RUMAH G2 STAFF 3 LANTAI

G2.3LT/STOF/CIV/III/2024/SU/0

NO. NO. GAMBAR JUDUL GAMBAR NO. NO. GAMBAR JUDUL GAMBAR

01 ARS-01 DENAH LANTAI - 1 28 ARS-28 DETAIL KUDA - KUDA (K2) & (K3)

02 ARS-02 DENAH LANTAI - 2 29 ARS-29 GABLE - TEMBOK LAYER

03 ARS-03 DENAH LANTAI - 3 30 ARS-30 DENAH TANGGA

04 ARS-04 TAMPAK DEPAN 31 ARS-31 DENAH TANGGA


E:\DATA A\Gambar Terakhir 2015\GAMBAR FINAL\Gambar Final CIVIL Engineering\KUMPULAN GAMBAR CAD\RUMAH 62 2 LANTAI\3D 08 12 2022\09 12 22\Enscape_2022-12-09-11-27-49.jpg

05 ARS-05 TAMPAK SAMPING 32 ARS-32 POTONGAN TANGGA

06 ARS-06 TAMPAK BELAKANG 33 ARS-33 DETAIL RAILLING PAGAR

07 ARS-07 POTONGAN 34 ARS-34 DENAH DAPUR & POTONGAN LANTAI - 1

08 ARS-08 POTONGAN 35 ARS-35 DENAH DAPUR & POTONGAN LANTAI - 2

09 ARS-09 POTONGAN 36 ARS-36 DENAH DAPUR & POTONGAN LANTAI - 3

10 ARS-10 POTONGAN 37 ARS-37 DENAH PEMASANGAN KERAMIK LT - 1

11 ARS-11 POTONGAN 38 ARS-38 DENAH PEMASANGAN KERAMIK LT - 2

12 ARS-12 POTONGAN 39 ARS-39 DENAH PEMASANGAN KERAMIK LT - 3


SUMBER TANI AGUNG RESOURCES Tbk
13 ARS-13 DENAH PONDASI & KOLOM 40 ARS-40 DENAH & POTONGAN KM/WC LANTAI - 1
2024
14 ARS-14 DETAIL PONDASI 41 ARS-41 DENAH & POTONGAN KM/WC LANTAI - 2 Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES
15 ARS-15 DETAIL SLOOP, KOLOM & BALOK 42 ARS-42 DENAH & POTONGAN KM/WC LANTAI -3
NOTE:
16 ARS-16 DENAH PEMBALOKAN LANTAI - 2 43 ARS-43 DENAH PLAFOND LANTAI - 1
Semua gambar desain dan keterangan yang tercantum merupakan hak
17 ARS-17 DENAH PEMBALOKAN LANTAI - 3 44 ARS-44 DENAH PLAFOND LANTAI - 2 milik PT. STA Group, dan tidak boleh digunakan untuk kepentingan lain
tanpa Izin tertulis dari manajemen PT. STA Group.
18 ARS-18 DENAH PEMBALOKAN LANTAI - ATAP 45 ARS-45 DENAH PLAFOND LANTAI - 3
Setiap halaman dalam berkas ini merupakan satu kesatuan dan tidak
19 ARS-19 DENAH PERLETAKAN PINTU /JENDELA-1 46 ARS-46 DENAH INSTALASI LISTRIK LANTAI - 1
boleh digunakan secara terpisah.
20 ARS-20 DENAH PERLETAKAN PINTU /JENDELA-2 47 ARS-47 DENAH INSTALASI LISTRIK LANTAI - 2
Semua notasi dimensi menggunakan satuan centimeter (cm) kecuali
21 ARS-21 DENAH PERLETAKAN PINTU /JENDELA-3 48 ARS-48 DENAH INSTALASI LISTRIK LANTAI - 3 disebutkan lain.

22 ARS-22 DETAIL PINTU 49 ARS-49 DENAH INSTALASI PLUMBING LANTAI - 1 Dimensi pada gambar adalah mutlak dan sesuai dengan yang tertera.
Dilarang mengukur gambar secara manual.
23 ARS-23 DETAIL JENDELA 50 ARS-50 DENAH INSTALASI PLUMBING LANTAI - 2
Semua gambar harus diperiksa terlebih dahulu di lapangan dan
24 ARS-24 DETAIL JERJAK 51 ARS-51 DENAH INSTALASI PLUMBING LANTAI - 3
diverifikasi sebelum memulai pelaksanaan
25 ARS-25 DETAIL JENDELA 52 ARS-52 DETAIL SEPTICTANK & RESAPAN

26 ARS-26 DENAH KAP ATAP

27 ARS-27 DETAIL KUDA - KUDA (K1)


4 5 6 6 7 8

1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20

FFL -0.10
100 0.60 0.60 100
F F
Bordes
1.50 R.Cuci R.Jemur 10 R.Jemur R.Cuci 1.50
FFL -0.10 FFL -0.05 FFL -0.05 FFL -0.10
FFL +1.80

E E
Dapur Dapur
3 KM/WC FFL 11 9 FFL
KM/WC 3
1.50 1 ±0.00 ±0.00 1 1.50
12 8
FFL -0.05 FFL -0.05
13 7
Kamar Tidur Utama Kamar Tidur Utama
D' FFL ±0.00
14 6 FFL ±0.00 D'
15 5
3.30 3.30
4
1.80 FFL -0.10
KM/WC 2 3 KM/WC 2 1.80
FFL -0.05 FFL -0.05 FFL -0.10
R. Makan 2 R. Makan
FFL ±0.00 FFL ±0.00
1
D D
2 2
1.20 1.20
NK
C' C'
R. R.
3.70 Keluarga Keluarga 3.70
FFL ±0.00 FFL ±0.00

2.50 Kamar Tidur 3 Kamar Tidur 3 2.50


1 FFL ±0.00 FFL ±0.00 1
Kamar Tidur 2 Kamar Tidur 2
FFL ±0.00 FFL ±0.00
FFL ±0.00

C C
1.50 FFL -0.10 FFL -0.05 FFL -0.05 FFL -0.10 1.50

B B
0.50 FFL -0.10 0.50
A A
FFL -0.05

4 5 6 6 7 8

MT. -0.25 MT. -0.25

3.00 3.00 3.50 3.50 3.50 3.00 3.00

1 2 2' 3 4 5 6 6' 7 8

DENAH LANTAI - 1

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk Number Date
DENAH LANTAI - 1
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-01 52
4 5 7 7 8 9

1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20

F F
Bordes
1.50 R.Cuci R.Jemur 10 R.Jemur R.Cuci 1.50
FFL +3.50 FFL +3.50
FFL +1.80

E E
Dapur Dapur
3 KM/WC FFL +3.55 11 9 FFL +3.55
KM/WC 1 3
1.50 1 8 FFL +3.50 1.50
12
FFL -3.50
13 7
Kamar Tidur Utama Kamar Tidur Utama
D' 14 6 FFL +3.55 D'
FFL +3.55
15 5
3.30 3.30
16
1.80 KM/WC 2 17 KM/WC 2 1.80
FFL -3.50 FFL +3.50
R. Makan 18 R. Makan
FFL +3.55 FFL +3.55
19
D 20 D
10.00
2 2
1.20 1.20
Trn
C' 25 C'
R. R.
3.70 Keluarga Keluarga 3.70
FFL +3.55
FFL +3.55
Kamar Tidur 3 Kamar Tidur 3
1 2.50 FFL +3.53 FFL +3.55
2.50 1
Kamar Tidur 2 FFL +3.55 Kamar Tidur 2
FFL +3.55
FFL +3.55

C C
FFL +3.50
1.50 FFL -0.05 1.50
FFL +3.50
0.60
B B
0.50 0.10 0.10 0.50
A 1.00 A
0.40
0.15 0.15 1.85 0.15 0.15
0.60 0.60

4 5 6 7 8 9

3.00 3.00 3.50 3.50 3.50 3.00 3.00

1 2 2' 3 4 5 6 6' 7 8

DENAH LANTAI - 2

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH LANTAI - 2 Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-02 52
4 5 6 7 8

1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20

F F
Bordes
1.50 R.Cuci R.Jemur 10 R.Jemur R.Cuci 1.50
FFL +3.50 FFL +3.50
FFL +1.80
E E
Dapur Dapur
3 KM/WC FFL +3.55 9 FFL +3.55
KM/WC 1 3
11
1.50 1 FFL +3.50 1.50
12 8
FFL -3.50
13 7
Kamar Tidur Utama Kamar Tidur Utama
D' 14 6 FFL +3.55 D'
FFL +3.55
15 5
3.30 3.30
16
1.80 KM/WC 2 17
KM/WC 2 1.80
FFL -3.50 FFL +3.50
R. Makan 18 R. Makan
FFL +3.55 FFL +3.55
19
D 20 D
2 2
1.20 1.20
Trn
C' 25 C'
R. R.
3.70 Keluarga Keluarga 3.70
FFL +3.55
FFL +3.55
Kamar Tidur 3 Kamar Tidur 3
1 2.50 FFL +3.53 FFL +3.55
2.50 1
Kamar Tidur 2 FFL +3.55 Kamar Tidur 2
FFL +3.55
FFL +3.55

C C
FFL +3.50
1.50 FFL -0.05 1.50
FFL +3.50
0.60
B B
0.50 0.10 0.10 0.50
A 1.00 A
0.40
0.15 0.15 1.85 0.15 0.15
0.60 0.60

4 5 6 7 8

3.00 3.00 3.50 3.50 3.50 3.00 3.00

1 2 2' 3 4 5 6 6' 7 8

DENAH LANTAI - 3

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH LANTAI - 3 Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-03 52
TAMPAK DEPAN

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk Number Date
TAMPAK DEPAN
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-04 52
TAMPAK SAMPING KIRI TAMPAK SAMPING KANAN

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk TAMPAK SAMPING
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-05 52
KACA
GLASS BLOCK

KACA
GLASS BLOCK

TAMPAK BELAKANG

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk TAMPAK BELAKANG
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-06 52
- 11.00

4.00

FFL +7.05
- 7.00

3.50

FFL +3.55 FFL +3.55


- 3.50

3.50

-0.10 ±0.00 ±0.00 ±0.00 -0.10 ± 0.00


-0.25 -0.25 0.25

1.00 3.00 3.00 3.50 3.50 3.50 3.00 3.00 1.00

1 2 3 4 5 6 7 8

POTONGAN 1 - 1

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk Number Date
POTONGAN 1 - 1
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-07 52
1.39 1.39

- 11.00

0.61
0.61
0.40 1.33 0.40
KACA GLASS
BLOCK 4.00

0.05
0.78
FFL +7.05 0.05 +7.00
- 7.00

3.50

FFL +3.55
- 3.50

3.50

-0.10 ±0.00 -0.10 ± 0.00


-0.25
0.25

1.00 3.00 3.00 3.50 3.50 3.50 3.00 3.00 1.00

1 2 3 4 5 6 7 8

POTONGAN 2 - 2

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk Number Date
POTONGAN 1 - 1
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-08 52
- 11.00

4.00

FFL +7.05
- 7.00

3.50

FFL +3.55 FFL +3.50 FFL +3.50 FFL +3.55


- 3.50

3.50

-0.10 ±0.00 FFL -0.05 FFL -0.05 ±0.00 -0.10 ± 0.00


-0.25 -0.25
0.25

1.00 3.00 3.00 3.50 3.50 3.50 3.00 3.00 1.00

8 7 6 5 4 3 2 1

POTONGAN 3 - 3

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk POTONGAN 1 - 1
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-09 52
- 11.00
0.50
0.85
0.35 1.00 0.35
0.15 0.30 0.15

4.00 4.00
3.00 3.00

0.80

FFL +7.05 0.50 FFL +7.05


- 7.00 0.15
0.50 0.35 0.35
0.15 0.30

3.50 3.50 3.35


3.00

1.04
0.85
FFL +3.55 FFL +3.55 0.10
- 3.50 0.10 0.15
0.35
0.25 0.50

3.50 3.50 0.50


2.85

± 0.00 -0.10 -0.05 ±0.00 ±0.00 -0.10 ±0.00


0.25 -0.25 -0.25 0.05
0.20

1.00 1.50 3.30 3.70 1.50


1.00 1.50 1.50 1.80 1.20 2.50 2.00
F E D C B
F E D' D C' C A

POTONGAN 4 - 4 POTONGAN 5 - 5

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk POTONGAN 2 - 2
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-10 52
- 11.00 - 11.00

1.00 1.00

4.00 4.00
- Keramik dinding & meja dapur - Keramik dinding & meja dapur
Homogenous 60 x 60 cm Homogenous 60 x 60 cm

Cor Beton K175 Cor Beton K175


Ø8-150 Ø8-150
mm +0.80 mm +0.80

+0.60 +0.60

Keramik dinding Homogenous Keramik dinding Homogenous


- 60 x 60 cm - 60 x 60 cm

FFL +7.05 FFL +7.05 FFL +7.05 FFL +7.05


- 7.00 - 7.00

3.50 - Keramik dinding & meja dapur


Homogenous 60 x 60 cm 3.50 - Keramik dinding & meja dapur
Homogenous 60 x 60 cm

Cor Beton K175 Cor Beton K175


Ø8-150 Ø8-150
mm +0.80 mm +0.80

+0.60 +0.60

Keramik dinding Homogenous


0.60 Keramik dinding Homogenous
0.60
- 60 x 60 cm - 60 x 60 cm

FFL +3.55 FFL +3.55 FFL +3.55 FFL +3.55


- 3.50 - 3.50

BALOK BERGESER DARI AS SEBANYAK 7.5 CM BALOK BERGESER DARI AS SEBANYAK 7.5 CM
(PENEMPATAN KOSEN JENDELA) (PENEMPATAN KOSEN JENDELA)

3.50 - Keramik dinding & meja dapur


Homogenous 60 x 60 cm 3.50 - Keramik dinding & meja dapur
Homogenous 60 x 60 cm

Cor Beton K175 Cor Beton K175


Ø8-150 Ø8-150
mm +0.80 mm +0.80

+0.60 +0.60

Keramik dinding Homogenous Keramik dinding Homogenous


- 60 x 60 cm - 60 x 60 cm

± 0.00 -0.10 ±0.00 ±0.00 ± 0.00 -0.10 ±0.00 ±0.00


-0.25 -0.25 -0.25 -0.25

3.00 7.00 3.00 7.00

F D' B F D' B

POTONGAN 6 - 6 POTONGAN 6 - 6

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk POTONGAN 3 - 3
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-11 52
- 11.00 - 11.00

1.00 1.00

4.00 4.00 0.50


0.65

0.40
20 FFL +7.05 20 FFL +7.05
- 7.00 19 - 7.00 19
18 18

16
17
0.25 16
17
0.15
15 15
14 14
13 13
12 12

10
11
10
11
0.50
3.50 9 3.50 9
8 0.65 8
7
6
7
6
3.25
5 5
4 4
3 3
2
1
0.90 0.40 2
1
20 FFL +3.55 20 FFL +3.55
- 3.50 19 - 3.50 19
18 18
17 17 0.15
16 16
15 1.00 15 1.00
14 14
13 13
12 12
11 11
10 10
3.50 9 3.50
8 8
7 7
6 6
5 5
4 4
3 3
2 2
1 1

± 0.00 -0.10 ±0.00 ±0.00 -0.05 ± 0.00 -0.10 ±0.00 ±0.00


-0.25 -0.25 -0.25 -0.25

10.50 10.50

F A F A

POTONGAN 8 - 8 POTONGAN 9 - 9

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk POTONGAN 4 - 4
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-12 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80
3 3.50 3.50 1.80 4.20
1.50

F F
K1 25x30 K2 25x30 K2 25x30 K3 25x30
Bordes K3 25x30 K2 25x30 K2 25x30 K1
1.50 10 1.50

E E
K2 25x30 K2 25x30 K2 K2 K2 K2 25x30 25x30 K1
K2

17X22
11 9
1.50 1.50
12
2 8

25x30

25x30
13

25x30

25x30
7
D' 14 6 D'
17X22 17X22 15 17x22 17x22
1 5

17X22
17X22
3.30 3.30

25x30

25x30
25x30
4
1.80 3 1.80
2
1
D D
K2 25x30 K2 25x30 K1 K2 25x30 K2 K1 25x30 K2 25x30 K2
1.20 1.20
NK
C' C'
17x22 17x22
25x30

3.70 3.70

25x30

25x30

25x30

25x30

25x30

25x30

25x30
2.50 2.50

25x30 25x30
K2 25x30
K2
25x30 25x30 25x30
C C
K1 25x30

25x30
K2 K1 K1 K2 K1

25x30
25x30

25x30

25x30

25x30
25x30
25x30

1.50 FFL -0.05 FFL -0.05 1.50


25x30
25x30 K1 K1 25x30
B 25x30
3 25x30 25x30
B
0.50 K2 0.70 K2 K2 K2 25x30 K2 0.50
A A
25x30

1.50

3.00 3.00 3.50 3.50 3.50 3.00 3.00

1 2 2' 3 4 5 6 6' 7 8

DENAH PONDASI & KOLOM

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH PONDASI & KOLOM
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-13 52
25

Sloof 25x30
15

D16-150 mm

D16-150 mm

D16-150 mm
2 2 - 0.05
50 25 70

D16-150 mm
50 13
2 2
50
56 30 Jembatan

17 30 17 83
50
DETAIL PONDASI - 1 13

1.50
DETAIL PONDASI - 2 UMPAK - 0.25

15 Lantai Homogeneus tile


60x60 Lantai Homogeneus tile
Beton K100 60x60
Plint Lantai t = 10 cm Beton K100
Pasir
urug Pasir
DETAIL 3 - JEMBATAN
Tanah urug
100 urug Tanah
±0.00 ±0.00 urug
3 3 -0.05
10 -0.10 5 5
3 3
25 25 20
-0.25 15 14 14

Sloof 23x30 cm 22
30 30
45
Pedestal
25x25 cm
15
D16-150 mm
15 30 17 50
100
Beton K175 Beton K100 t = 5 cm Jembatan panjang 1 m
Pasir Urug t = 3 cm
50 Beton K175
D16-150 mm 3 Pasir urug t = 3 cm Tanah Urug Ø10-200 mm t = 7 cm
5 50 5
60 - 0.05
5
13
5 50 5 20
60 POTONGAN 2 - 2 7 -0.25

30

Mini Pile 25x25 - 0.55


Kedalaman 4.00 m 5
13 30 13
56
Beton K100

POTONGAN 1 - 1
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DETAIL PONDASI
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-14 52
KOLOM PRAKTIS KOLOM KANOPY
60 15
90
4Ø10 8D16 4Ø10 4Ø10
15 Ø10-125 Ø10-125
Ø8-110 15
15 Ø8-150 8D16
12D16 15 15 65 15 50
60 16D16
60 65 Ø8-110
15 15 15 15 15
70 45
Ø8-110 Ø8-110
80 65

15 45 Ø8-150 Ø8-150
15 4Ø10 4Ø10

15 x 15 K1 K2 K3 K4

RING BALOK &


SUMBU SLOOF BALOK (B1) BALOK (B2)
RING BALOK HANDRAIL /PAGAR
& BALOK DIATAS
3D16 2D16
JENDELA DAN PINTU(LINTEL/LATEI)
4D16 4D16 4D16 4D16

25 Ø10-150 30 Ø10-150 Ø10-125 Ø10-150 Ø10-125 Ø10-150 4Ø10


40 40 35 35
2D16 3D16 Ø8-150
15
25
25
15
20 20
25 25

TUMPUAN LAPANGAN TUMPUAN LAPANGAN PANJANG SESUAI JENDELA/PINTU


25 x 25 25 x 30 DITAMBAH KIRI DAN KANAN 60 CM
25 x 40 25 x 40 20 x 35 20 x 35
BALOK PRAKTIS (B6)
BALOK (B3) BALOK (B4) BALOK (B5) BALOK (B7)
/ TANGGA
3D16 2D16
15 15 15 15
3D16 2D16 3D16 3D16
Ø8-110 Ø8-110 4D13 4D13
Ø10-100 Ø10-100
40 40 Ø10-125 Ø10-125
2D16 3D16 2D13 2D13 20 20
50 50 Ø8-150 Ø8-150
65 65 2D13 2D13 50 50
65 65
Ø8-110 Ø8-110 15 15
15 15
25 Ø10-100 25 Ø10-100
2D16 2D16 2D16 2D16
15 10 15 10
25 25
TUMPUAN LAPANGAN TUMPUAN LAPANGAN TUMPUAN LAPANGAN
15 x 20 15 x 20
25 x 40+25 25 x 40+25 15 x 65 15 x 65 15 x 50 15 x 50

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DETAIL PONDASI, SLOOF, KOLOM, BALOK ,
Number Date
2024 KOLOM PRAKTIS & SUMBU
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-15 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50

0.45 4.20 1.80 3.50 3.50 1.80 4.20

K2 K2 K3 K3 K2 K2 K1
F K1 F
B3 B3 B1 B1 B1 B3 B3

25x40

25x40

25x40

25x40

25x40

25x40

25x40

25x40
B1

B1

B1

B1

B1

B1

B1

B1
1.50 25X40+25 25X40+25 25X40 25X40 25X40 25X40+25 25X40+25 1.50

0.20
E K2 KP K2 E
B1 K2 B1 B1 K2 B1 K2 B1 K2

15x20

B1 15x20
K2 K2

B6 25x40 B6

B6
1.50 25X40 25X40 25X40 25X40 25X40 1.50
KP

25x40

25x40

25x40

25x40

25x40

25x40

25x40
KP
D' KP D'

B1

B1

B1

B1

B1

B1

B1
KP
B6 KP B6 KP
3.30 KP KP 3.30
15x20 15x20

15x20

15x20
B6
1.80 1.80

KP KP
D K2
D
K2 B1 B1 K1 B1 K2 B3 K2 B1 K1 B1 K2 B1
K2
1.20 25X40 25X40 25X40 25X40+25 25X40 25X40 25X40 1.20

C' KP KP
KP KP C'
25x40

25x40

25x40

25x40

25x40

25x40

25x40

25x40
B1

B1

B1

B1

B1

B1

B1

B1
3.70 3.70

2.50 2.50
B1 B1 B1 B1 B1 B1 B1
K1 25X40 K2 25X40 K1 25X40 K2 25X40 K2 25X40 K1 25X40 K2 25X40
K1
C C
25x40

25x40

25x40

25x40

25x40

25x40

25x40

25x40
B1

B1

B1

B1

B1

B1

B1

B1
1.50 B3 B3 1.50
B3 B3
25X40+25 25X40+25
25X40+25 25X40+25
B4 0.70 B1 B4
B 15X65
0.075
K1 25X40
0.075
15X65 B
0.50 K2 K4 0.65 K2 0.50 K1 K2 K4 K2 0.50
A A
0.50 KP KP 0.50
1.00

BALOK BERGESER DARI AS


SEBANYAK 7.5 CM
(PENEMPATAN KOSEN JENDELA)

3.00 3.00 3.50 3.50 3.50 3.00 3.00

1 2 2' 3 4 5 6 6' 7 8

DENAH KOLOM & PEMBALOKKAN LANTAI - 2 12

WIRE MESH M6 - 150 2 LAPIS

DETAIL PENULANGAN PLAT LANTAI - 2

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH PEMBALOKKAN Number Date
2024 LANTAI - 2
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-16 52
1 2 3 4 5 6 7 8
9.50 3.50 9.50
3.00 3.00 3.50 3.50 3.00 3.00

F F
B2 B2 B2 B2 B2 B2 B2

20x35

20x35

20x35

20x35

20x35

20x35

20x35

20x35

20x35

20x35
20x35 20x35 20x35 20x35 20x35 20x35 20x35

B2

B2

B2

B2

B2

B2

B2

B2

B2

B2
1.50 1.50

E KP E
B2 B2 B2 B2 B2 B2 KP B2

15x20

15x20
B6

B6

20x35
1.50 20x35 20x35 20x35 20x35 20x35 20x35 20x35 1.50

B2
KP KP
D' D'

20x35

B6 20x35

20x35

20x35

20x35

20x35

20x35
KP KP
KP

B2

B2

B2

B2

B2

B2

B2
B6 B6 KP
3.30 KP 3.30
15x20 15x20

15x20

15x20
B6
1.80 1.80

KP KP
D D
B2 B2 B2 B2 B2 B2 B2
1.20 1.20

20x35
20x35 20x35 20x35 20x35 20x35 20x35 20x35

B2
C' KP KP
KP
KP
C'
20x35

20x35

20x35

20x35

20x35

20x35

20x35
B2

B2

B2

B2

B2

B2

B2
3.70 3.70

2.50 2.50
B2 B2 B2 B2 B2 B2 B2

20x35
20x35 20x35 20x35 20x35 20x35 20x35 20x35

B2
C C
20x35

20x35

20x35

20x35

20x35

20x35

20x35
B2

B2

B2

B2

B2

B2

B2
1.50 B2 3.70 B2 1.50
B5 B5
15x50 20x35 20x35 15x50
B5 B2 B5
B 15x50 20x35 15x50
B
0.50 0.40 0.50
A KP KP A
0.50 0.40 KP KP
0.25
0.60 1.85 0.60
3.65

3.00 3.00 3.50 3.50 3.50 3.00 3.00

1 2 2' 3 4 5 6 7 8

DENAH PEMBALOKKAN LANTAI - 3 12

WIRE MESH M6 - 150 2 LAPIS

DETAIL PENULANGAN PLAT LANTAI - 3

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH PEMBALOKKAN Number Date
2024 LANTAI - DAK
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-17 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20

F F
B7 B7 B7 B7 B7 B7 B7

15x20

15x20

15x20

15x20

15x20

15x20

15x20

15x20
15x20 15x20 15x20 15x20 15x20 15x20 15x20

B7

B7

B7

B7

B7

B7

B7

B7
1.50 1.50

E E
B7 B7 B7 B7 B7 B7 B7
15x20 15x20 15x20 15x20 15x20 15x20 15x20
1.50 1.50

D' D'

15x20

15x20

15x20

15x20

15x20

15x20

15x20

15x20
B7

B7

B7

B7

B7

B7

B7

B7
3.30 3.30
1.80 1.80

10.00
D D
B7 B7 B7 B7 B7 B7 B7
1.20 15x20 15x20 15x20 15x20 15x20 15x20 15x20 1.20

C' C'
15x20

15x20

15x20

15x20

15x20

15x20

15x20

15x20
3.70 3.70
B7

B7

B7

B7

B7

B7

B7

B7
2.50 2.50

C C
B7 B7 B7 B7 B7 B7 B7
15x20

15x20

15x20

15x20

15x20

15x20

15x20

15x20
15x20 15x20 15x20 15x20 15x20 15x20 15x20
1.50 1.50
B7

B7

B7

B7

B7

B7

B7

B7
FFL -0.05

B B
0.50 B7 B7 B7 B7 0.50
A 15x20 15x20 15x20 15x20 A
B7 B7 B7
15x20 15x20 15x20

3.00 3.00 3.50 3.50 3.50 3.00 3.00

1 2 2' 3 4 5 6 6' 7 8

DENAH PEMBALOKKAN ATAP

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH PERLETAKKAN PINTU & JENDELA Number Date
2024 LANTAI - 2
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-18 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20

J2 J2

F F
P2 Bordes P2
1.50 R.Cuci R.Jemur 10 R.Jemur R.Cuci 1.50
J2 V1 V1 J2

E E
KM/WC Dapur Dapur
FFL 11 9 FFL
KM/WC
1.50 1 ±0.00 ±0.00 1 1.50
P4 12 8 P4
V2 V2
13 7
Kamar Tidur Utama Kamar Tidur Utama
D' FFL ±0.00
14 6 FFL ±0.00 D'
15 5
3.30 3.30
4
1.80 KM/WC 2 3
KM/WC 2 1.80
FFL -0.05 FFL -0.05
R. Makan 2 R. Makan
FFL ±0.00 FFL ±0.00
1
D P3 P3
D
P4 P4
P3 P3
1.20 1.20 1.20
P3 P3
NK
C' C'
R. R.
3.70 Keluarga Keluarga 3.70
FFL ±0.00 FFL ±0.00
Kamar Tidur 3 Kamar Tidur 3
2.50 FFL ±0.00 FFL ±0.00
2.50
Kamar Tidur 2 Kamar Tidur 2
FFL ±0.00 FFL ±0.00

C C
J1 J1 J1 J1

1.50 FFL -0.05 P1 P1 FFL -0.05 1.50


J4 J4

B B
0.50 0.50
A A
P5

3.00 3.00 3.50 3.50 3.50 3.00 3.00

1 2 2' 3 4 5 6 6' 7 8

DENAH PERLETAKKAN PINTU & JENDELA


LANTAI - 1

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH PERLETAKKAN PINTU & JENDELA Number Date
2024 LANTAI - 1
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-19 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20
J2 J3 J2

F F
P2 Bordes P2
1.50 R.Cuci R.Jemur 10 R.Jemur R.Cuci 1.50
J2 V1 V1 J2

E E
Dapur Dapur
KM/WC FFL FFL
KM/WC
11 9
1.50 1 ±0.00
8
±0.00 1 1.50
P4 12 P4
V2-0.05
FFL V2
13 7
Kamar Tidur Utama Kamar Tidur Utama
D' FFL ±0.00
14 6 FFL ±0.00 D'
15
3.30 3.30
16
1.80 KM/WC 2 17
KM/WC 2 1.80
FFL -0.05 FFL -0.05
R. Makan 18 R. Makan
FFL ±0.00 FFL ±0.00
19
D P3
20
P3
D
P4 P4
P3 P3
1.20 1.20
P3 P3
Trn
C' 25 C'
R. R.
3.70 Keluarga Keluarga 3.70
FFL ±0.00 FFL ±0.00
Kamar Tidur 3 Kamar Tidur 3
2.50 FFL ±0.00 FFL ±0.00
2.50
Kamar Tidur 2 Kamar Tidur 2
FFL ±0.00 FFL ±0.00

C C
J1 J1 J1 J1

1.50 P1 P1 FFL -0.05 1.50


J4 J4

B J5 J5 B
0.50 0.50
A A

3.00 3.00 3.50 3.50 3.50 3.00 3.00

1 2 2' 3 4 5 6 6' 7 8

DENAH PERLETAKKAN PINTU & JENDELA


LANTAI - 2

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH PERLETAKKAN PINTU & JENDELA Number Date
2024 LANTAI - 2
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-20 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20
J2 J3 J2

F F
P2 Bordes P2
1.50 R.Cuci R.Jemur 10 R.Jemur R.Cuci 1.50
J2 V1 V1 J2

E E
Dapur Dapur
KM/WC FFL 11 9 FFL
KM/WC
1.50 1 ±0.00 ±0.00 1 1.50
P4 12 8 P4
V2-0.05
FFL V2
13 7
Kamar Tidur Utama Kamar Tidur Utama
D' FFL ±0.00
14 6 FFL ±0.00 D'
15
3.30 3.30
16
1.80 KM/WC 2 17
KM/WC 2 1.80
FFL -0.05 FFL -0.05
R. Makan 18 R. Makan
FFL ±0.00 FFL ±0.00
19
D P3
20
P3
D
P4 P4
P3 P3
1.20 1.20
P3 P3
Trn
C' 25 C'
R. R.
3.70 Keluarga Keluarga 3.70
FFL ±0.00 FFL ±0.00
Kamar Tidur 3 Kamar Tidur 3
2.50 FFL ±0.00 FFL ±0.00
2.50
Kamar Tidur 2 Kamar Tidur 2
FFL ±0.00 FFL ±0.00

C C
J1 J1 J1 J1

1.50 P1 P1 FFL -0.05 1.50


J4 J4

B J5 J5 B
0.50 0.50
A A

3.00 3.00 3.50 3.50 3.50 3.00 3.00

1 2 2' 3 4 5 6 6' 7 8

DENAH PERLETAKKAN PINTU & JENDELA


LANTAI - 3

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH PERLETAKKAN PINTU & JENDELA Number Date
2024 LANTAI - 2
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-21 52
Detail Pintu Type P1 (6 unit) Skala 1:25 Detail Pintu Type P2 (6 unit) Skala 1:25 Detail Pintu Type P3 (18 unit) Skala 1:25 Detail Pintu Type P4 (12unit) Skala 1:25
Lokasi Lokasi Lokasi Lokasi
Teras depan - R. Keluarga 4 unit Dapur - Teras belakang 4 unit Kamar tidur utama 4 unit Kamar mandi / WC 1 6 unit
Kamar tidur 2 4 unit Kamar mandi / WC 2 6 unit
Kamar tidur 3 4 unit

5 5

Kaca hitam Kaca hitam


5mm 45 5mm 45

5 5 5

265 265

Pintu
Aluminium
210 210 210

5 90 5 5 80 5 5 80 5
70

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DETAIL PINTU Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-22 52
Detail Pintu Type J1 (12 unit) Skala 1:25 Detail Pintu Type J2 (12 unit) Skala 1:25 Detail Pintu Type J3 Skala 1:25 Detail Pintu Type J5 (2 Unit) Skala 1:25
Lokasi Lokasi Lokasi Lokasi
8 unit Ruang Tangga Ruang Tangga

RELIEF

5 5
5 5

Kaca hitam Kaca hitam Kaca hitam Kaca hitam


5mm 5mm 45 5mm 5mm 45
5

20 Kaca 138
5 mm

20

Kaca hitam Kaca hitam Kaca hitam Kaca hitam 120


5mm 5mm 5mm 5mm
265 265 5 290
175

210 210 KACA GLASS


BLOCK
5 20x20

Kaca
5 mm 138

85
5

30 (2 UNIT)
ML ± 0.00 ML ± 0.00

KACA GLASS
BLOCK
5 60 5 60 5 5 60 5 60 5 20x20
5 50 5
60

(6 UNIT)

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DETAIL JENDELA Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-23 52
Detail Pintu Type V1(6 unit) Skala 1:25 Detail Pintu Type P5 (1 unit) Skala 1:25
Lokasi 60 60 60 60
Lokasi 10 40 10 10 40 10 10 40 10 10 40 10
Kamar mandi / WC 1 4 unit 1 unit 5 10 10 20 10 10 10 10 20 10 10 5 5 10 10 20 10 10 10 10 20 10 10 5
5 5
10 10

25 45 25 45
Besi Nako/Kotak
10 10
15 mm x 15 mm 5 5
Hollow 3 x 9 cm 10 10
Hollow 3 x 9 cm Besi Siku L.40.40 5
15 15 10 10
5 Relief
15 15 15
5 30
Kaca Kaca 45 55 58
5 mm 5 mm Relief 10
120
10
5
10 30
175
10
10
10
5
5 30 35 5 30 35 58 Besi Nako/Kotak
12 mm x 12 mm Besi Siku L.20.20
Hollow
3 x 9 cm 10 5
0 5 10 10 10 10 10 10 5 10 10 10 10 10 10 5
10
250255 60 60
10
210 Besi Nako/Kotak
Besi Siku L.20.20 12 mm x 12 mm
5 10 10 10 10 10 10 5 10 10 10 10 10 10 5
60 60
JERJAK JENDELA JERJAK JENDELA
Pintu Type J1 (8 unit) Pintu Type J2 (8 unit)
Plat t = 1,6 mm Plat t = 1,6 mm 40

ML ± 0.00

60 60
15 15 10 40 10 10 40 10
5 10 10 20 10 10 5 10 10 20 10 10 5
Detail Pintu Type V2 (4 unit) Skala 1:25 5 5
10 10
Lokasi 5 Relief 5
45 25 25 45
100 100
Kamar mandi / WC 2 4 unit
15 10 10
200
5 5
Besi Nako/Kotak
5 12 mm x 12 mm Besi Siku L.20.20

Kaca 55 45 55
Buram JERJAK JENDELA
5 Pintu Type V1 (4 unit)

5 70
60

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DETAIL JERJAK JENDELA Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-24 52
Detail Pintu Type J4 (2 unit) Skala 1:25
Lokasi
R..KELUARGA 1 unit

15 15
5 Relief 5 Relief
1 2

15 15 15 15
5 5

Kaca Kaca Kaca


Relief 5 mm 5 mm 5 mm 103

158

Kaca Kaca Kaca Jendela Bisa


50 dibuka
5 mm 5 mm 5 mm

5 5

Kaca Kaca Kaca


3 3
5 mm 5 mm 5 mm

158 158

5 5

Kaca Kaca Kaca


5 mm 5 mm 5 mm 103

158

Jendela Bisa
50 dibuka
4 4

5 985 5 985

Kaca Kaca Kaca


5 mm 5 mm 5 mm

158 158

5 5

103
Kaca Kaca Kaca
5 mm 5 mm 5 mm
158

Jendela Bisa
Kaca Kaca Kaca dibuka
5 mm 5 mm 5 mm 50

5 5

Kaca Kaca Kaca


5 mm 5 mm 5 mm 158 158

5 5
15 15
5 5
1 2

POT 3 - 3
5
15 5 60 5 60 5 60 5 15 POT 1 - 1 POT 2 - 2
200 Relief
230

POT 4 - 4
5
15 5 60 5 60 5 60 5 15
200 Relief
230

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Re-Drawn By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES DETAIL JENDELA Number Date
2022
STA RESOURCES Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF Paper Size: Drawing Number: Sheet Number:

S/G2/KBR/13 A3 ARS-25 26
K1 K1 K1 K1 K1 K1 K1 K1 K1

1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20

F F
1.50 R.Jemur R.Jemur 1.50

E E
Dapur Dapur
KM/WC FFL FFL
KM/WC
1.50 1 ±0.00 ±0.00 1 1.50
FFL -0.05

Kamar Tidur Utama Kamar Tidur Utama


D' FFL ±0.00 FFL ±0.00 D'
3.30 3.30
1.80 KM/WC 2 KM/WC 2 1.80
FFL -0.05 FFL -0.05
R. Makan R. Makan
FFL ±0.00 FFL ±0.00

D D
1.20 1.20
Trn
C' C'
R. R. Kamar Tidur 2
3.70 Keluarga Keluarga FFL ±0.00 3.70
FFL ±0.00 FFL ±0.00
Kamar Tidur 3 Kamar Tidur 3
2.50 FFL ±0.00 FFL ±0.00
2.50

C C
1.50 FFL -0.05 1.50

B K2 K3 K2 B
0.50 0.50
A A

3.00 3.00 3.50 3.50 3.50 3.00 3.00

1 2 2' 3 4 5 6 6' 7 8

DENAH KAP ATAP

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH KAP ATAP Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS - 26 52
Rabung SNI Ex.PT.HRKS (Primadeck Type Spanrib)
t = 0.25 mm Warna Merah Maron

Atap Seng Metal SNI Ex.PT.HRKS (Primadeck Type


Spanrib) t = 0.25 mm Warna Merah Maron

Rangka Atap Baja Ringan SNI Ex.PT.HRKS Primatruss


60

C.75 t = 0.70 mm
60

60 Reng SNI Ex.HRKS Primatruss RT.25 t = 0.45 mm


60

60
689
245
60

60

60

60

60

60
150 150 150

1000

100 100

Lisplang SNI Ex.Kalsiboard


(Kalsiplank) 8 mm x 20 mm
DETAIL KUDA - KUDA (K1)

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DETAIL KUDA - KUDA K1
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-27 52
Rabung SNI Ex.PT.HRKS (Primadeck Type Spanrib)
t = 0.25 mm Warna Merah Maron
Atap Seng Metal SNI Ex.PT.HRKS (Primadeck Type
Spanrib) t = 0.25 mm Warna Merah Maron
Rangka Atap Baja Ringan SNI Ex.PT.HRKS Primatruss
C.75 t = 0.70 mm
60 Reng SNI Ex.HRKS Primatruss RT.25 t = 0.45 mm

82 304
60

60

60

Lisplang SNI Ex.Kalsiboard


300
(Kalsiplank) 8 mm x 20 mm

100 100

DETAIL KUDA - KUDA (K2)

Rabung SNI Ex.PT.HRKS (Primadeck Type Spanrib)


t = 0.25 mm Warna Merah Maron
Atap Seng Metal SNI Ex.PT.HRKS (Primadeck Type
Spanrib) t = 0.25 mm Warna Merah Maron
Rangka Atap Baja Ringan SNI Ex.PT.HRKS Primatruss

C.75 t = 0.70 mm
60 Reng SNI Ex.HRKS Primatruss RT.25 t = 0.45 mm

93 331
60

60

60

Lisplang SNI Ex.Kalsiboard


350
(Kalsiplank) 8 mm x 20 mm

100 100

DETAIL KUDA - KUDA (K3)

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DETAIL KUDA KUDA K2 & K3
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-28 52
560

245
Ring balok 15x20 cm

Ring balok 15x20 cm

Ring balok 15x20 cm


1000

GABLE - G1

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk GABLE ( TEMBOK LAYER)
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-29 52
2 1 2 1

4 5 4 5
3.50 3.50

F F

Bordes Bordes
1.50 1.50
1.98
10 1.98
10

E E
0.50

11 9 0.30 11 9
Ring Balok 15x15
4.80 12 8 4.80 0.30 12 8
13 7 0.30 7
14 6 0.30 14 6
3.30 3.30
15 5 0.30 15 1.425
D13-150
4 0.30 16 4 Struktur Tangga 6
Pasang Keramik
3 0.30 17 3 5
30 30
2 Pondasi Tangga 0.30 18 2 4
30x72
0.30 1 0.30 19 1 100
17.5 3
0.25 D 20 D
17.5 2
Sloof D13-150
25x30 NK 1 TRN NK 1
D13-150

1.57 0.20 1.57 1.57 0.20 1.57 FFL ±0.00 FFL ±0.00
42
25
72
59
2 1 2 1
30 Pondasi Tangga
30x72

Dari Lantai 1 Ke Lantai 2 Dari Lantai 2 Ke Lantai 3


Sloof 25x30 D13-150
25 30

D
DENAH TANGGA DETAIL -1

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH TANGGA
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-30 52
2 1

4 5
3.50

Bordes
1.50
1.98
10

E
0.50

0.30 11 9
4.80 0.30 12 8
0.30 13 7
0.30 14 6
3.30
0.30 15
0.30 16
0.30 17
0.30 18
0.30 19
20 D
1.92

TRN
1.57 0.20 1.57

2 1

Dari Lantai 3 Ke Lantai 2

DENAH TANGGA

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH TANGGA
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-31 52
Ring Balok 15x15

Struktur
Ring Balok Tangga 3.09 1.00
1.00 3.09 15x15
Pasang
1.00
Keramik 20 FFL+3.55
20
19
19 D13-150
18
18
17
17 D13-150
16
16
0.30 15
15 Relief
14
14
13
13 D13-150 1.00 D13-150
12 D13-150 0.17512 3.13
3.13 Glass Block 11
11
Struktur FFL +1.80 10 0.175
10 FFL +1.80
Tangga 3.50 3.50 9
9
D13-150 8
Pasang 8
1.90 7
Keramik 7
D13-150 1.90 6
6
Ring Balok 15x15 5
5
0.30 4
4 1.00
1.00 Struktur 3
3 Ring Balok D13-150
1.00 0.175 3.09 15x15 Tangga 3.09 2 1.00
2
1
1 Pasang
FFL+3.55 20 FFL ±0.00Keramik 20 FFL+3.55
19
FFL ±0.00 19
D13-150
18 18
17 17
D13-150
16 16
15 Relief 0.30 15
14 1.75 14
13 Glass Block 13
12 D13-150 D13-150 1.00 D13-150
3.13 0.17512 3.13
11 11
Struktur 10 FFL +1.80 FFL +1.80 10 0.175
Tangga 9 0.053.50 3.50 9
D13-150 0.12 0.20
Pasang 8 8
Keramik 7 1.90 7
D13-150 1.90
6 6
5 5
0.30 1.75 1.75
4 4
1.00 3 D13-150 3 1.00
0.175
2 2
1 1

FFL ±0.00 FFL ±0.00 FFL ±0.00 FFL ±0.00


0.42
0.25 0.72 0.25 0.25
0.59
0.30 Pondasi Tangga
30x73
Sloof 25x30 D13-150
0.250.30

3.30 1.50 1.50 3.30


D E F F E D

POTONGAN 1 - 1 POTONGAN 2 - 2

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk POTONGAN TANGGA
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-32 52
Besi Strip 1 x 5 cm

12

A B C
78 100

10
23 20 20 20 20 20 20 20 20 20 20 20 20 23
43 100 100 43
KEYPLAN

DETAIL - A RAILING PAGAR

Besi Strip 1 x 5 cm Besi Strip 1 x 5 cm

12 12

78 100 78 100

10 10
21 21 20 20 20 20 20 20 20 20 20 20 21 21 22 21 20 20 20 20 20 21 22
42 100 100 42 43 100 43

DETAIL - B RAILING PAGAR DETAIL - C RAILING PAGAR

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DETAIL RAILING PAGAR
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-33 52
40 45

Elev. +305 15
Elev. +300
Plafond Gypsum SNI Ex.Jaya board t = 9 mm
+ Rangka Furing SNI Ex.PT.MGM(Mahkota)
t = 0.35 mm

50 15

Kaca Kaca
5 mm 5 mm

350 - Keramik dinding & meja dapur 350


Homogenous 60 x 60 cm

305

Cor Beton K175


Ø8-150 mm
- Keramik dinding & meja dapur +0.80 +0.80
Homogenous 60 x 60 cm
Cor Beton K175 +0.60 +0.60
Ø8-150
mm
85 80
- Keramik dinding - Keramik dinding Homogenous
60
Homogenous 60 x 60 cm - Keramik dinding - 60 x 60 cm
Homogenous 60 x 60 cm
±0.00
-0.05
25

22
30 30
Pasangan Batu Bata Diplester + Aci
17
25 1 25
350 150 150
300

POTONGAN 1 - 1 POTONGAN 2 - 2
2 2

3.00
Dapur
FFL
±0.00

KEYPLAN
1

3.50

Drawing
1 Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DETAIL DAPUR Number Date
LANTAI - 1
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-34 52
35 40
20 20 20 20

Elev. +305 15
Elev. +300
Plafond Gypsum SNI Ex.Jaya board t = 9 mm
+ Rangka Furing SNI Ex.PT.MGM(Mahkota)
t = 0.35 mm

50 15

Kaca Kaca
5 mm 5 mm

- Keramik dinding & meja dapur


Homogenous 60 x 60 cm

305

Cor Beton K175


Ø8-150 mm

- Keramik dinding & meja dapur +0.80 +0.80


Homogenous 60 x 60 cm 8
Cor Beton K175 +0.60 +0.60
Ø8-150 mm 8 8
85 80
- Keramik dinding - Keramik dinding Homogenous
60
Pasangan Batu Bata Diplester + Aci Homogenous 60 x 60 cm - 60 x 60 cm

±0.00
-0.05 5 5
60 225

131 60 40

350 1
25
POTONGAN 2 - 2
LANTAI - 2

2 2

3.00
Dapur
FFL
±0.00

KEYPLAN
1

3.50

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DETAIL DAPUR Number Date
LANTAI - 2
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-35 52
Elev. +305 15
Elev. +300
Plafond Gypsum SNI Ex.Jaya board t = 9 mm
+ Rangka Furing SNI Ex.PT.MGM(Mahkota)
t = 0.35 mm

50 15

Kaca Kaca
5 mm 5 mm

- Keramik dinding & meja dapur


Homogenous 60 x 60 cm

305

Cor Beton K175


Ø8-150 mm

- Keramik dinding & meja dapur +0.80 +0.80


Homogenous 60 x 60 cm 8
Cor Beton K175 +0.60 +0.60
Ø8-150 mm 8 8
85 80
- Keramik dinding - Keramik dinding Homogenous
60
Pasangan Batu Bata Diplester + Aci Homogenous 60 x 60 cm - 60 x 60 cm

±0.00
-0.05 5 5
60 225

131 60 40

350 1
25
POTONGAN 2 - 2
LANTAI - 2

2 2

3.00
Dapur
FFL
±0.00

KEYPLAN
1

3.50

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DETAIL DAPUR Number Date
2024 LANTAI - 3
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-36 52
2 3 4 5 6

1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20

F F
Bordes
1.50 R.Cuci R.Jemur 10 R.Jemur R.Cuci 1.50

E E
Dapur Dapur
KM/WC FFL 11 9 FFL
KM/WC
1.50 1 ±0.00
8
±0.00 1 1.50
12
FFL -0.05 FFL -0.05
13 7
Kamar Tidur Utama Kamar Tidur Utama
D' FFL ±0.00
14 6 FFL ±0.00 D'
15 5
3.30 3.30
4
1.80 KM/WC 2 3
KM/WC 2 1.80
FFL -0.05 FFL -0.05
R. Makan 2 R. Makan
FFL ±0.00 FFL ±0.00
1
D D
1.20 1.20
1 NK
C' C'
R. R.
1 3.70 Keluarga Keluarga 3.70 1
FFL ±0.00 FFL ±0.00
Kamar Tidur 3 Parkir Sepeda Kamar Tidur 3
2.50 FFL ±0.00 FFL ±0.00
2.50
Kamar Tidur 2 Motor Kamar Tidur 2
FFL ±0.00 FFL ±0.00

C C
1.50 FFL -0.05 FFL -0.05 1.50

B B
0.50 0.50
A A

2 3 4 5 6

3.00 3.00 3.50 3.50 3.50 3.00 3.00

1 2 2' 3 4 5 6 6' 7 8

DENAH PEMASANGAN KERAMIK (LANTAI - 1)

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH PEMASANGAN KERAMIK
Number Date
2024 1:10
LANTAI -1
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-37 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20

F F
Bordes
1.50 R.Cuci R.Jemur 10 R.Jemur R.Cuci 1.50

E E
Dapur Dapur
KM/WC FFL 9 FFL
KM/WC
11
1.50 1 ±0.00 ±0.00 1 1.50
12 8
FFL -0.05 FFL -0.05
13 7
Kamar Tidur Utama Kamar Tidur Utama
D' FFL ±0.00
14 6 FFL ±0.00 D'
15
3.30 3.30
16
1.80 KM/WC 2 17
KM/WC 2 1.80
FFL -0.05 FFL -0.05
R. Makan 18 R. Makan
FFL ±0.00 FFL ±0.00
19
D 20 D
1.20 1.20
2 Trn
C' C'
R. R.
3.70 Keluarga Keluarga 3.70
FFL ±0.00 FFL ±0.00

2.50 Kamar Tidur 3 Kamar Tidur 3 2.50


FFL ±0.00 FFL ±0.00
Kamar Tidur 2 Kamar Tidur 2
FFL ±0.00 FFL ±0.00

C C
1.50 FFL -0.05 FFL -0.05 1.50

B B
0.50 0.50
A A

3.00 3.00 3.50 3.50 3.50 3.00 3.00

1 2 2' 3 4 5 6 6' 7 8

DENAH PEMASANGAN KERAMIK (LANTAI - 2)

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH PEMASANGAN KERAMIK
Number Date
2024 1:10
LANTAI -2
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-38 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20

F F
Bordes
1.50 R.Cuci R.Jemur 10 R.Jemur R.Cuci 1.50

E E
Dapur Dapur
KM/WC FFL 11 9 FFL
KM/WC
1.50 1 ±0.00 ±0.00 1 1.50
12 8
FFL -0.05 FFL -0.05
13 7
Kamar Tidur Utama Kamar Tidur Utama
D' FFL ±0.00
14 6 FFL ±0.00 D'
15
3.30 3.30
16
1.80 KM/WC 2 17
KM/WC 2 1.80
FFL -0.05 FFL -0.05
R. Makan 18 R. Makan
FFL ±0.00 FFL ±0.00
19
D 20 D
1.20 1.20
2 Trn
C' C'
R. R.
3.70 Keluarga Keluarga 3.70
FFL ±0.00 FFL ±0.00
Kamar Tidur 3 Kamar Tidur 3
2.50 FFL ±0.00 FFL ±0.00
2.50
Kamar Tidur 2 Kamar Tidur 2
FFL ±0.00 FFL ±0.00

C C
1.50 FFL -0.05 FFL -0.05 1.50

B B
0.50 0.50
A A

3.00 3.00 3.50 3.50 3.50 3.00 3.00

1 2 2' 3 4 5 6 6' 7 8

DENAH PEMASANGAN KERAMIK (LANTAI - 3)

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH PEMASANGAN KERAMIK
Number Date
2024 1:10
LANTAI -2
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-39 52
Keramik Lantai 20 x 20 cm
Ex.Roman
Elev. +305
Plafond Gypsum SNI Ex.Jaya board t = 9 mm
t+=Rangka
0.35 mm
Furing SNI Ex.PT.MGM(Mahkota)

Elev. +305 Elev. +305


2 Plafond
+ RangkaGypsum
Furing SNI Ex.Jaya
t = 0.35 mm
Ex.PT.MGM(Mahkota)
board t = 9 mm

Plafond
+ RangkaGypsum
Furing SNI Ex.Jaya
t = 0.35 mm
Ex.PT.MGM(Mahkota)
board t = 9 mm

0.70

Kaca Kaca
5 mm 5 mm
1 KM/WC 1
1 +0.10 Keramik 20 x 40 cm t = 200 cm Keramik 20 x 40 cm t = 200 cm
-0.05 1.50
Ex.Roman Ex.Roman

Kaca Buram
Keramik 20 x 40 cm t = 200 cm
Ex.Roman

305 305
KM/WC
2
-0.05 +0.10 1.80

2
1.80 Kloset Jongkok
Bak Air Bak Air
Ex. Toto
Fibre Fibre
DENAH KM/WC LT-1
Keramik Lantai 20 x 20 cm
Ex.Roman 70
+0.10 +0.10 +0.10
±0.00
-0.05 5
20 25

30 30 30 30 30

25 25 25 25 25

POTONGAN 1 - 1 POTONGAN 2 - 2

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk Number Date
DENAH & POTONGAN KM/WC LANTAI - 1
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-40 52
Keramik Lantai 20 x 20 cm
Ex.Roman
2

0.70 Plafond Gypsum SNI Ex.Jaya board t = 9 mm


+ Rangka Furing SNI Ex.PT.MGM(Mahkota)
t = 0.35 mm

Elev. +305 Elev. +305 Elev. +305

Kaca Kaca
5 mm 5 mm
1 KM/WC 1
1 +0.10
-0.05 1.50

Keramik 20 x 40 cm t = 200 cm Keramik 20 x 40 cm t = 200 cm


Kaca Buram Ex.Roman Ex.Roman

Keramik 20 x 40 cm t = 200 cm
KM/WC Ex.Roman 350
2
-0.05 +0.10 1.80

2
1.80

Kloset Jongkok
DENAH KM/WC LT-2 Ex. Toto
Bak Air Bak Air
Fibre Fibre

Keramik Lantai 20 x 20 cm
Ex.Roman 70
+0.10 +0.10 +0.10

-0.05

POTONGAN 1 - 1 POTONGAN 2 - 2

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk Number Date
DENAH & POTONGAN KM/WC LANTAI - 2
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-41 52
Keramik Lantai 20 x 20 cm
Ex.Roman
2

0.70 Plafond Gypsum SNI Ex.Jaya board t = 9 mm


+ Rangka Furing SNI Ex.PT.MGM(Mahkota)
t = 0.35 mm

Elev. +305 Elev. +305 Elev. +305

Kaca Kaca
5 mm 5 mm
1 KM/WC 1
1 +0.10
-0.05 1.50

Keramik 20 x 40 cm t = 200 cm Keramik 20 x 40 cm t = 200 cm


Kaca Buram Ex.Roman Ex.Roman
400

Keramik 20 x 40 cm t = 200 cm
KM/WC Ex.Roman
2
-0.05 +0.10 1.80

2
1.80

Kloset Jongkok
DENAH KM/WC LT-2 Ex. Toto
Bak Air Bak Air
Fibre Fibre

Keramik Lantai 20 x 20 cm
Ex.Roman 70
+0.10 +0.10 +0.10

-0.05

POTONGAN 1 - 1 POTONGAN 2 - 2

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk Number Date
DENAH & POTONGAN KM/WC LANTAI - 2
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-42 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20

F F
Bordes
1.50 R.Cuci R.Jemur 10 R.Jemur R.Cuci 1.50

E E
Dapur Dapur
KM/WC FFL 11 9 FFL
KM/WC
1.50 1 ±0.00
8
±0.00 1 1.50
12
FFL -0.05 FFL -0.05
13 7
Kamar Tidur Utama Kamar Tidur Utama
D' FFL ±0.00
14 6 FFL ±0.00 D'
15 5
3.30 3.30
4
1.80 KM/WC 2 3
KM/WC 2 1.80
FFL -0.05 FFL -0.05
R. Makan 2 R. Makan
FFL ±0.00 FFL ±0.00
FFL ±0.00
1
D D
1.20 1.20
NK
C' C'
R. R.
3.70 Keluarga Keluarga 3.70
Kamar Tidur 2 FFL ±0.00 FFL ±0.00 Kamar Tidur 2
2.50
FFL ±0.00 Kamar Tidur 3 Parkir Sepeda Kamar Tidur 3 FFL ±0.00
2.50
FFL ±0.00 FFL ±0.00
Motor

C C
1.50 1.50

B B
0.50 0.50
A A

3.00 3.00 3.50 3.50 3.50 3.00 3.00

1 2 2' 3 4 5 6 6' 7 8

DENAH PLAFOND LANTAI - 1

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk Number Date
DENAH PLAFOND LANTAI - 1
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-43 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20

F F
1.50 R.Cuci R.Jemur R.Jemur R.Cuci 1.50

E E
Dapur Dapur
KM/WC FFL FFL
KM/WC
1.50 1 ±0.00 ±0.00 1 1.50
FFL -0.05 FFL -0.05

Kamar Tidur Utama Kamar Tidur Utama


D' FFL ±0.00 FFL ±0.00 D'
3.30 3.30
1.80 KM/WC 2 KM/WC 2 1.80
FFL -0.05 FFL -0.05
R. Makan R. Makan
FFL ±0.00 FFL ±0.00

D D
1.20 1.20

C' C'
R.
R. R.
3.70 Keluarga
Keluarga Keluarga 3.70
Kamar Tidur 2 FFL
FFL±0.00
±0.00 FFL ±0.00 Kamar Tidur 2
2.50
FFL ±0.00 Kamar Tidur 3 Kamar Tidur 3 FFL ±0.00
2.50
FFL ±0.00 FFL ±0.00

C C
1.50 FFL -0.05 FFL -0.05 1.50

B B
0.50 0.50
A A

3.00 3.00 3.50 3.50 3.50 3.00 3.00

1 2 2' 3 4 5 6 6' 7 8

DENAH PLAFOND LANTAI - 2

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk Number Date
DENAH PLAFOND LANTAI - 2 1:10
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-44 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20

F F
1.50 R.Cuci R.Jemur R.Jemur R.Cuci 1.50

E E
Dapur Dapur
KM/WC FFL FFL
KM/WC
1.50 1 ±0.00 ±0.00 1 1.50
FFL -0.05 FFL -0.05

Kamar Tidur Utama Kamar Tidur Utama


D' FFL ±0.00 FFL ±0.00 D'
3.30 3.30
1.80 KM/WC 2 KM/WC 2 1.80
FFL -0.05 FFL -0.05
R. Makan R. Makan
FFL ±0.00 FFL ±0.00

D D
1.20 1.20

C' C'
R.
R. R.
3.70 Keluarga
Keluarga Keluarga 3.70
Kamar Tidur 2 FFL
FFL±0.00
±0.00 FFL ±0.00 Kamar Tidur 2
FFL ±0.00 Kamar Tidur 3 Kamar Tidur 3 FFL ±0.00
2.50 FFL ±0.00 FFL ±0.00
2.50

C C
1.50 FFL -0.05 FFL -0.05 1.50

B B
0.50 0.50
A A

3.00 3.00 3.50 3.50 3.50 3.00 3.00

1 2 2' 3 4 5 6 6' 7 8

DENAH PLAFOND LANTAI - 3

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk Number Date
DENAH PLAFOND LANTAI - 2 1:10
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-45 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20

Posisi antena disesuaikan di lokasi Posisi antena disesuaikan di lokasi

F F
R.Jemur
1.50 R.Cuci Dapur Dapur R.Cuci 1.50
POMPA AIR R.Jemur
Bordes
E 10 E
KM/WC 1 Dapur
11 9
KM/WC
1.50 8 1 1.50
12
13 7
Kamar Tidur Kamar TidurKamarUtamaTidur
D' Utama
14 6 FFL ±0.00
Utama D'
KM/WC 2 15 5
3.30 3.30
4
1.80 EXHAUST 3 EXHAUST KM/WC 2 1.80
R. Makan R. Makan FAN
FAN 2
1
D D
1.20 1.20
NK
C' Parkir Sepeda C'
R. R.
Motor 1
3.70 Keluarga Keluarga 3.70
FFL ±0.00 FFL ±0.00
Kamar Tidur 3 Kamar Tidur 3
2.50 2.50
Kamar Tidur 2 Kamar Tidur 2

C C
1.50 1.50

B B
0.50 0.50
A A

Stop Stop
Lampu Lampu Saklar Saklar Ceiling Exhaust Distribution MCB KWH Kabel
Item kontak kontak Antena
LED LED tunggal ganda fan fan Box 6A Meter Antena
tunggal ganda
3.00 3.00 3.50 3.50 3.50
Kode

1 2 2' 3 4 5 6 Spesifikasi
Download
9 watt
Droff
9 watt
Download
6 watt
Level
+150
Level
+150
Level +30 Level +30
Level
+250
Level
+250
Level +60

Teras 12 3 - - - - - - - - - 6 - -
R. Keluarga 6 - - 6 6 12 - 6 - 6 6 - 6 -
R. Makan 6 - - - 6 - 6 - - - - - - -
Dapur 6 - - - 6 6 - - -
Kamar tidur 1 6 - - 6 - - 6 6 - - - - - -
Kamar tidur 2 6 - - 6 - - 6 6 - - - - - -
Kamar tidur 3 6 - - 6 - 6 - 6 - - - - - -
Koridor 6 - - - - - - - - - - - - -
KM / WC 1 - - 6 6 - - - - - - - - - -
KM / WC 2 - - 6 6 - - - - 6 - - - - -
R.Jemur 6 - - - - - - - - - - - - 6

DENAH INSTALASI LISTRIK LANTAI - 1 Ruang Tangga


Pompa Air
7
-
-
-
-
-
-
-
5
-
1
6
-
-
-
-
-
-
-
-
-
1
-
-
-
-
-
-

Total : 67 3 12 36 23 31 18 24 6 6 7 6 6 6
Keterangan:
Lampu LED merk ex.Phillips, Saklar & Stop Kontak merk ex. Panasonic , Kabel NYA 1,5 mm2 & 2.5 mm2 merk ex.Supreme , Box Panel MCB +
MCB 6 A merk ex. Sneider
Harap diperhatikan posisi kolom & struktur bangunan sebelum memasang jalur elektrikal

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH INSTALASI LISTRIK Number Date
2024 LANTAI - 2
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-46 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20
Posisi antena disesuaikan di lokasi Posisi antena disesuaikan di lokasi

F F
Bordes
1.50 R.Cuci R.Jemur 10 R.Jemur R.Cuci 1.50

E E
Dapur Dapur
KM/WC 11 9
KM/WC
1.50 1 1 1.50
12 8
13 7
Kamar Tidur Utama Kamar Tidur Utama
D' 14 6 D'
15
3.30 3.30
16
1.80 KM/WC 2 EXHAUST 17 EXHAUST KM/WC 2 1.80
FAN R. Makan 18 R. Makan FAN
19
D 20 D
1.20 1.20
Trn
C' C'
R. R.
3.70 Keluarga Keluarga 3.70
Kamar Tidur 3 Kamar Tidur
Kamar
3 Tidur 3
2.50 2.50
Kamar Tidur 2 Kamar Tidur 2

C C
1.50 1.50

B B
0.50 0.50
A A

3.00 3.00 3.50 3.50 3.50 3.00 3.00

1 2 2' 3 4 5 6 6' 7 8

DENAH INSTALASI LISTRIK LANTAI - 2

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH INSTALASI LISTRIK Number Date
2024 LANTAI - 2
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-47 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20
Posisi antena disesuaikan di lokasi Posisi antena disesuaikan di lokasi

F F
Bordes
1.50 R.Cuci R.Jemur 10 R.Jemur R.Cuci 1.50

E E
Dapur Dapur
KM/WC 11 9
KM/WC
1.50 1 1 1.50
12 8
13 7
Kamar Tidur Utama Kamar Tidur Utama
D' 14 6 D'
15
3.30 3.30
16
1.80 KM/WC 2 EXHAUST 17 EXHAUST KM/WC 2 1.80
FAN R. Makan 18 R. Makan FAN
19
D 20 D
1.20 1.20
Trn
C' C'
R. R.
3.70 Keluarga Keluarga 3.70
Kamar Tidur 3 Kamar Tidur
Kamar
3 Tidur 3
2.50 2.50
Kamar Tidur 2 Kamar Tidur 2

C C
1.50 1.50

B B
0.50 0.50
A A

3.00 3.00 3.50 3.50 3.50 3.00 3.00

1 2 2' 3 4 5 6 6' 7 8

DENAH INSTALASI LISTRIK LANTAI - 3

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH INSTALASI LISTRIK Number Date
2024 LANTAI - 2
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-48 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
PIPA Ø3/4" (Ab Inlet) PIPA Ø3/4" (Ab Inlet)
4.20 1.80 3.50 3.50 1.80 4.20
PIPA Ø3" (AB) PIPA Ø3" (AB) PIPA Ø3" PIPA Ø3" PIPA Ø3" (AB) PIPA Ø3" (AB)
PIPA Ø4" (AK) PIPA Ø4" (AK)
PIPA Ø2" (Ab outlet) PIPA Ø2" (Ab outlet)

F FD FD FD
F
R.Cuci Bordes
1.50 R.Jemur PIPA Ø34" PIPA Ø34" R.Jemur R.Cuci 1.50
10
PIPA Ø34" PIPA Ø34"

E E
PIPA Ø1/2" Dapur DapurPIPA Ø1/2"
KM/WC FFL 11 9 FFL
KM/WC
1.50 1 ±0.00 ±0.00 1 1.50
12 8
FFL -0.05 FFL -0.05
FD 13 7 FD
Kamar Tidur Utama Kamar Tidur Utama
D' FFL ±0.00
FD
14 6
FD
FFL ±0.00 D'
15
3.30 3.30
16
1.80 KM/WC 2 17
KM/WC 2 1.80
FFL -0.05 FFL -0.05
R. Makan 18 R. Makan
FFL ±0.00 FFL ±0.00
19
D 20 D
1.20 1.20
Trn
C' 25 C'
R. R.
3.70 Keluarga Keluarga 3.70
FFL ±0.00 FFL ±0.00
Kamar Tidur 3 Kamar Tidur 3
2.50 FFL ±0.00 FFL ±0.00
2.50
Kamar Tidur 2 Kamar Tidur 2
FFL ±0.00 FFL ±0.00

C C
1.50 FFL -0.05 FFL -0.05 1.50
FD FD
B B
0.50 0.50
A A
Keterangan:

Air bersih (Ab) Pipa PVC 1/2" & 34" & 2"

Air Buangan (AB) Pipa PVC 3"

Air Kotoran (AK) Toilet/KM/WC Pipa PVC 4"

( Lembar ini disarankan dicetak berwarna )

3.00 3.00 3.50 3.50 3.50 3.00 3.00

1 2 2' 3 4 5 6 6' 7 8
Catatan :

DENAH INSTALASI AIR LANTAI - 2


Instalasi Air Bersih memakai Pipa PVC Ø1/2" & Ø3/4" ,Ø2" AW merk ex. Invilon atau Wavin

Instalasi Air Kotor PVC Ø4" & Dan Air Buangan memakai Pipa Ø3" D merk ex.Invilon atau Wavin

Sanitair Fixture : Kloset Jongkok merk Toto , Floor Drain Ø3" merk ex.San Ei, Kran Air merk ex. Onda

Kitchen Sink 1 lubang S/S merk ex.Royal , Roof Drain S/S Ø3" merk San Ei

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH INSTALASI AIR Number Date
2024 LANTAI - 2
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-50 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
PIPA Ø3/4" (Ab Inlet) PIPA Ø3/4" (Ab Inlet)
4.20 1.80 3.50 3.50 1.80 4.20
PIPA Ø3" (AB) PIPA Ø3" (AB) PIPA Ø3" PIPA Ø3" PIPA Ø3" (AB) PIPA Ø3" (AB)
PIPA Ø4" (AK) PIPA Ø4" (AK)
PIPA Ø2" (Ab outlet) PIPA Ø2" (Ab outlet)

F FD FD FD
F
R.Cuci Bordes
1.50 R.Jemur PIPA Ø34" PIPA Ø34" R.Jemur R.Cuci 1.50
10
PIPA Ø34" PIPA Ø34"

E E
PIPA Ø1/2" Dapur DapurPIPA Ø1/2"
KM/WC FFL 11 9 FFL
KM/WC
1.50 1 ±0.00 ±0.00 1 1.50
12 8
FFL -0.05 FFL -0.05
FD 13 7 FD
Kamar Tidur Utama Kamar Tidur Utama
D' FFL ±0.00
FD
14 6
FD
FFL ±0.00 D'
15
3.30 3.30
16
1.80 KM/WC 2 17
KM/WC 2 1.80
FFL -0.05 FFL -0.05
R. Makan 18 R. Makan
FFL ±0.00 FFL ±0.00
19
D 20 D
1.20 1.20
Trn
C' 25 C'
R. R.
3.70 Keluarga Keluarga 3.70
FFL ±0.00 FFL ±0.00
Kamar Tidur 3 Kamar Tidur 3
2.50 FFL ±0.00 FFL ±0.00
2.50
Kamar Tidur 2 Kamar Tidur 2
FFL ±0.00 FFL ±0.00

C C
1.50 FFL -0.05 FFL -0.05 1.50
FD FD
B B
0.50 0.50
A A
Keterangan:

Air bersih (Ab) Pipa PVC 1/2" & 34" & 2"

Air Buangan (AB) Pipa PVC 3"

Air Kotoran (AK) Toilet/KM/WC Pipa PVC 4"

( Lembar ini disarankan dicetak berwarna )

3.00 3.00 3.50 3.50 3.50 3.00 3.00

1 2 2' 3 4 5 6 6' 7 8
Catatan :

DENAH INSTALASI AIR LANTAI - 2


Instalasi Air Bersih memakai Pipa PVC Ø1/2" & Ø3/4" ,Ø2" AW merk ex. Invilon atau Wavin

Instalasi Air Kotor PVC Ø4" & Dan Air Buangan memakai Pipa Ø3" D merk ex.Invilon atau Wavin

Sanitair Fixture : Kloset Jongkok merk Toto , Floor Drain Ø3" merk ex.San Ei, Kran Air merk ex. Onda

Kitchen Sink 1 lubang S/S merk ex.Royal , Roof Drain S/S Ø3" merk San Ei

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH INSTALASI AIR Number Date
2024 LANTAI - 2
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-50 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
PIPA Ø3/4" (Ab Inlet) PIPA Ø3/4" (Ab Inlet)
4.20 1.80 3.50 3.50 1.80 4.20
PIPA Ø3" (AB) PIPA Ø3" (AB) PIPA Ø3" PIPA Ø3" PIPA Ø3" (AB) PIPA Ø3" (AB)
PIPA Ø4" (AK) PIPA Ø4" (AK)
PIPA Ø2" (Ab outlet) PIPA Ø2" (Ab outlet)

F FD FD FD
F
R.Cuci Bordes
1.50 R.Jemur PIPA Ø34" PIPA Ø34" R.Jemur R.Cuci 1.50
10
PIPA Ø34" PIPA Ø34"

E E
PIPA Ø1/2" Dapur DapurPIPA Ø1/2"
KM/WC FFL 11 9 FFL
KM/WC
1.50 1 ±0.00 ±0.00 1 1.50
12 8
FFL -0.05 FFL -0.05
FD 13 7 FD
Kamar Tidur Utama Kamar Tidur Utama
D' FFL ±0.00
FD
14 6
FD
FFL ±0.00 D'
15
3.30 3.30
16
1.80 KM/WC 2 17
KM/WC 2 1.80
FFL -0.05 FFL -0.05
R. Makan 18 R. Makan
FFL ±0.00 FFL ±0.00
19
D 20 D
1.20 1.20
Trn
C' 25 C'
R. R.
3.70 Keluarga Keluarga 3.70
FFL ±0.00 FFL ±0.00
Kamar Tidur 3 Kamar Tidur 3
2.50 FFL ±0.00 FFL ±0.00
2.50
Kamar Tidur 2 Kamar Tidur 2
FFL ±0.00 FFL ±0.00

C C
1.50 FFL -0.05 FFL -0.05 1.50
FD FD
B B
0.50 0.50
A A
Keterangan:

Air bersih (Ab) Pipa PVC 1/2" & 34" & 2"

Air Buangan (AB) Pipa PVC 3"

Air Kotoran (AK) Toilet/KM/WC Pipa PVC 4"

( Lembar ini disarankan dicetak berwarna )

3.00 3.00 3.50 3.50 3.50 3.00 3.00

1 2 2' 3 4 5 6 6' 7 8
Catatan :

DENAH INSTALASI AIR LANTAI - 3


Instalasi Air Bersih memakai Pipa PVC Ø1/2" & Ø3/4" ,Ø2" AW merk ex. Invilon atau Wavin

Instalasi Air Kotor PVC Ø4" & Dan Air Buangan memakai Pipa Ø3" D merk ex.Invilon atau Wavin

Sanitair Fixture : Kloset Jongkok merk Toto , Floor Drain Ø3" merk ex.San Ei, Kran Air merk ex. Onda

Kitchen Sink 1 lubang S/S merk ex.Royal , Roof Drain S/S Ø3" merk San Ei

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH INSTALASI AIR Number Date
2024 LANTAI - 3
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-51 52
Pipa Hawa Besi/PVC Aw Ø1,5"
Besi Beton Ø8 mm

Besi Beton Ø8 mm
Pipa Hawa Besi/PVC Aw Ø1,5"

C/W Besi Beton Ø8 mm-150 mm C/W Besi Beton Ø8 mm-150 mm


Beton K175 Beton K175

-0.17 -0.17
8 Muka Tanah -0.25 -0.25 Muka Tanah -0.25 -0.25 8 Muka Tanah -0.25
40

50 TANAH TIMBUNAN

PIPA Ø 4" PLASTER KASAR PLASTER KASAR


Pasangan 1/2 Bata
20

20 PASIR URUG
180 Pipa Peresapan Ø3" 180

100
Pasangan 1/2 Bata
Pipa di Lubangi + Dibalut Ijuk + Sirtu
Beton K175 Beton K175

15 100 15 15 100 15 100 15

POTONGAN 1-1
POTONGAN 2-2

15

Peresapan

Ø8 - 150
100 100

Ø8 - 150

15

100 200 15 100 15 100 15


PIPA Ø 4"

DETAIL SEPTICTANK & RESAPAN

Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk Number Date
DETAIL SEPTICTANK & RESAPAN
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:

G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-52 52