Professional Documents
Culture Documents
APPENDIX - Calculation Report of Box Culvert KM 8
APPENDIX - Calculation Report of Box Culvert KM 8
APPENDIX - Calculation Report of Box Culvert KM 8
CALCULATION SHEET:
CALCULATION OF BOX CULVERT KM 8
1
REPORT STRUCTURE
CALCULATION OF BOX CULVERT KM 8
Contents
1 Geometry Data ............................................................................................................. 3
2 Material Properties ....................................................................................................... 3
3 Strength Reduction Factors .......................................................................................... 3
4 Load.............................................................................................................................. 4
4.1 Self-Weight (SW) .................................................................................................................... 4
5 Load Combination........................................................................................................ 8
6 Moment Analysis ......................................................................................................... 8
7 Reinforcement ............................................................................................................ 11
7.1 Top Slab .................................................................................................................................. 11
2
REPORT STRUCTURE
CALCULATION OF BOX CULVERT KM 8
1 Geometry Data
a. Geometry
• Span 1.00 m
• Hight 0.70 m
• Min. depth of fill 0.25 m
• Max. depth of fill 0.50 m
• Length of precast 1.20 m
b. Slab and Wall Thickness
• Top slab thick. 200 mm
• Bottom slab thick. 200 mm
• Sidewall thick. 200 mm
c. Haunch Dimension
• Top vertical 150 mm
• Top horizontal 150 mm
• Bottom vertical 150 mm
• Bottom horizontal 150 mm
d. Outside Clear Concrete Covers
• Top outside 30 mm
• Bottom outside 30 mm
• Sidewall outside 30 mm
e. Inside Clear Concrete Covers
• Top inside 30 mm
• Bottom inside 30 mm
• Sidewall inside 30 mm
f. Soil Data
• Soil unit weight 18 kN/m3
• Min. lateral press 0.3 (coefficient: AASHTO 0.3)
2 Material Properties
a. Concrete
• Concrete strength 21 MPa
• Concrete density 24 kN/m3 (=2400 kg/m3)
b. Reinforcement Rebar
• Yield stress 420 MPa
• Service stress limit 100% from fy
3
REPORT STRUCTURE
CALCULATION OF BOX CULVERT KM 8
4 Load
4.1 Self-Weight (SW)
A dead load of structural elements is automatically calculated by software by providing
a weight multiplier factor of 1 according to the weight density of the material used in the
determination of the load that will work on the structure.
4
REPORT STRUCTURE
CALCULATION OF BOX CULVERT KM 8
5
REPORT STRUCTURE
CALCULATION OF BOX CULVERT KM 8
6
REPORT STRUCTURE
CALCULATION OF BOX CULVERT KM 8
7
REPORT STRUCTURE
CALCULATION OF BOX CULVERT KM 8
5 Load Combination
Description:
• SW : Self Weight
• DL : Dead Load
• SDL : Asphalt Load
• Pa : Earth Pressure Load
• Pae : Earth Pressure Load during an Earthquake
• Ps : Pressure Surcharge Load
• Hidrostatis : Fluid Load
• Pv : Earth Pressure vertical Load
• MVL : Truck Load
• UDL&KEL : Moving Load
6 Moment Analysis
a. Top Slab
8
REPORT STRUCTURE
CALCULATION OF BOX CULVERT KM 8
b. Bottom Slab
9
REPORT STRUCTURE
CALCULATION OF BOX CULVERT KM 8
c. Wall
10
REPORT STRUCTURE
CALCULATION OF BOX CULVERT KM 8
7 Reinforcement
7.1 Top Slab
7.1.1 Option 1
TOP SLAB REINFORCEMENT CALCULATION
Concrete Data:
K fc' Ec ec
b1 f flexural f shear
kg/cm2 MPa kN/m2 mm/mm
250 21 21409519 0.003 0.85 0.90 0.70
Reinforcement Data:
fy Es es dbtump dblap dv cover space
MPa MPa mm/mm mm mm mm mm mm
420 200000 0.0021 13 16 13 30 150
Neg Pos
Flexural Reinforcement Calculation:
c b=e c*Es*d/(e c*Es)+fy 89 mm 88 mm
amax =0.75*b1*c b 56 mm 56 mm
2
a=d-(d -(2*Mu/0.85*fc'*f*b)) 7.87 mm 25.47 mm
2 2
Asneed =Mu/f*fy*(d-a/2) 330 mm 1070 mm
2 2
Asmin =1.4/fy *b*d 502 mm 497 mm
2 2
Asmax =0.75*(0.85*b1*fc'/fy)*(600/600+fy)*b*d 2370 mm 2346 mm
check ------ Asneed < Asmax ok ok
2 2
Asused =max(Asneed ,Asmin ) 502 mm 1070 mm
Flexural reinforcement used 4D13 6D16
Flexural reinforcement spacing 301 mm 180 mm
Used D13 -150 D16-150
Shear Reinforcement Calculation:
Vc=f*(fc')*b*d/6 79.98 kN 79.18 kN
Vs=(Vu-Vc)/f 279.13 kN 280.26 kN
Vsmax=2*(fc')*b*d/3 457.04 kN 452.48 kN
check -------Vc>Vu
Av=max(b*s/3*fy,Vs*s/fy*d) 662.38 mm 2 671.77 mm 2
Shear Reinforcement used: D13-226/150 D13-180/150
D13-150/150 D13-150/150
11
REPORT STRUCTURE
CALCULATION OF BOX CULVERT KM 8
ϕ * Mn 1.2 Mcr
52.60218 10.0579
OK
7.1.2 Option 2
TOP SLAB REINFORCEMENT CALCULATION
Concrete Data:
K fc' Ec ec
b1 f flexural f shear
kg/cm2 MPa kN/m2 mm/mm
250 21 21409519 0.003 0.85 0.90 0.70
Reinforcement Data:
fy Es es dbtump dblap dv cover space
MPa MPa mm/mm mm mm mm mm mm
420 200000 0.0021 13 16 13 30 150
Neg Pos
Flexural Reinforcement Calculation:
c b=e c*Es*d/(e c*Es)+fy 59 mm 58 mm
amax =0.75*b1*c b 38 mm 37 mm
2
a=d-(d -(2*Mu/0.85*fc'*f*b)) 12.21 mm 45.52 mm 12
2 2
Asneed =Mu/f*fy*(d-a/2) 513 mm 1912 mm
2 2
As =1.4/fy *b*d 335 mm 330 mm
Inner Force Data & Section Dimensions:
Direction Mu (kNm) Vu (kN) bflexural (mm) bshear (mm) h (mm) d(mm)
Neg 18 275 1000 1000 150 101
REPORT STRUCTURE
Pos 55 275 1000 1000 CALCULATION
150 OF 99
BOX CULVERT KM 8
Neg Pos
Flexural Reinforcement Calculation:
c b=e c*Es*d/(e c*Es)+fy 59 mm 58 mm
amax =0.75*b1*c b 38 mm 37 mm
2
a=d-(d -(2*Mu/0.85*fc'*f*b)) 12.21 mm 45.52 mm
2 2
Asneed =Mu/f*fy*(d-a/2) 513 mm 1912 mm
2 2
Asmin =1.4/fy *b*d 335 mm 330 mm
2 2
Asmax =0.75*(0.85*b1*fc'/fy)*(600/600+fy)*b*d 1583 mm 1559 mm
check ------ Asneed < Asmax ok not ok
2 2
Asused =max(Asneed ,Asmin ) 513 mm 1912 mm
Flexural reinforcement used 4D13 10D16
Flexural reinforcement spacing 301 mm 100 mm
Used D13 -150 D16-100
Shear Reinforcement Calculation:
Vc=f*(fc')*b*d/6 53.41 kN 52.61 kN
Vs=(Vu-Vc)/f 317.09 kN 318.22 kN
Vsmax=2*(fc')*b*d/3 305.20 kN 300.64 kN
check -------Vc>Vu
Av=max(b*s/3*fy,Vs*s/fy*d) 1126.82 mm 2 1148.00 mm 2
Shear Reinforcement used: D13-113/150 D13-113/150
D13-150/150 D13-150/150
ϕ * Mn 1.2 Mcr
53.05312 5.65758
OK
13
REPORT STRUCTURE
CALCULATION OF BOX CULVERT KM 8
Reinforcement Data:
fy Es es dbtump dblap dv cover space
MPa MPa mm/mm mm mm mm mm mm
420 200000 0.0021 16 13 13 50 150
Neg Pos
Flexural Reinforcement Calculation:
c b=e c*Es*d/(e c*Es)+fy 76 mm 77 mm
amax =0.75*b1*c b 48 mm 49 mm
2
a=d-(d -(2*Mu/0.85*fc'*f*b)) 13.58 mm 8.92 mm
2 2
Asneed =Mu/f*fy*(d-a/2) 570 mm 375 mm
2 2
Asmin =1.4/fy *b*d 430 mm 435 mm
2 2
Asmax =0.75*(0.85*b1*fc'/fy)*(600/600+fy)*b*d 2031 mm 2055 mm
check ------ Asneed < Asmax ok ok
2 2
Asused =max(Asneed ,Asmin ) 570 mm 435 mm
Flexural reinforcement used 3D16 4D13
Flexural reinforcement spacing 429 mm 287 mm
D13-150 D13-150
Shear Reinforcement Calculation:
Vc=f*(fc')*b*d/6 68.56 kN 69.35 kN
Vs=(Vu-Vc)/f 58.38 kN 57.24 kN
Vsmax=2*(fc')*b*d/3 391.75 kN 396.30 kN
check -------Vc>Vu
Av=max(b*s/3*fy,Vs*s/fy*d) 161.62 mm 2 156.65 mm 2
Shear Reinforcement used: D13-858/150 D13-861/150
D13-150/150 D13-150/150
14
REPORT STRUCTURE
CALCULATION OF BOX CULVERT KM 8
ϕ * Mn 1.2 Mcr
19.57324 10.0579
OK
7.2.2 Option 2
BOTTOM SLAB REINFORCEMENT CALCULATION
Concrete Data:
K fc' Ec ec
b1 f flexural f shear
kg/cm2 MPa kN/m2 mm/mm
250 21 21409519 0.003 0.85 0.90 0.70
Reinforcement Data:
fy Es es dbtump dblap dv cover space
MPa MPa mm/mm mm mm mm mm mm
420 200000 0.0021 16 13 13 50 150
Neg Pos
Flexural Reinforcement Calculation:
c b=e c*Es*d/(e c*Es)+fy 46 mm 47 mm
amax =0.75*b1*c b 30 mm 30 mm
2
a=d-(d -(2*Mu/0.85*fc'*f*b)) 24.94 mm 15.45 mm
2 2
15
Asneed =Mu/f*fy*(d-a/2) 1047 mm 649 mm
2 2
Asmin =1.4/fy *b*d 263 mm 268 mm
2 2
Inner Force Data & Section Dimensions:
Direction Mu (kNm) Vu (kN) bflexural (mm) bshear (mm) h (mm) d(mm)
Neg 26 109 1000 1000 150 79
REPORT STRUCTURE
Pos 18 109 1000 1000 CALCULATION
150 OF 81
BOX CULVERT KM 8
Neg Pos
Flexural Reinforcement Calculation:
c b=e c*Es*d/(e c*Es)+fy 46 mm 47 mm
amax =0.75*b1*c b 30 mm 30 mm
2
a=d-(d -(2*Mu/0.85*fc'*f*b)) 24.94 mm 15.45 mm
2 2
Asneed =Mu/f*fy*(d-a/2) 1047 mm 649 mm
2 2
Asmin =1.4/fy *b*d 263 mm 268 mm
2 2
Asmax =0.75*(0.85*b1*fc'/fy)*(600/600+fy)*b*d 1244 mm 1268 mm
check ------ Asneed < Asmax ok ok
2 2
Asused =max(Asneed ,Asmin ) 1047 mm 649 mm
Flexural reinforcement used 6D16 5D13
Flexural reinforcement spacing 172 mm 216 mm
D13-150 D13-150
Shear Reinforcement Calculation:
Vc=f*(fc')*b*d/6 41.98 kN 42.78 kN
Vs=(Vu-Vc)/f 96.34 kN 95.20 kN
Vsmax=2*(fc')*b*d/3 239.91 kN 244.46 kN
check -------Vc>Vu
Av=max(b*s/3*fy,Vs*s/fy*d) 435.52 mm 2 422.35 mm 2
Shear Reinforcement used: D13-286/150 D13-287/150
D13-150/150 D13-150/150
ϕ * Mn 1.2 Mcr
16.85833 5.65758
OK
16
REPORT STRUCTURE
CALCULATION OF BOX CULVERT KM 8
7.3 Wall
WALL REINFORCEMENT CALCULATION
Concrete Data:
K fc' Ec ec
b1 f flexural f shear
kg/cm2 MPa kN/m2 mm/mm
250 21 21409519 0.003 0.85 0.90 0.70
Reinforcement Data:
fy Es es dbtump dblap dv cover space
MPa MPa mm/mm mm mm mm mm mm
420 200000 0.0021 13 13 13 30 150
Neg Pos
Flexural Reinforcement Calculation:
c b=e c*Es*d/(e c*Es)+fy 89 mm 89 mm
amax =0.75*b1*c b 56 mm 56 mm
2
a=d-(d -(2*Mu/0.85*fc'*f*b)) 13.45 mm 13.45 mm
2 2
Asneed =Mu/f*fy*(d-a/2) 565 mm 565 mm
2 2
Asmin =1.4/fy *b*d 502 mm 502 mm
2 2
Asmax =0.75*(0.85*b1*fc'/fy)*(600/600+fy)*b*d 2370 mm 2370 mm
check ------ Asneed < Asmax ok ok
2 2
Asused =max(Asneed ,Asmin ) 565 mm 565 mm
Flexural reinforcement used 5D13 5D13
Flexural reinforcement spacing 226 mm 226 mm
D13-150 D13-150
Shear Reinforcement Calculation:
Vc=f*(fc')*b*d/6 79.98 kN 79.98 kN
Vs=(Vu-Vc)/f 130.50 kN 130.50 kN
Vsmax=2*(fc')*b*d/3 457.04 kN 457.04 kN
check -------Vc>Vu
Av=max(b*s/3*fy,Vs*s/fy*d) 309.68 mm 2 309.68 mm 2
Shear Reinforcement used: D13-451/150 D13-451/150
D13-150/150 D13-150/150
17
REPORT STRUCTURE
CALCULATION OF BOX CULVERT KM 8
ϕ * Mn 1.2 Mcr
28.985 10.0579
OK
18
REPORT STRUCTURE
CALCULATION OF BOX CULVERT KM 8