W- Witness Inspection Point, H- Mandatory Hold Point for Inspection,
S-Surveillance Inspection Point (No notification required, but activity may be subjected to the Engineer) R- Record/Review
MINISTRY OF PUBLIC WORKS
Construction, Completion, Furnishing, and Maintenance for Kuwait International Airport New Passenger Terminal
II SPA/214
Inspection and Test Plan for Metal Wall Cladding System Installation of T2
(Type:EWS-501&EWS-502)
ITP No: LKW-FCD-ITP-000010 Issue Date:
02.10.2022
Discipline: Architectural Rev. No: 01
Inspection Type
Activit Inspection/Activity Requirements Frequency Acceptance Sub 3rd Site QC Eng
Reference
y Description Reference Criteria Con Pty Eng Eng. Rep Doc. To Be Verified
No
C.3 Aluminum Foil MAS-LKW-MPW-001897 Upon Delivery Water Vapor Transmission Rate:< H - H H H MIR
Spec. 07 42 13 0.02g/(m2·h) Delivery Note
o Part-3 Clause 3.02 F,1 Performance:<4×10(-9)g/(m2.s.Pa) Material Certificate
WHLY-FCD-DWG-02-900-XX- Thickness:0.6mm (MTC)
2750059 Material confirming to approved MAS
WHLY-FCD-DWG-02-900-XX-
2750065
WHLY-FCD-DWG-02-900-XX-
2750067
WHLY-FCD-DWG-02-900-XX-
2750068
WHLY-FCD-DWG-02-900-XX-
2750072
DIN 52123
ASTM D1000
ASTM D36
LKW-FCD-MST-000009
C.4 Gypsum board MAS-LKW-MPW-002435 Upon Delivery Fire Rating: 60 Minutes H - H H H MIR
Spec. 07 42 13 Total Acoustic Performance: 54db R’ Delivery Note
o Part-2 Clause 2.02 K w Material Certificate
WHLY-FCD-DWG-02-900-XX- Width Of Partition: 100.00 mm (MTC)
2750059 Impact Rating: Severe Duty
WHLY-FCD-DWG-02-900-XX- Racking Resistance: Category 1
2750065 Material confirming to approved MAS
WHLY-FCD-DWG-02-900-XX-
2750067
WHLY-FCD-DWG-02-900-XX-
2750068
Page 11 of 25
Legend:
W- Witness Inspection Point, H- Mandatory Hold Point for Inspection,
S-Surveillance Inspection Point (No notification required, but activity may be subjected to the Engineer) R- Record/Review
MINISTRY OF PUBLIC WORKS
Construction, Completion, Furnishing, and Maintenance for Kuwait International Airport New Passenger Terminal
II SPA/214
Inspection and Test Plan for Metal Wall Cladding System Installation of T2
(Type:EWS-501&EWS-502)
ITP No: LKW-FCD-ITP-000010 Issue Date:
02.10.2022
Discipline: Architectural Rev. No: 01
Inspection Type
Activit Inspection/Activity Requirements Frequency Acceptance Sub 3rd Site QC Eng
Reference
y Description Reference Criteria Con Pty Eng Eng. Rep Doc. To Be Verified
No
WHLY-FCD-DWG-02-900-XX-
2750072
ASTM C1185
ASTM C1186-08(2016)
LKW-FCD-MST-000009
Page 12 of 25
Legend:
W- Witness Inspection Point, H- Mandatory Hold Point for Inspection,
S-Surveillance Inspection Point (No notification required, but activity may be subjected to the Engineer) R- Record/Review
MINISTRY OF PUBLIC WORKS
Construction, Completion, Furnishing, and Maintenance for Kuwait International Airport New Passenger Terminal
II SPA/214
Inspection and Test Plan for Metal Wall Cladding System Installation of T2
(Type:EWS-501&EWS-502)
ITP No: LKW-FCD-ITP-000010 Issue Date:
02.10.2022
Discipline: Architectural Rev. No: 01
Inspection Type
Activit Inspection/Activity Requirements Frequency Acceptance Sub 3rd Site QC Eng
Reference
y Description Reference Criteria Con Pty Eng Eng. Rep Doc. To Be Verified
No
D Site Mock-Up/Benchmark
D.1 Mock-Up Spec. 07 42 13 Before installation Site mock up is achieved and found IRF (Through
o Part-1 Clause 1.05 E,8 work acceptable H H H H H ACONEX)
Approved Mock-up drawing. commencement Mock-ups of each Type as shown on LKW-QAC-CHL-
WHLY-FCD-DWG-02-900-XX- the Design drawings. 000192
2780015 Build mock-up on temporary
WHLY-FCD-DWG-02-900-XX- supporting structures that will allow
2780016 inspection of internal and external
LKW-FCD-MST-000009 surfaces.
Table-top mock-up Place mock-up outside so that the
MAS-LKW-MPW-001195 effects of sunlight and shade can be
assessed.
Page 13 of 25
Legend:
W- Witness Inspection Point, H- Mandatory Hold Point for Inspection,
S-Surveillance Inspection Point (No notification required, but activity may be subjected to the Engineer) R- Record/Review
MINISTRY OF PUBLIC WORKS
Construction, Completion, Furnishing, and Maintenance for Kuwait International Airport New Passenger Terminal
II SPA/214
Inspection and Test Plan for Metal Wall Cladding System Installation of T2
(Type:EWS-501&EWS-502)
ITP No: LKW-FCD-ITP-000010 Issue Date:
02.10.2022
Discipline: Architectural Rev. No: 01
Inspection Type
Activit Inspection/Activity Requirements Frequency Acceptance Sub 3rd Site QC Eng
Reference
y Description Reference Criteria Con Pty Eng Eng. Rep Doc. To Be Verified
No
D.2 Quality Benchmark Spec. 07 42 13 Before installation Approval of quality benchmark IRF (Through
o Part-1 Clause 1.05 E,9 work installations is required before H H H H H ACONEX)
LKW-FCD-MST-000009 commencement proceeding with remaining LKW-QAC-CHL-
MAS-LKW-MPW-001195 installation. 000192
Build job site quality benchmark
installations to verify selections made
under sample submittals and to
demonstrate aesthetic effects and set
quality standards for workmanship and
installation.
Field testing shall be performed on
quality benchmark in accordance with
the Field Testing Activity Section in this
ITP.
Approved quality benchmark
installations may become part of the
completed Work if undisturbed at time
of Substantial Completion.
Page 14 of 25
Legend:
W- Witness Inspection Point, H- Mandatory Hold Point for Inspection,
S-Surveillance Inspection Point (No notification required, but activity may be subjected to the Engineer) R- Record/Review
MINISTRY OF PUBLIC WORKS
Construction, Completion, Furnishing, and Maintenance for Kuwait International Airport New Passenger Terminal
II SPA/214
Inspection and Test Plan for Metal Wall Cladding System Installation of T2
(Type:EWS-501&EWS-502)
ITP No: LKW-FCD-ITP-000010 Issue Date:
02.10.2022
Discipline: Architectural Rev. No: 01
Inspection Type
Activit Inspection/Activity Requirements Frequency Acceptance Sub 3rd Site QC Eng
Reference
y Description Reference Criteria Con Pty Eng Eng. Rep Doc. To Be Verified
No
AWS D1.6 and fillet undercut etc as per AWS D1.1 & 3rd Party Certified
Approved Typical details Shop welds(25%) of inspection is found acceptable Bend Test Report
drawings Studs Stud welding will use a special Through Aconex
WHLY-FCD-DWG-02-900-XX- automatic welding machine welding to LKW-QAC-CHL-
2750059 the steel structure has been 000192
WHLY-FCD-DWG-02-900-XX- completed, the tolerance control at + /
2750065 - 5 mm
WHLY-FCD-DWG-02-900-XX- Visual read-through of studs on the
2750067 front face of panels shall not be
WHLY-FCD-DWG-02-900-XX- acceptable.
2750068 The weld section shall not exhibit any
WHLY-FCD-DWG-02-900-XX- tearing or cracking.
2750072 The test studs shall be subjected to a
WHLY-FCD-WPS-001 30-degree bend test by striking them
LKW-STR-PRO-000043 with a heavy hammer and the bend
test shall be considered acceptable if
the fracture occurs in the shank not in
the weld.
Bend Test. Studs shall be tested by
alternately bending 30° in opposite
directions in a typical test fixture until
failure occurs. Alternately, studs may
be bent 90° from their original
axis. The procedure shall be considered
qualified if all studs in the set tested
are bent to 90° with no fractures
occurring in the weld.
Page 16 of 25
Legend:
W- Witness Inspection Point, H- Mandatory Hold Point for Inspection,
S-Surveillance Inspection Point (No notification required, but activity may be subjected to the Engineer) R- Record/Review
MINISTRY OF PUBLIC WORKS
Construction, Completion, Furnishing, and Maintenance for Kuwait International Airport New Passenger Terminal
II SPA/214
Inspection and Test Plan for Metal Wall Cladding System Installation of T2
(Type:EWS-501&EWS-502)
ITP No: LKW-FCD-ITP-000010 Issue Date:
02.10.2022
Discipline: Architectural Rev. No: 01
Inspection Type
Activit Inspection/Activity Requirements Frequency Acceptance Sub 3rd Site QC Eng
Reference
y Description Reference Criteria Con Pty Eng Eng. Rep Doc. To Be Verified
No
F.2 Weld Repair(If any) Spec. Section 07 42 13 When Required Refer AWS D1.1 accordingly. IRF(Through
o Part-2. Clause 2.06 D Repairs made by welding shall be done H - H W W ACONEX)
Approved Method Statement in compliance with the requirements LKW-QAC-CHL-
LKW-FCD-MST-000009 of AWS D1.1 Clause 7.7.3&7.7.5 and 000192
AWS D1.6 the accepted welding procedures
Approved Typical details Shop Stud welding:Oxide-free base metal
drawings shielded with argon gas, 99.95% pure.
WHLY-FCD-DWG-02-900-XX-
2750059
WHLY-FCD-DWG-02-900-XX-
2750065
WHLY-FCD-DWG-02-900-XX-
2750067
WHLY-FCD-DWG-02-900-XX-
2750068
WHLY-FCD-DWG-02-900-XX-
2750072
WHLY-FCD-WPS-001
LKW-STR-PRO-000043
F.3 Surface Preparation and Spec. Section 08 44 13 Each welded area 100 microns shall be applied for H H W W S/R Related
Primer Touch up Application o Part-2. Clause 2.06 D primer subcontractor IRF
(welding area) Method statement Use spray application for painting. The ref. No. will be
LKW-FCD-MST-000009 minimum thickness shall be mentioned.
LKW-STR-MST-000047 Rev.03 maintained on all corners, edges and
Clause 5.9 and Clause 6 ends of pieces.
AWS D1.1,Clause 7.7.3&7.7.5 Painted surface no sagging or winking
The damaged surface shall be cleaned
with power brush / disc sander or by
sandpaper
Page 17 of 25
Legend:
W- Witness Inspection Point, H- Mandatory Hold Point for Inspection,
S-Surveillance Inspection Point (No notification required, but activity may be subjected to the Engineer) R- Record/Review
MINISTRY OF PUBLIC WORKS
Construction, Completion, Furnishing, and Maintenance for Kuwait International Airport New Passenger Terminal
II SPA/214
Inspection and Test Plan for Metal Wall Cladding System Installation of T2
(Type:EWS-501&EWS-502)
ITP No: LKW-FCD-ITP-000010 Issue Date:
02.10.2022
Discipline: Architectural Rev. No: 01
Inspection Type
Activit Inspection/Activity Requirements Frequency Acceptance Sub 3rd Site QC Eng
Reference
y Description Reference Criteria Con Pty Eng Eng. Rep Doc. To Be Verified
No
F.4 Installation of Gypsum Spec. Section 07 42 13 Each Bay According to approved shop LKW-QAC-CHL-
Board, C shape steel support o Part-1. Clause 1.04 T,1 drawings/details and method of H - H H W 000192
and Rock Wool for System o Part-3. Clause 3.02 D statement. IRF(Through
EWS-502. o Part-3 Clause 3.02 E Size follow the approved shop drawing ACONEX)
o Part-3 Clause 3.02 F and calculation.
Approved Method Statement Install all anchors and supports in full
LKW-FCD-MST-000009 compliance with the performance
Approved Typical details Shop criteria specified without distress to
drawings any component or assembly or panel
WHLY-FCD-DWG-02-900-XX- joint integrity.
2750059 Brackets outside or through the vapor
WHLY-FCD-DWG-02-900-XX- retarder.
2750065
Page 18 of 25
Legend:
W- Witness Inspection Point, H- Mandatory Hold Point for Inspection,
S-Surveillance Inspection Point (No notification required, but activity may be subjected to the Engineer) R- Record/Review
MINISTRY OF PUBLIC WORKS
Construction, Completion, Furnishing, and Maintenance for Kuwait International Airport New Passenger Terminal
II SPA/214
Inspection and Test Plan for Metal Wall Cladding System Installation of T2
(Type:EWS-501&EWS-502)
ITP No: LKW-FCD-ITP-000010 Issue Date:
02.10.2022
Discipline: Architectural Rev. No: 01
Inspection Type
Activit Inspection/Activity Requirements Frequency Acceptance Sub 3rd Site QC Eng
Reference
y Description Reference Criteria Con Pty Eng Eng. Rep Doc. To Be Verified
No
Page 19 of 25
Legend:
W- Witness Inspection Point, H- Mandatory Hold Point for Inspection,
S-Surveillance Inspection Point (No notification required, but activity may be subjected to the Engineer) R- Record/Review
MINISTRY OF PUBLIC WORKS
Construction, Completion, Furnishing, and Maintenance for Kuwait International Airport New Passenger Terminal
II SPA/214
Inspection and Test Plan for Metal Wall Cladding System Installation of T2
(Type:EWS-501&EWS-502)
ITP No: LKW-FCD-ITP-000010 Issue Date:
02.10.2022
Discipline: Architectural Rev. No: 01
Inspection Type
Activit Inspection/Activity Requirements Frequency Acceptance Sub 3rd Site QC Eng
Reference
y Description Reference Criteria Con Pty Eng Eng. Rep Doc. To Be Verified
No
F.5 Installation of Brackets, Spec. Section 07 42 13 Each Bay According to approved shop
Aluminum Profile, Rock Wool o Part-1. Clause 1.04 T,1 drawings/details and method of
and Aluminum Foil for o Part-3. Clause 3.02 D statement.
System EWS-501. o Part-3 Clause 3.02 E Size follow the approved shop drawing
o Part-3 Clause 3.02 F and calculation.
Approved Method Statement Install all anchors and supports in full
LKW-FCD-MST-000009 compliance with the performance
Approved Typical details Shop criteria specified without distress to
drawings any component or assembly or panel
WHLY-FCD-DWG-02-900-XX- joint integrity.
2750059 Brackets outside or through the vapor
WHLY-FCD-DWG-02-900-XX- retarder.
2750065 After located the right place, clamping
WHLY-FCD-DWG-02-900-XX- the nuts, and proceed with the torque
2750067 test as per the specification.
WHLY-FCD-DWG-02-900-XX- Do not install damaged components.
2750068 Rigidly secure non-moving joints.
WHLY-FCD-DWG-02-900-XX- Install anchors with separators and
2750072 isolators to prevent metal corrosion,
electrolytic deterioration, and
impediments to movement of joints.
Page 20 of 25
Legend:
W- Witness Inspection Point, H- Mandatory Hold Point for Inspection,
S-Surveillance Inspection Point (No notification required, but activity may be subjected to the Engineer) R- Record/Review
MINISTRY OF PUBLIC WORKS
Construction, Completion, Furnishing, and Maintenance for Kuwait International Airport New Passenger Terminal
II SPA/214
Inspection and Test Plan for Metal Wall Cladding System Installation of T2
(Type:EWS-501&EWS-502)
ITP No: LKW-FCD-ITP-000010 Issue Date:
02.10.2022
Discipline: Architectural Rev. No: 01
Inspection Type
Activit Inspection/Activity Requirements Frequency Acceptance Sub 3rd Site QC Eng
Reference
y Description Reference Criteria Con Pty Eng Eng. Rep Doc. To Be Verified
No
Page 21 of 25
Legend:
W- Witness Inspection Point, H- Mandatory Hold Point for Inspection,
S-Surveillance Inspection Point (No notification required, but activity may be subjected to the Engineer) R- Record/Review
MINISTRY OF PUBLIC WORKS
Construction, Completion, Furnishing, and Maintenance for Kuwait International Airport New Passenger Terminal
II SPA/214
Inspection and Test Plan for Metal Wall Cladding System Installation of T2
(Type:EWS-501&EWS-502)
ITP No: LKW-FCD-ITP-000010 Issue Date:
02.10.2022
Discipline: Architectural Rev. No: 01
Inspection Type
Activit Inspection/Activity Requirements Frequency Acceptance Sub 3rd Site QC Eng
Reference
y Description Reference Criteria Con Pty Eng Eng. Rep Doc. To Be Verified
No
F.8 Survey check of installed Spec. Section 07 42 13 Each Bay Line: ± 2.0mm of any line expressed by IRF(Through
Aluminum Panel (Line & o Part-3. Clause 3.03 A.1 the framing or panels in any one storey H H H H H ACONEX)
Level) Approved Method Statement height, or structural bay width, and ± Survey Report
LKW-FCD-MST-000009 5.0mm overall.
Approved Typical details Shop Level: ± 2.0mm in any one structural
drawings bay, and ± 5.0mm overall.
WHLY-FCD-DWG-02-900-XX-
2750059
Page 22 of 25
Legend:
W- Witness Inspection Point, H- Mandatory Hold Point for Inspection,
S-Surveillance Inspection Point (No notification required, but activity may be subjected to the Engineer) R- Record/Review
MINISTRY OF PUBLIC WORKS
Construction, Completion, Furnishing, and Maintenance for Kuwait International Airport New Passenger Terminal
II SPA/214
Inspection and Test Plan for Metal Wall Cladding System Installation of T2
(Type:EWS-501&EWS-502)
ITP No: LKW-FCD-ITP-000010 Issue Date:
02.10.2022
Discipline: Architectural Rev. No: 01
Inspection Type
Activit Inspection/Activity Requirements Frequency Acceptance Sub 3rd Site QC Eng
Reference
y Description Reference Criteria Con Pty Eng Eng. Rep Doc. To Be Verified
No
WHLY-FCD-DWG-02-900-XX-
2750065
WHLY-FCD-DWG-02-900-XX-
2750067
WHLY-FCD-DWG-02-900-XX-
2750068
WHLY-FCD-DWG-02-900-XX-
2750072
G Field Testing
G.1 Air Infiltration test(For EWS- Spec. 07 42 13 Min. 3 tests,An area Areas shall be tested for air leakage of IRF (Through
501) o Part-3 Clause 3.05 B.3 not less than 6 1.5 m3/hr/m2 of fixed wall area when H H H H H ACONEX)
ASTM E 783 panels in a 3 x 2 tested at a minimum static-air- LKW-QAC-CHL-
LKW-FCD-MST-000009 array. pressure differential of 600 Pa. 000192
LET-LKW-MPW-01297 If a test fails, the total tested area shall 3rd Party Test
be doubled. Report
Page 23 of 25
Legend:
W- Witness Inspection Point, H- Mandatory Hold Point for Inspection,
S-Surveillance Inspection Point (No notification required, but activity may be subjected to the Engineer) R- Record/Review
MINISTRY OF PUBLIC WORKS
Construction, Completion, Furnishing, and Maintenance for Kuwait International Airport New Passenger Terminal
II SPA/214
Inspection and Test Plan for Metal Wall Cladding System Installation of T2
(Type:EWS-501&EWS-502)
ITP No: LKW-FCD-ITP-000010 Issue Date:
02.10.2022
Discipline: Architectural Rev. No: 01
Inspection Type
Activit Inspection/Activity Requirements Frequency Acceptance Sub 3rd Site QC Eng
Reference
y Description Reference Criteria Con Pty Eng Eng. Rep Doc. To Be Verified
No
J Completion of Activities
J.1 Final Inspection Spec. 07 42 13 Each Bay All above works and test must be IRF (Through
o Part-3 Clause 3.03 A,1 completed. H - H H H ACONEX)
Approved Typical details Shop No visible damage. LKW-QAC-CHL-
Drawings No evidence of defected materials and 000192
WHLY-FCD-DWG-02-900-XX- workmanship.
2750059 No penetration of water into the
WHLY-FCD-DWG-02-900-XX- building.
2750065 No cracking, peeling, flaking of coatings
WHLY-FCD-DWG-02-900-XX- and no discoloration of fading, and
2750067 excessive non-uniformity.
WHLY-FCD-DWG-02-900-XX- All previous approved
2750068 references(Previous IRF reference
WHLY-FCD-DWG-02-900-XX- numbers, Report numbers, ETC.) shall
2750072 be indicated on final inspection IRF.
LKW-FCD-MST-000009
J.2 Cleaning & Protection Spec. 07 42 13 Each Bay On completion of metal wall panel IRF (Through
o Part-3 Clause 3.06 A installation and after removal of H - H H H ACONEX)
o Part-3 Clause 3.06 B surface protection, clean finished LKW-QAC-CHL-
o Part-3 Clause 3.06 C surfaces as recommended by metal 000192
o Part-3 Clause 3.08 A wall panel manufacturer.
o Part-3 Clause 3.08 B After metal wall panel installation,
Approved Shop drawings clear weep holes and drainage
WHLY-FCD-DWG-02-900-XX- channels of obstructions, dirt, and
2750059 sealant.
Page 24 of 25
Legend:
W- Witness Inspection Point, H- Mandatory Hold Point for Inspection,
S-Surveillance Inspection Point (No notification required, but activity may be subjected to the Engineer) R- Record/Review
MINISTRY OF PUBLIC WORKS
Construction, Completion, Furnishing, and Maintenance for Kuwait International Airport New Passenger Terminal
II SPA/214
Inspection and Test Plan for Metal Wall Cladding System Installation of T2
(Type:EWS-501&EWS-502)
ITP No: LKW-FCD-ITP-000010 Issue Date:
02.10.2022
Discipline: Architectural Rev. No: 01
Inspection Type
Activit Inspection/Activity Requirements Frequency Acceptance Sub 3rd Site QC Eng
Reference
y Description Reference Criteria Con Pty Eng Eng. Rep Doc. To Be Verified
No
Note:
Page 25 of 25
Legend:
W- Witness Inspection Point, H- Mandatory Hold Point for Inspection,
S-Surveillance Inspection Point (No notification required, but activity may be subjected to the Engineer) R- Record/Review
Construction, Completion, Furnishing, and Maintenance for Kuwait International
Airport New Passenger Terminal II SPA/214
Metal Wall Cladding System (EWS-501/502) Checklist