Professional Documents
Culture Documents
Rumah g2 Staff 3 Lantai
Rumah g2 Staff 3 Lantai
G2.3LT/STOF/CIV/III/2024/SU/0
NO. NO. GAMBAR JUDUL GAMBAR NO. NO. GAMBAR JUDUL GAMBAR
01 ARS-01 DENAH LANTAI - 1 28 ARS-28 DETAIL KUDA - KUDA (K2) & (K3)
22 ARS-22 DETAIL PINTU 49 ARS-49 DENAH INSTALASI PLUMBING LANTAI - 1 Dimensi pada gambar adalah mutlak dan sesuai dengan yang tertera.
Dilarang mengukur gambar secara manual.
23 ARS-23 DETAIL JENDELA 50 ARS-50 DENAH INSTALASI PLUMBING LANTAI - 2
Semua gambar harus diperiksa terlebih dahulu di lapangan dan
24 ARS-24 DETAIL JERJAK 51 ARS-51 DENAH INSTALASI PLUMBING LANTAI - 3
diverifikasi sebelum memulai pelaksanaan
25 ARS-25 DETAIL JENDELA 52 ARS-52 DETAIL SEPTICTANK & RESAPAN
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20
FFL -0.10
100 0.60 0.60 100
F F
Bordes
1.50 R.Cuci R.Jemur 10 R.Jemur R.Cuci 1.50
FFL -0.10 FFL -0.05 FFL -0.05 FFL -0.10
FFL +1.80
E E
Dapur Dapur
3 KM/WC FFL 11 9 FFL
KM/WC 3
1.50 1 ±0.00 ±0.00 1 1.50
12 8
FFL -0.05 FFL -0.05
13 7
Kamar Tidur Utama Kamar Tidur Utama
D' FFL ±0.00
14 6 FFL ±0.00 D'
15 5
3.30 3.30
4
1.80 FFL -0.10
KM/WC 2 3 KM/WC 2 1.80
FFL -0.05 FFL -0.05 FFL -0.10
R. Makan 2 R. Makan
FFL ±0.00 FFL ±0.00
1
D D
2 2
1.20 1.20
NK
C' C'
R. R.
3.70 Keluarga Keluarga 3.70
FFL ±0.00 FFL ±0.00
C C
1.50 FFL -0.10 FFL -0.05 FFL -0.05 FFL -0.10 1.50
B B
0.50 FFL -0.10 0.50
A A
FFL -0.05
4 5 6 6 7 8
1 2 2' 3 4 5 6 6' 7 8
DENAH LANTAI - 1
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk Number Date
DENAH LANTAI - 1
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-01 52
4 5 7 7 8 9
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20
F F
Bordes
1.50 R.Cuci R.Jemur 10 R.Jemur R.Cuci 1.50
FFL +3.50 FFL +3.50
FFL +1.80
E E
Dapur Dapur
3 KM/WC FFL +3.55 11 9 FFL +3.55
KM/WC 1 3
1.50 1 8 FFL +3.50 1.50
12
FFL -3.50
13 7
Kamar Tidur Utama Kamar Tidur Utama
D' 14 6 FFL +3.55 D'
FFL +3.55
15 5
3.30 3.30
16
1.80 KM/WC 2 17 KM/WC 2 1.80
FFL -3.50 FFL +3.50
R. Makan 18 R. Makan
FFL +3.55 FFL +3.55
19
D 20 D
10.00
2 2
1.20 1.20
Trn
C' 25 C'
R. R.
3.70 Keluarga Keluarga 3.70
FFL +3.55
FFL +3.55
Kamar Tidur 3 Kamar Tidur 3
1 2.50 FFL +3.53 FFL +3.55
2.50 1
Kamar Tidur 2 FFL +3.55 Kamar Tidur 2
FFL +3.55
FFL +3.55
C C
FFL +3.50
1.50 FFL -0.05 1.50
FFL +3.50
0.60
B B
0.50 0.10 0.10 0.50
A 1.00 A
0.40
0.15 0.15 1.85 0.15 0.15
0.60 0.60
4 5 6 7 8 9
1 2 2' 3 4 5 6 6' 7 8
DENAH LANTAI - 2
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH LANTAI - 2 Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-02 52
4 5 6 7 8
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20
F F
Bordes
1.50 R.Cuci R.Jemur 10 R.Jemur R.Cuci 1.50
FFL +3.50 FFL +3.50
FFL +1.80
E E
Dapur Dapur
3 KM/WC FFL +3.55 9 FFL +3.55
KM/WC 1 3
11
1.50 1 FFL +3.50 1.50
12 8
FFL -3.50
13 7
Kamar Tidur Utama Kamar Tidur Utama
D' 14 6 FFL +3.55 D'
FFL +3.55
15 5
3.30 3.30
16
1.80 KM/WC 2 17
KM/WC 2 1.80
FFL -3.50 FFL +3.50
R. Makan 18 R. Makan
FFL +3.55 FFL +3.55
19
D 20 D
2 2
1.20 1.20
Trn
C' 25 C'
R. R.
3.70 Keluarga Keluarga 3.70
FFL +3.55
FFL +3.55
Kamar Tidur 3 Kamar Tidur 3
1 2.50 FFL +3.53 FFL +3.55
2.50 1
Kamar Tidur 2 FFL +3.55 Kamar Tidur 2
FFL +3.55
FFL +3.55
C C
FFL +3.50
1.50 FFL -0.05 1.50
FFL +3.50
0.60
B B
0.50 0.10 0.10 0.50
A 1.00 A
0.40
0.15 0.15 1.85 0.15 0.15
0.60 0.60
4 5 6 7 8
1 2 2' 3 4 5 6 6' 7 8
DENAH LANTAI - 3
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH LANTAI - 3 Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-03 52
TAMPAK DEPAN
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk Number Date
TAMPAK DEPAN
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-04 52
TAMPAK SAMPING KIRI TAMPAK SAMPING KANAN
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk TAMPAK SAMPING
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-05 52
KACA
GLASS BLOCK
KACA
GLASS BLOCK
TAMPAK BELAKANG
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk TAMPAK BELAKANG
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-06 52
- 11.00
4.00
FFL +7.05
- 7.00
3.50
3.50
1 2 3 4 5 6 7 8
POTONGAN 1 - 1
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk Number Date
POTONGAN 1 - 1
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-07 52
1.39 1.39
- 11.00
0.61
0.61
0.40 1.33 0.40
KACA GLASS
BLOCK 4.00
0.05
0.78
FFL +7.05 0.05 +7.00
- 7.00
3.50
FFL +3.55
- 3.50
3.50
1 2 3 4 5 6 7 8
POTONGAN 2 - 2
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk Number Date
POTONGAN 1 - 1
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-08 52
- 11.00
4.00
FFL +7.05
- 7.00
3.50
3.50
8 7 6 5 4 3 2 1
POTONGAN 3 - 3
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk POTONGAN 1 - 1
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-09 52
- 11.00
0.50
0.85
0.35 1.00 0.35
0.15 0.30 0.15
4.00 4.00
3.00 3.00
0.80
1.04
0.85
FFL +3.55 FFL +3.55 0.10
- 3.50 0.10 0.15
0.35
0.25 0.50
POTONGAN 4 - 4 POTONGAN 5 - 5
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk POTONGAN 2 - 2
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-10 52
- 11.00 - 11.00
1.00 1.00
4.00 4.00
- Keramik dinding & meja dapur - Keramik dinding & meja dapur
Homogenous 60 x 60 cm Homogenous 60 x 60 cm
+0.60 +0.60
+0.60 +0.60
BALOK BERGESER DARI AS SEBANYAK 7.5 CM BALOK BERGESER DARI AS SEBANYAK 7.5 CM
(PENEMPATAN KOSEN JENDELA) (PENEMPATAN KOSEN JENDELA)
+0.60 +0.60
F D' B F D' B
POTONGAN 6 - 6 POTONGAN 6 - 6
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk POTONGAN 3 - 3
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-11 52
- 11.00 - 11.00
1.00 1.00
0.40
20 FFL +7.05 20 FFL +7.05
- 7.00 19 - 7.00 19
18 18
16
17
0.25 16
17
0.15
15 15
14 14
13 13
12 12
10
11
10
11
0.50
3.50 9 3.50 9
8 0.65 8
7
6
7
6
3.25
5 5
4 4
3 3
2
1
0.90 0.40 2
1
20 FFL +3.55 20 FFL +3.55
- 3.50 19 - 3.50 19
18 18
17 17 0.15
16 16
15 1.00 15 1.00
14 14
13 13
12 12
11 11
10 10
3.50 9 3.50
8 8
7 7
6 6
5 5
4 4
3 3
2 2
1 1
10.50 10.50
F A F A
POTONGAN 8 - 8 POTONGAN 9 - 9
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk POTONGAN 4 - 4
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-12 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80
3 3.50 3.50 1.80 4.20
1.50
F F
K1 25x30 K2 25x30 K2 25x30 K3 25x30
Bordes K3 25x30 K2 25x30 K2 25x30 K1
1.50 10 1.50
E E
K2 25x30 K2 25x30 K2 K2 K2 K2 25x30 25x30 K1
K2
17X22
11 9
1.50 1.50
12
2 8
25x30
25x30
13
25x30
25x30
7
D' 14 6 D'
17X22 17X22 15 17x22 17x22
1 5
17X22
17X22
3.30 3.30
25x30
25x30
25x30
4
1.80 3 1.80
2
1
D D
K2 25x30 K2 25x30 K1 K2 25x30 K2 K1 25x30 K2 25x30 K2
1.20 1.20
NK
C' C'
17x22 17x22
25x30
3.70 3.70
25x30
25x30
25x30
25x30
25x30
25x30
25x30
2.50 2.50
25x30 25x30
K2 25x30
K2
25x30 25x30 25x30
C C
K1 25x30
25x30
K2 K1 K1 K2 K1
25x30
25x30
25x30
25x30
25x30
25x30
25x30
1.50
1 2 2' 3 4 5 6 6' 7 8
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH PONDASI & KOLOM
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-13 52
25
Sloof 25x30
15
D16-150 mm
D16-150 mm
D16-150 mm
2 2 - 0.05
50 25 70
D16-150 mm
50 13
2 2
50
56 30 Jembatan
17 30 17 83
50
DETAIL PONDASI - 1 13
1.50
DETAIL PONDASI - 2 UMPAK - 0.25
Sloof 23x30 cm 22
30 30
45
Pedestal
25x25 cm
15
D16-150 mm
15 30 17 50
100
Beton K175 Beton K100 t = 5 cm Jembatan panjang 1 m
Pasir Urug t = 3 cm
50 Beton K175
D16-150 mm 3 Pasir urug t = 3 cm Tanah Urug Ø10-200 mm t = 7 cm
5 50 5
60 - 0.05
5
13
5 50 5 20
60 POTONGAN 2 - 2 7 -0.25
30
POTONGAN 1 - 1
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DETAIL PONDASI
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-14 52
KOLOM PRAKTIS KOLOM KANOPY
60 15
90
4Ø10 8D16 4Ø10 4Ø10
15 Ø10-125 Ø10-125
Ø8-110 15
15 Ø8-150 8D16
12D16 15 15 65 15 50
60 16D16
60 65 Ø8-110
15 15 15 15 15
70 45
Ø8-110 Ø8-110
80 65
15 45 Ø8-150 Ø8-150
15 4Ø10 4Ø10
15 x 15 K1 K2 K3 K4
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DETAIL PONDASI, SLOOF, KOLOM, BALOK ,
Number Date
2024 KOLOM PRAKTIS & SUMBU
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-15 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
K2 K2 K3 K3 K2 K2 K1
F K1 F
B3 B3 B1 B1 B1 B3 B3
25x40
25x40
25x40
25x40
25x40
25x40
25x40
25x40
B1
B1
B1
B1
B1
B1
B1
B1
1.50 25X40+25 25X40+25 25X40 25X40 25X40 25X40+25 25X40+25 1.50
0.20
E K2 KP K2 E
B1 K2 B1 B1 K2 B1 K2 B1 K2
15x20
B1 15x20
K2 K2
B6 25x40 B6
B6
1.50 25X40 25X40 25X40 25X40 25X40 1.50
KP
25x40
25x40
25x40
25x40
25x40
25x40
25x40
KP
D' KP D'
B1
B1
B1
B1
B1
B1
B1
KP
B6 KP B6 KP
3.30 KP KP 3.30
15x20 15x20
15x20
15x20
B6
1.80 1.80
KP KP
D K2
D
K2 B1 B1 K1 B1 K2 B3 K2 B1 K1 B1 K2 B1
K2
1.20 25X40 25X40 25X40 25X40+25 25X40 25X40 25X40 1.20
C' KP KP
KP KP C'
25x40
25x40
25x40
25x40
25x40
25x40
25x40
25x40
B1
B1
B1
B1
B1
B1
B1
B1
3.70 3.70
2.50 2.50
B1 B1 B1 B1 B1 B1 B1
K1 25X40 K2 25X40 K1 25X40 K2 25X40 K2 25X40 K1 25X40 K2 25X40
K1
C C
25x40
25x40
25x40
25x40
25x40
25x40
25x40
25x40
B1
B1
B1
B1
B1
B1
B1
B1
1.50 B3 B3 1.50
B3 B3
25X40+25 25X40+25
25X40+25 25X40+25
B4 0.70 B1 B4
B 15X65
0.075
K1 25X40
0.075
15X65 B
0.50 K2 K4 0.65 K2 0.50 K1 K2 K4 K2 0.50
A A
0.50 KP KP 0.50
1.00
1 2 2' 3 4 5 6 6' 7 8
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH PEMBALOKKAN Number Date
2024 LANTAI - 2
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-16 52
1 2 3 4 5 6 7 8
9.50 3.50 9.50
3.00 3.00 3.50 3.50 3.00 3.00
F F
B2 B2 B2 B2 B2 B2 B2
20x35
20x35
20x35
20x35
20x35
20x35
20x35
20x35
20x35
20x35
20x35 20x35 20x35 20x35 20x35 20x35 20x35
B2
B2
B2
B2
B2
B2
B2
B2
B2
B2
1.50 1.50
E KP E
B2 B2 B2 B2 B2 B2 KP B2
15x20
15x20
B6
B6
20x35
1.50 20x35 20x35 20x35 20x35 20x35 20x35 20x35 1.50
B2
KP KP
D' D'
20x35
B6 20x35
20x35
20x35
20x35
20x35
20x35
KP KP
KP
B2
B2
B2
B2
B2
B2
B2
B6 B6 KP
3.30 KP 3.30
15x20 15x20
15x20
15x20
B6
1.80 1.80
KP KP
D D
B2 B2 B2 B2 B2 B2 B2
1.20 1.20
20x35
20x35 20x35 20x35 20x35 20x35 20x35 20x35
B2
C' KP KP
KP
KP
C'
20x35
20x35
20x35
20x35
20x35
20x35
20x35
B2
B2
B2
B2
B2
B2
B2
3.70 3.70
2.50 2.50
B2 B2 B2 B2 B2 B2 B2
20x35
20x35 20x35 20x35 20x35 20x35 20x35 20x35
B2
C C
20x35
20x35
20x35
20x35
20x35
20x35
20x35
B2
B2
B2
B2
B2
B2
B2
1.50 B2 3.70 B2 1.50
B5 B5
15x50 20x35 20x35 15x50
B5 B2 B5
B 15x50 20x35 15x50
B
0.50 0.40 0.50
A KP KP A
0.50 0.40 KP KP
0.25
0.60 1.85 0.60
3.65
1 2 2' 3 4 5 6 7 8
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH PEMBALOKKAN Number Date
2024 LANTAI - DAK
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-17 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20
F F
B7 B7 B7 B7 B7 B7 B7
15x20
15x20
15x20
15x20
15x20
15x20
15x20
15x20
15x20 15x20 15x20 15x20 15x20 15x20 15x20
B7
B7
B7
B7
B7
B7
B7
B7
1.50 1.50
E E
B7 B7 B7 B7 B7 B7 B7
15x20 15x20 15x20 15x20 15x20 15x20 15x20
1.50 1.50
D' D'
15x20
15x20
15x20
15x20
15x20
15x20
15x20
15x20
B7
B7
B7
B7
B7
B7
B7
B7
3.30 3.30
1.80 1.80
10.00
D D
B7 B7 B7 B7 B7 B7 B7
1.20 15x20 15x20 15x20 15x20 15x20 15x20 15x20 1.20
C' C'
15x20
15x20
15x20
15x20
15x20
15x20
15x20
15x20
3.70 3.70
B7
B7
B7
B7
B7
B7
B7
B7
2.50 2.50
C C
B7 B7 B7 B7 B7 B7 B7
15x20
15x20
15x20
15x20
15x20
15x20
15x20
15x20
15x20 15x20 15x20 15x20 15x20 15x20 15x20
1.50 1.50
B7
B7
B7
B7
B7
B7
B7
B7
FFL -0.05
B B
0.50 B7 B7 B7 B7 0.50
A 15x20 15x20 15x20 15x20 A
B7 B7 B7
15x20 15x20 15x20
1 2 2' 3 4 5 6 6' 7 8
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH PERLETAKKAN PINTU & JENDELA Number Date
2024 LANTAI - 2
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-18 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20
J2 J2
F F
P2 Bordes P2
1.50 R.Cuci R.Jemur 10 R.Jemur R.Cuci 1.50
J2 V1 V1 J2
E E
KM/WC Dapur Dapur
FFL 11 9 FFL
KM/WC
1.50 1 ±0.00 ±0.00 1 1.50
P4 12 8 P4
V2 V2
13 7
Kamar Tidur Utama Kamar Tidur Utama
D' FFL ±0.00
14 6 FFL ±0.00 D'
15 5
3.30 3.30
4
1.80 KM/WC 2 3
KM/WC 2 1.80
FFL -0.05 FFL -0.05
R. Makan 2 R. Makan
FFL ±0.00 FFL ±0.00
1
D P3 P3
D
P4 P4
P3 P3
1.20 1.20 1.20
P3 P3
NK
C' C'
R. R.
3.70 Keluarga Keluarga 3.70
FFL ±0.00 FFL ±0.00
Kamar Tidur 3 Kamar Tidur 3
2.50 FFL ±0.00 FFL ±0.00
2.50
Kamar Tidur 2 Kamar Tidur 2
FFL ±0.00 FFL ±0.00
C C
J1 J1 J1 J1
B B
0.50 0.50
A A
P5
1 2 2' 3 4 5 6 6' 7 8
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH PERLETAKKAN PINTU & JENDELA Number Date
2024 LANTAI - 1
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-19 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20
J2 J3 J2
F F
P2 Bordes P2
1.50 R.Cuci R.Jemur 10 R.Jemur R.Cuci 1.50
J2 V1 V1 J2
E E
Dapur Dapur
KM/WC FFL FFL
KM/WC
11 9
1.50 1 ±0.00
8
±0.00 1 1.50
P4 12 P4
V2-0.05
FFL V2
13 7
Kamar Tidur Utama Kamar Tidur Utama
D' FFL ±0.00
14 6 FFL ±0.00 D'
15
3.30 3.30
16
1.80 KM/WC 2 17
KM/WC 2 1.80
FFL -0.05 FFL -0.05
R. Makan 18 R. Makan
FFL ±0.00 FFL ±0.00
19
D P3
20
P3
D
P4 P4
P3 P3
1.20 1.20
P3 P3
Trn
C' 25 C'
R. R.
3.70 Keluarga Keluarga 3.70
FFL ±0.00 FFL ±0.00
Kamar Tidur 3 Kamar Tidur 3
2.50 FFL ±0.00 FFL ±0.00
2.50
Kamar Tidur 2 Kamar Tidur 2
FFL ±0.00 FFL ±0.00
C C
J1 J1 J1 J1
B J5 J5 B
0.50 0.50
A A
1 2 2' 3 4 5 6 6' 7 8
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH PERLETAKKAN PINTU & JENDELA Number Date
2024 LANTAI - 2
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-20 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20
J2 J3 J2
F F
P2 Bordes P2
1.50 R.Cuci R.Jemur 10 R.Jemur R.Cuci 1.50
J2 V1 V1 J2
E E
Dapur Dapur
KM/WC FFL 11 9 FFL
KM/WC
1.50 1 ±0.00 ±0.00 1 1.50
P4 12 8 P4
V2-0.05
FFL V2
13 7
Kamar Tidur Utama Kamar Tidur Utama
D' FFL ±0.00
14 6 FFL ±0.00 D'
15
3.30 3.30
16
1.80 KM/WC 2 17
KM/WC 2 1.80
FFL -0.05 FFL -0.05
R. Makan 18 R. Makan
FFL ±0.00 FFL ±0.00
19
D P3
20
P3
D
P4 P4
P3 P3
1.20 1.20
P3 P3
Trn
C' 25 C'
R. R.
3.70 Keluarga Keluarga 3.70
FFL ±0.00 FFL ±0.00
Kamar Tidur 3 Kamar Tidur 3
2.50 FFL ±0.00 FFL ±0.00
2.50
Kamar Tidur 2 Kamar Tidur 2
FFL ±0.00 FFL ±0.00
C C
J1 J1 J1 J1
B J5 J5 B
0.50 0.50
A A
1 2 2' 3 4 5 6 6' 7 8
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH PERLETAKKAN PINTU & JENDELA Number Date
2024 LANTAI - 2
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-21 52
Detail Pintu Type P1 (6 unit) Skala 1:25 Detail Pintu Type P2 (6 unit) Skala 1:25 Detail Pintu Type P3 (18 unit) Skala 1:25 Detail Pintu Type P4 (12unit) Skala 1:25
Lokasi Lokasi Lokasi Lokasi
Teras depan - R. Keluarga 4 unit Dapur - Teras belakang 4 unit Kamar tidur utama 4 unit Kamar mandi / WC 1 6 unit
Kamar tidur 2 4 unit Kamar mandi / WC 2 6 unit
Kamar tidur 3 4 unit
5 5
5 5 5
265 265
Pintu
Aluminium
210 210 210
5 90 5 5 80 5 5 80 5
70
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DETAIL PINTU Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-22 52
Detail Pintu Type J1 (12 unit) Skala 1:25 Detail Pintu Type J2 (12 unit) Skala 1:25 Detail Pintu Type J3 Skala 1:25 Detail Pintu Type J5 (2 Unit) Skala 1:25
Lokasi Lokasi Lokasi Lokasi
8 unit Ruang Tangga Ruang Tangga
RELIEF
5 5
5 5
20 Kaca 138
5 mm
20
Kaca
5 mm 138
85
5
30 (2 UNIT)
ML ± 0.00 ML ± 0.00
KACA GLASS
BLOCK
5 60 5 60 5 5 60 5 60 5 20x20
5 50 5
60
(6 UNIT)
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DETAIL JENDELA Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-23 52
Detail Pintu Type V1(6 unit) Skala 1:25 Detail Pintu Type P5 (1 unit) Skala 1:25
Lokasi 60 60 60 60
Lokasi 10 40 10 10 40 10 10 40 10 10 40 10
Kamar mandi / WC 1 4 unit 1 unit 5 10 10 20 10 10 10 10 20 10 10 5 5 10 10 20 10 10 10 10 20 10 10 5
5 5
10 10
25 45 25 45
Besi Nako/Kotak
10 10
15 mm x 15 mm 5 5
Hollow 3 x 9 cm 10 10
Hollow 3 x 9 cm Besi Siku L.40.40 5
15 15 10 10
5 Relief
15 15 15
5 30
Kaca Kaca 45 55 58
5 mm 5 mm Relief 10
120
10
5
10 30
175
10
10
10
5
5 30 35 5 30 35 58 Besi Nako/Kotak
12 mm x 12 mm Besi Siku L.20.20
Hollow
3 x 9 cm 10 5
0 5 10 10 10 10 10 10 5 10 10 10 10 10 10 5
10
250255 60 60
10
210 Besi Nako/Kotak
Besi Siku L.20.20 12 mm x 12 mm
5 10 10 10 10 10 10 5 10 10 10 10 10 10 5
60 60
JERJAK JENDELA JERJAK JENDELA
Pintu Type J1 (8 unit) Pintu Type J2 (8 unit)
Plat t = 1,6 mm Plat t = 1,6 mm 40
ML ± 0.00
60 60
15 15 10 40 10 10 40 10
5 10 10 20 10 10 5 10 10 20 10 10 5
Detail Pintu Type V2 (4 unit) Skala 1:25 5 5
10 10
Lokasi 5 Relief 5
45 25 25 45
100 100
Kamar mandi / WC 2 4 unit
15 10 10
200
5 5
Besi Nako/Kotak
5 12 mm x 12 mm Besi Siku L.20.20
Kaca 55 45 55
Buram JERJAK JENDELA
5 Pintu Type V1 (4 unit)
5 70
60
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DETAIL JERJAK JENDELA Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-24 52
Detail Pintu Type J4 (2 unit) Skala 1:25
Lokasi
R..KELUARGA 1 unit
15 15
5 Relief 5 Relief
1 2
15 15 15 15
5 5
158
5 5
158 158
5 5
158
Jendela Bisa
50 dibuka
4 4
5 985 5 985
158 158
5 5
103
Kaca Kaca Kaca
5 mm 5 mm 5 mm
158
Jendela Bisa
Kaca Kaca Kaca dibuka
5 mm 5 mm 5 mm 50
5 5
5 5
15 15
5 5
1 2
POT 3 - 3
5
15 5 60 5 60 5 60 5 15 POT 1 - 1 POT 2 - 2
200 Relief
230
POT 4 - 4
5
15 5 60 5 60 5 60 5 15
200 Relief
230
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Re-Drawn By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES DETAIL JENDELA Number Date
2022
STA RESOURCES Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF Paper Size: Drawing Number: Sheet Number:
S/G2/KBR/13 A3 ARS-25 26
K1 K1 K1 K1 K1 K1 K1 K1 K1
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20
F F
1.50 R.Jemur R.Jemur 1.50
E E
Dapur Dapur
KM/WC FFL FFL
KM/WC
1.50 1 ±0.00 ±0.00 1 1.50
FFL -0.05
D D
1.20 1.20
Trn
C' C'
R. R. Kamar Tidur 2
3.70 Keluarga Keluarga FFL ±0.00 3.70
FFL ±0.00 FFL ±0.00
Kamar Tidur 3 Kamar Tidur 3
2.50 FFL ±0.00 FFL ±0.00
2.50
C C
1.50 FFL -0.05 1.50
B K2 K3 K2 B
0.50 0.50
A A
1 2 2' 3 4 5 6 6' 7 8
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH KAP ATAP Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS - 26 52
Rabung SNI Ex.PT.HRKS (Primadeck Type Spanrib)
t = 0.25 mm Warna Merah Maron
C.75 t = 0.70 mm
60
60
689
245
60
60
60
60
60
60
150 150 150
1000
100 100
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DETAIL KUDA - KUDA K1
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-27 52
Rabung SNI Ex.PT.HRKS (Primadeck Type Spanrib)
t = 0.25 mm Warna Merah Maron
Atap Seng Metal SNI Ex.PT.HRKS (Primadeck Type
Spanrib) t = 0.25 mm Warna Merah Maron
Rangka Atap Baja Ringan SNI Ex.PT.HRKS Primatruss
C.75 t = 0.70 mm
60 Reng SNI Ex.HRKS Primatruss RT.25 t = 0.45 mm
82 304
60
60
60
100 100
C.75 t = 0.70 mm
60 Reng SNI Ex.HRKS Primatruss RT.25 t = 0.45 mm
93 331
60
60
60
100 100
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DETAIL KUDA KUDA K2 & K3
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-28 52
560
245
Ring balok 15x20 cm
GABLE - G1
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk GABLE ( TEMBOK LAYER)
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-29 52
2 1 2 1
4 5 4 5
3.50 3.50
F F
Bordes Bordes
1.50 1.50
1.98
10 1.98
10
E E
0.50
11 9 0.30 11 9
Ring Balok 15x15
4.80 12 8 4.80 0.30 12 8
13 7 0.30 7
14 6 0.30 14 6
3.30 3.30
15 5 0.30 15 1.425
D13-150
4 0.30 16 4 Struktur Tangga 6
Pasang Keramik
3 0.30 17 3 5
30 30
2 Pondasi Tangga 0.30 18 2 4
30x72
0.30 1 0.30 19 1 100
17.5 3
0.25 D 20 D
17.5 2
Sloof D13-150
25x30 NK 1 TRN NK 1
D13-150
1.57 0.20 1.57 1.57 0.20 1.57 FFL ±0.00 FFL ±0.00
42
25
72
59
2 1 2 1
30 Pondasi Tangga
30x72
D
DENAH TANGGA DETAIL -1
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH TANGGA
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-30 52
2 1
4 5
3.50
Bordes
1.50
1.98
10
E
0.50
0.30 11 9
4.80 0.30 12 8
0.30 13 7
0.30 14 6
3.30
0.30 15
0.30 16
0.30 17
0.30 18
0.30 19
20 D
1.92
TRN
1.57 0.20 1.57
2 1
DENAH TANGGA
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH TANGGA
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-31 52
Ring Balok 15x15
Struktur
Ring Balok Tangga 3.09 1.00
1.00 3.09 15x15
Pasang
1.00
Keramik 20 FFL+3.55
20
19
19 D13-150
18
18
17
17 D13-150
16
16
0.30 15
15 Relief
14
14
13
13 D13-150 1.00 D13-150
12 D13-150 0.17512 3.13
3.13 Glass Block 11
11
Struktur FFL +1.80 10 0.175
10 FFL +1.80
Tangga 3.50 3.50 9
9
D13-150 8
Pasang 8
1.90 7
Keramik 7
D13-150 1.90 6
6
Ring Balok 15x15 5
5
0.30 4
4 1.00
1.00 Struktur 3
3 Ring Balok D13-150
1.00 0.175 3.09 15x15 Tangga 3.09 2 1.00
2
1
1 Pasang
FFL+3.55 20 FFL ±0.00Keramik 20 FFL+3.55
19
FFL ±0.00 19
D13-150
18 18
17 17
D13-150
16 16
15 Relief 0.30 15
14 1.75 14
13 Glass Block 13
12 D13-150 D13-150 1.00 D13-150
3.13 0.17512 3.13
11 11
Struktur 10 FFL +1.80 FFL +1.80 10 0.175
Tangga 9 0.053.50 3.50 9
D13-150 0.12 0.20
Pasang 8 8
Keramik 7 1.90 7
D13-150 1.90
6 6
5 5
0.30 1.75 1.75
4 4
1.00 3 D13-150 3 1.00
0.175
2 2
1 1
POTONGAN 1 - 1 POTONGAN 2 - 2
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk POTONGAN TANGGA
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-32 52
Besi Strip 1 x 5 cm
12
A B C
78 100
10
23 20 20 20 20 20 20 20 20 20 20 20 20 23
43 100 100 43
KEYPLAN
12 12
78 100 78 100
10 10
21 21 20 20 20 20 20 20 20 20 20 20 21 21 22 21 20 20 20 20 20 21 22
42 100 100 42 43 100 43
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DETAIL RAILING PAGAR
Number Date
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-33 52
40 45
Elev. +305 15
Elev. +300
Plafond Gypsum SNI Ex.Jaya board t = 9 mm
+ Rangka Furing SNI Ex.PT.MGM(Mahkota)
t = 0.35 mm
50 15
Kaca Kaca
5 mm 5 mm
305
22
30 30
Pasangan Batu Bata Diplester + Aci
17
25 1 25
350 150 150
300
POTONGAN 1 - 1 POTONGAN 2 - 2
2 2
3.00
Dapur
FFL
±0.00
KEYPLAN
1
3.50
Drawing
1 Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DETAIL DAPUR Number Date
LANTAI - 1
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-34 52
35 40
20 20 20 20
Elev. +305 15
Elev. +300
Plafond Gypsum SNI Ex.Jaya board t = 9 mm
+ Rangka Furing SNI Ex.PT.MGM(Mahkota)
t = 0.35 mm
50 15
Kaca Kaca
5 mm 5 mm
305
±0.00
-0.05 5 5
60 225
131 60 40
350 1
25
POTONGAN 2 - 2
LANTAI - 2
2 2
3.00
Dapur
FFL
±0.00
KEYPLAN
1
3.50
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DETAIL DAPUR Number Date
LANTAI - 2
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-35 52
Elev. +305 15
Elev. +300
Plafond Gypsum SNI Ex.Jaya board t = 9 mm
+ Rangka Furing SNI Ex.PT.MGM(Mahkota)
t = 0.35 mm
50 15
Kaca Kaca
5 mm 5 mm
305
±0.00
-0.05 5 5
60 225
131 60 40
350 1
25
POTONGAN 2 - 2
LANTAI - 2
2 2
3.00
Dapur
FFL
±0.00
KEYPLAN
1
3.50
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DETAIL DAPUR Number Date
2024 LANTAI - 3
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-36 52
2 3 4 5 6
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20
F F
Bordes
1.50 R.Cuci R.Jemur 10 R.Jemur R.Cuci 1.50
E E
Dapur Dapur
KM/WC FFL 11 9 FFL
KM/WC
1.50 1 ±0.00
8
±0.00 1 1.50
12
FFL -0.05 FFL -0.05
13 7
Kamar Tidur Utama Kamar Tidur Utama
D' FFL ±0.00
14 6 FFL ±0.00 D'
15 5
3.30 3.30
4
1.80 KM/WC 2 3
KM/WC 2 1.80
FFL -0.05 FFL -0.05
R. Makan 2 R. Makan
FFL ±0.00 FFL ±0.00
1
D D
1.20 1.20
1 NK
C' C'
R. R.
1 3.70 Keluarga Keluarga 3.70 1
FFL ±0.00 FFL ±0.00
Kamar Tidur 3 Parkir Sepeda Kamar Tidur 3
2.50 FFL ±0.00 FFL ±0.00
2.50
Kamar Tidur 2 Motor Kamar Tidur 2
FFL ±0.00 FFL ±0.00
C C
1.50 FFL -0.05 FFL -0.05 1.50
B B
0.50 0.50
A A
2 3 4 5 6
1 2 2' 3 4 5 6 6' 7 8
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH PEMASANGAN KERAMIK
Number Date
2024 1:10
LANTAI -1
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-37 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20
F F
Bordes
1.50 R.Cuci R.Jemur 10 R.Jemur R.Cuci 1.50
E E
Dapur Dapur
KM/WC FFL 9 FFL
KM/WC
11
1.50 1 ±0.00 ±0.00 1 1.50
12 8
FFL -0.05 FFL -0.05
13 7
Kamar Tidur Utama Kamar Tidur Utama
D' FFL ±0.00
14 6 FFL ±0.00 D'
15
3.30 3.30
16
1.80 KM/WC 2 17
KM/WC 2 1.80
FFL -0.05 FFL -0.05
R. Makan 18 R. Makan
FFL ±0.00 FFL ±0.00
19
D 20 D
1.20 1.20
2 Trn
C' C'
R. R.
3.70 Keluarga Keluarga 3.70
FFL ±0.00 FFL ±0.00
C C
1.50 FFL -0.05 FFL -0.05 1.50
B B
0.50 0.50
A A
1 2 2' 3 4 5 6 6' 7 8
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH PEMASANGAN KERAMIK
Number Date
2024 1:10
LANTAI -2
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-38 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20
F F
Bordes
1.50 R.Cuci R.Jemur 10 R.Jemur R.Cuci 1.50
E E
Dapur Dapur
KM/WC FFL 11 9 FFL
KM/WC
1.50 1 ±0.00 ±0.00 1 1.50
12 8
FFL -0.05 FFL -0.05
13 7
Kamar Tidur Utama Kamar Tidur Utama
D' FFL ±0.00
14 6 FFL ±0.00 D'
15
3.30 3.30
16
1.80 KM/WC 2 17
KM/WC 2 1.80
FFL -0.05 FFL -0.05
R. Makan 18 R. Makan
FFL ±0.00 FFL ±0.00
19
D 20 D
1.20 1.20
2 Trn
C' C'
R. R.
3.70 Keluarga Keluarga 3.70
FFL ±0.00 FFL ±0.00
Kamar Tidur 3 Kamar Tidur 3
2.50 FFL ±0.00 FFL ±0.00
2.50
Kamar Tidur 2 Kamar Tidur 2
FFL ±0.00 FFL ±0.00
C C
1.50 FFL -0.05 FFL -0.05 1.50
B B
0.50 0.50
A A
1 2 2' 3 4 5 6 6' 7 8
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH PEMASANGAN KERAMIK
Number Date
2024 1:10
LANTAI -2
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-39 52
Keramik Lantai 20 x 20 cm
Ex.Roman
Elev. +305
Plafond Gypsum SNI Ex.Jaya board t = 9 mm
t+=Rangka
0.35 mm
Furing SNI Ex.PT.MGM(Mahkota)
Plafond
+ RangkaGypsum
Furing SNI Ex.Jaya
t = 0.35 mm
Ex.PT.MGM(Mahkota)
board t = 9 mm
0.70
Kaca Kaca
5 mm 5 mm
1 KM/WC 1
1 +0.10 Keramik 20 x 40 cm t = 200 cm Keramik 20 x 40 cm t = 200 cm
-0.05 1.50
Ex.Roman Ex.Roman
Kaca Buram
Keramik 20 x 40 cm t = 200 cm
Ex.Roman
305 305
KM/WC
2
-0.05 +0.10 1.80
2
1.80 Kloset Jongkok
Bak Air Bak Air
Ex. Toto
Fibre Fibre
DENAH KM/WC LT-1
Keramik Lantai 20 x 20 cm
Ex.Roman 70
+0.10 +0.10 +0.10
±0.00
-0.05 5
20 25
30 30 30 30 30
25 25 25 25 25
POTONGAN 1 - 1 POTONGAN 2 - 2
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk Number Date
DENAH & POTONGAN KM/WC LANTAI - 1
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-40 52
Keramik Lantai 20 x 20 cm
Ex.Roman
2
Kaca Kaca
5 mm 5 mm
1 KM/WC 1
1 +0.10
-0.05 1.50
Keramik 20 x 40 cm t = 200 cm
KM/WC Ex.Roman 350
2
-0.05 +0.10 1.80
2
1.80
Kloset Jongkok
DENAH KM/WC LT-2 Ex. Toto
Bak Air Bak Air
Fibre Fibre
Keramik Lantai 20 x 20 cm
Ex.Roman 70
+0.10 +0.10 +0.10
-0.05
POTONGAN 1 - 1 POTONGAN 2 - 2
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk Number Date
DENAH & POTONGAN KM/WC LANTAI - 2
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-41 52
Keramik Lantai 20 x 20 cm
Ex.Roman
2
Kaca Kaca
5 mm 5 mm
1 KM/WC 1
1 +0.10
-0.05 1.50
Keramik 20 x 40 cm t = 200 cm
KM/WC Ex.Roman
2
-0.05 +0.10 1.80
2
1.80
Kloset Jongkok
DENAH KM/WC LT-2 Ex. Toto
Bak Air Bak Air
Fibre Fibre
Keramik Lantai 20 x 20 cm
Ex.Roman 70
+0.10 +0.10 +0.10
-0.05
POTONGAN 1 - 1 POTONGAN 2 - 2
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk Number Date
DENAH & POTONGAN KM/WC LANTAI - 2
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-42 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20
F F
Bordes
1.50 R.Cuci R.Jemur 10 R.Jemur R.Cuci 1.50
E E
Dapur Dapur
KM/WC FFL 11 9 FFL
KM/WC
1.50 1 ±0.00
8
±0.00 1 1.50
12
FFL -0.05 FFL -0.05
13 7
Kamar Tidur Utama Kamar Tidur Utama
D' FFL ±0.00
14 6 FFL ±0.00 D'
15 5
3.30 3.30
4
1.80 KM/WC 2 3
KM/WC 2 1.80
FFL -0.05 FFL -0.05
R. Makan 2 R. Makan
FFL ±0.00 FFL ±0.00
FFL ±0.00
1
D D
1.20 1.20
NK
C' C'
R. R.
3.70 Keluarga Keluarga 3.70
Kamar Tidur 2 FFL ±0.00 FFL ±0.00 Kamar Tidur 2
2.50
FFL ±0.00 Kamar Tidur 3 Parkir Sepeda Kamar Tidur 3 FFL ±0.00
2.50
FFL ±0.00 FFL ±0.00
Motor
C C
1.50 1.50
B B
0.50 0.50
A A
1 2 2' 3 4 5 6 6' 7 8
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk Number Date
DENAH PLAFOND LANTAI - 1
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-43 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20
F F
1.50 R.Cuci R.Jemur R.Jemur R.Cuci 1.50
E E
Dapur Dapur
KM/WC FFL FFL
KM/WC
1.50 1 ±0.00 ±0.00 1 1.50
FFL -0.05 FFL -0.05
D D
1.20 1.20
C' C'
R.
R. R.
3.70 Keluarga
Keluarga Keluarga 3.70
Kamar Tidur 2 FFL
FFL±0.00
±0.00 FFL ±0.00 Kamar Tidur 2
2.50
FFL ±0.00 Kamar Tidur 3 Kamar Tidur 3 FFL ±0.00
2.50
FFL ±0.00 FFL ±0.00
C C
1.50 FFL -0.05 FFL -0.05 1.50
B B
0.50 0.50
A A
1 2 2' 3 4 5 6 6' 7 8
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk Number Date
DENAH PLAFOND LANTAI - 2 1:10
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-44 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20
F F
1.50 R.Cuci R.Jemur R.Jemur R.Cuci 1.50
E E
Dapur Dapur
KM/WC FFL FFL
KM/WC
1.50 1 ±0.00 ±0.00 1 1.50
FFL -0.05 FFL -0.05
D D
1.20 1.20
C' C'
R.
R. R.
3.70 Keluarga
Keluarga Keluarga 3.70
Kamar Tidur 2 FFL
FFL±0.00
±0.00 FFL ±0.00 Kamar Tidur 2
FFL ±0.00 Kamar Tidur 3 Kamar Tidur 3 FFL ±0.00
2.50 FFL ±0.00 FFL ±0.00
2.50
C C
1.50 FFL -0.05 FFL -0.05 1.50
B B
0.50 0.50
A A
1 2 2' 3 4 5 6 6' 7 8
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk Number Date
DENAH PLAFOND LANTAI - 2 1:10
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-45 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20
F F
R.Jemur
1.50 R.Cuci Dapur Dapur R.Cuci 1.50
POMPA AIR R.Jemur
Bordes
E 10 E
KM/WC 1 Dapur
11 9
KM/WC
1.50 8 1 1.50
12
13 7
Kamar Tidur Kamar TidurKamarUtamaTidur
D' Utama
14 6 FFL ±0.00
Utama D'
KM/WC 2 15 5
3.30 3.30
4
1.80 EXHAUST 3 EXHAUST KM/WC 2 1.80
R. Makan R. Makan FAN
FAN 2
1
D D
1.20 1.20
NK
C' Parkir Sepeda C'
R. R.
Motor 1
3.70 Keluarga Keluarga 3.70
FFL ±0.00 FFL ±0.00
Kamar Tidur 3 Kamar Tidur 3
2.50 2.50
Kamar Tidur 2 Kamar Tidur 2
C C
1.50 1.50
B B
0.50 0.50
A A
Stop Stop
Lampu Lampu Saklar Saklar Ceiling Exhaust Distribution MCB KWH Kabel
Item kontak kontak Antena
LED LED tunggal ganda fan fan Box 6A Meter Antena
tunggal ganda
3.00 3.00 3.50 3.50 3.50
Kode
1 2 2' 3 4 5 6 Spesifikasi
Download
9 watt
Droff
9 watt
Download
6 watt
Level
+150
Level
+150
Level +30 Level +30
Level
+250
Level
+250
Level +60
Teras 12 3 - - - - - - - - - 6 - -
R. Keluarga 6 - - 6 6 12 - 6 - 6 6 - 6 -
R. Makan 6 - - - 6 - 6 - - - - - - -
Dapur 6 - - - 6 6 - - -
Kamar tidur 1 6 - - 6 - - 6 6 - - - - - -
Kamar tidur 2 6 - - 6 - - 6 6 - - - - - -
Kamar tidur 3 6 - - 6 - 6 - 6 - - - - - -
Koridor 6 - - - - - - - - - - - - -
KM / WC 1 - - 6 6 - - - - - - - - - -
KM / WC 2 - - 6 6 - - - - 6 - - - - -
R.Jemur 6 - - - - - - - - - - - - 6
Total : 67 3 12 36 23 31 18 24 6 6 7 6 6 6
Keterangan:
Lampu LED merk ex.Phillips, Saklar & Stop Kontak merk ex. Panasonic , Kabel NYA 1,5 mm2 & 2.5 mm2 merk ex.Supreme , Box Panel MCB +
MCB 6 A merk ex. Sneider
Harap diperhatikan posisi kolom & struktur bangunan sebelum memasang jalur elektrikal
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH INSTALASI LISTRIK Number Date
2024 LANTAI - 2
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-46 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20
Posisi antena disesuaikan di lokasi Posisi antena disesuaikan di lokasi
F F
Bordes
1.50 R.Cuci R.Jemur 10 R.Jemur R.Cuci 1.50
E E
Dapur Dapur
KM/WC 11 9
KM/WC
1.50 1 1 1.50
12 8
13 7
Kamar Tidur Utama Kamar Tidur Utama
D' 14 6 D'
15
3.30 3.30
16
1.80 KM/WC 2 EXHAUST 17 EXHAUST KM/WC 2 1.80
FAN R. Makan 18 R. Makan FAN
19
D 20 D
1.20 1.20
Trn
C' C'
R. R.
3.70 Keluarga Keluarga 3.70
Kamar Tidur 3 Kamar Tidur
Kamar
3 Tidur 3
2.50 2.50
Kamar Tidur 2 Kamar Tidur 2
C C
1.50 1.50
B B
0.50 0.50
A A
1 2 2' 3 4 5 6 6' 7 8
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH INSTALASI LISTRIK Number Date
2024 LANTAI - 2
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-47 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
4.20 1.80 3.50 3.50 1.80 4.20
Posisi antena disesuaikan di lokasi Posisi antena disesuaikan di lokasi
F F
Bordes
1.50 R.Cuci R.Jemur 10 R.Jemur R.Cuci 1.50
E E
Dapur Dapur
KM/WC 11 9
KM/WC
1.50 1 1 1.50
12 8
13 7
Kamar Tidur Utama Kamar Tidur Utama
D' 14 6 D'
15
3.30 3.30
16
1.80 KM/WC 2 EXHAUST 17 EXHAUST KM/WC 2 1.80
FAN R. Makan 18 R. Makan FAN
19
D 20 D
1.20 1.20
Trn
C' C'
R. R.
3.70 Keluarga Keluarga 3.70
Kamar Tidur 3 Kamar Tidur
Kamar
3 Tidur 3
2.50 2.50
Kamar Tidur 2 Kamar Tidur 2
C C
1.50 1.50
B B
0.50 0.50
A A
1 2 2' 3 4 5 6 6' 7 8
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH INSTALASI LISTRIK Number Date
2024 LANTAI - 2
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-48 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
PIPA Ø3/4" (Ab Inlet) PIPA Ø3/4" (Ab Inlet)
4.20 1.80 3.50 3.50 1.80 4.20
PIPA Ø3" (AB) PIPA Ø3" (AB) PIPA Ø3" PIPA Ø3" PIPA Ø3" (AB) PIPA Ø3" (AB)
PIPA Ø4" (AK) PIPA Ø4" (AK)
PIPA Ø2" (Ab outlet) PIPA Ø2" (Ab outlet)
F FD FD FD
F
R.Cuci Bordes
1.50 R.Jemur PIPA Ø34" PIPA Ø34" R.Jemur R.Cuci 1.50
10
PIPA Ø34" PIPA Ø34"
E E
PIPA Ø1/2" Dapur DapurPIPA Ø1/2"
KM/WC FFL 11 9 FFL
KM/WC
1.50 1 ±0.00 ±0.00 1 1.50
12 8
FFL -0.05 FFL -0.05
FD 13 7 FD
Kamar Tidur Utama Kamar Tidur Utama
D' FFL ±0.00
FD
14 6
FD
FFL ±0.00 D'
15
3.30 3.30
16
1.80 KM/WC 2 17
KM/WC 2 1.80
FFL -0.05 FFL -0.05
R. Makan 18 R. Makan
FFL ±0.00 FFL ±0.00
19
D 20 D
1.20 1.20
Trn
C' 25 C'
R. R.
3.70 Keluarga Keluarga 3.70
FFL ±0.00 FFL ±0.00
Kamar Tidur 3 Kamar Tidur 3
2.50 FFL ±0.00 FFL ±0.00
2.50
Kamar Tidur 2 Kamar Tidur 2
FFL ±0.00 FFL ±0.00
C C
1.50 FFL -0.05 FFL -0.05 1.50
FD FD
B B
0.50 0.50
A A
Keterangan:
Air bersih (Ab) Pipa PVC 1/2" & 34" & 2"
1 2 2' 3 4 5 6 6' 7 8
Catatan :
Instalasi Air Kotor PVC Ø4" & Dan Air Buangan memakai Pipa Ø3" D merk ex.Invilon atau Wavin
Sanitair Fixture : Kloset Jongkok merk Toto , Floor Drain Ø3" merk ex.San Ei, Kran Air merk ex. Onda
Kitchen Sink 1 lubang S/S merk ex.Royal , Roof Drain S/S Ø3" merk San Ei
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH INSTALASI AIR Number Date
2024 LANTAI - 2
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-50 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
PIPA Ø3/4" (Ab Inlet) PIPA Ø3/4" (Ab Inlet)
4.20 1.80 3.50 3.50 1.80 4.20
PIPA Ø3" (AB) PIPA Ø3" (AB) PIPA Ø3" PIPA Ø3" PIPA Ø3" (AB) PIPA Ø3" (AB)
PIPA Ø4" (AK) PIPA Ø4" (AK)
PIPA Ø2" (Ab outlet) PIPA Ø2" (Ab outlet)
F FD FD FD
F
R.Cuci Bordes
1.50 R.Jemur PIPA Ø34" PIPA Ø34" R.Jemur R.Cuci 1.50
10
PIPA Ø34" PIPA Ø34"
E E
PIPA Ø1/2" Dapur DapurPIPA Ø1/2"
KM/WC FFL 11 9 FFL
KM/WC
1.50 1 ±0.00 ±0.00 1 1.50
12 8
FFL -0.05 FFL -0.05
FD 13 7 FD
Kamar Tidur Utama Kamar Tidur Utama
D' FFL ±0.00
FD
14 6
FD
FFL ±0.00 D'
15
3.30 3.30
16
1.80 KM/WC 2 17
KM/WC 2 1.80
FFL -0.05 FFL -0.05
R. Makan 18 R. Makan
FFL ±0.00 FFL ±0.00
19
D 20 D
1.20 1.20
Trn
C' 25 C'
R. R.
3.70 Keluarga Keluarga 3.70
FFL ±0.00 FFL ±0.00
Kamar Tidur 3 Kamar Tidur 3
2.50 FFL ±0.00 FFL ±0.00
2.50
Kamar Tidur 2 Kamar Tidur 2
FFL ±0.00 FFL ±0.00
C C
1.50 FFL -0.05 FFL -0.05 1.50
FD FD
B B
0.50 0.50
A A
Keterangan:
Air bersih (Ab) Pipa PVC 1/2" & 34" & 2"
1 2 2' 3 4 5 6 6' 7 8
Catatan :
Instalasi Air Kotor PVC Ø4" & Dan Air Buangan memakai Pipa Ø3" D merk ex.Invilon atau Wavin
Sanitair Fixture : Kloset Jongkok merk Toto , Floor Drain Ø3" merk ex.San Ei, Kran Air merk ex. Onda
Kitchen Sink 1 lubang S/S merk ex.Royal , Roof Drain S/S Ø3" merk San Ei
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH INSTALASI AIR Number Date
2024 LANTAI - 2
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-50 52
1 2 2' 3 4 5 6 6' 7 8
9.50 3.50 9.50
PIPA Ø3/4" (Ab Inlet) PIPA Ø3/4" (Ab Inlet)
4.20 1.80 3.50 3.50 1.80 4.20
PIPA Ø3" (AB) PIPA Ø3" (AB) PIPA Ø3" PIPA Ø3" PIPA Ø3" (AB) PIPA Ø3" (AB)
PIPA Ø4" (AK) PIPA Ø4" (AK)
PIPA Ø2" (Ab outlet) PIPA Ø2" (Ab outlet)
F FD FD FD
F
R.Cuci Bordes
1.50 R.Jemur PIPA Ø34" PIPA Ø34" R.Jemur R.Cuci 1.50
10
PIPA Ø34" PIPA Ø34"
E E
PIPA Ø1/2" Dapur DapurPIPA Ø1/2"
KM/WC FFL 11 9 FFL
KM/WC
1.50 1 ±0.00 ±0.00 1 1.50
12 8
FFL -0.05 FFL -0.05
FD 13 7 FD
Kamar Tidur Utama Kamar Tidur Utama
D' FFL ±0.00
FD
14 6
FD
FFL ±0.00 D'
15
3.30 3.30
16
1.80 KM/WC 2 17
KM/WC 2 1.80
FFL -0.05 FFL -0.05
R. Makan 18 R. Makan
FFL ±0.00 FFL ±0.00
19
D 20 D
1.20 1.20
Trn
C' 25 C'
R. R.
3.70 Keluarga Keluarga 3.70
FFL ±0.00 FFL ±0.00
Kamar Tidur 3 Kamar Tidur 3
2.50 FFL ±0.00 FFL ±0.00
2.50
Kamar Tidur 2 Kamar Tidur 2
FFL ±0.00 FFL ±0.00
C C
1.50 FFL -0.05 FFL -0.05 1.50
FD FD
B B
0.50 0.50
A A
Keterangan:
Air bersih (Ab) Pipa PVC 1/2" & 34" & 2"
1 2 2' 3 4 5 6 6' 7 8
Catatan :
Instalasi Air Kotor PVC Ø4" & Dan Air Buangan memakai Pipa Ø3" D merk ex.Invilon atau Wavin
Sanitair Fixture : Kloset Jongkok merk Toto , Floor Drain Ø3" merk ex.San Ei, Kran Air merk ex. Onda
Kitchen Sink 1 lubang S/S merk ex.Royal , Roof Drain S/S Ø3" merk San Ei
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk DENAH INSTALASI AIR Number Date
2024 LANTAI - 3
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-51 52
Pipa Hawa Besi/PVC Aw Ø1,5"
Besi Beton Ø8 mm
Besi Beton Ø8 mm
Pipa Hawa Besi/PVC Aw Ø1,5"
-0.17 -0.17
8 Muka Tanah -0.25 -0.25 Muka Tanah -0.25 -0.25 8 Muka Tanah -0.25
40
50 TANAH TIMBUNAN
20 PASIR URUG
180 Pipa Peresapan Ø3" 180
100
Pasangan 1/2 Bata
Pipa di Lubangi + Dibalut Ijuk + Sirtu
Beton K175 Beton K175
POTONGAN 1-1
POTONGAN 2-2
15
Peresapan
Ø8 - 150
100 100
Ø8 - 150
15
Drawing Title: Drawing Scale Revision Revision Description Re-Drawn By: Checked By: Checked By: Approved By: Approved By:
SUMBER TANI AGUNG RESOURCES Tbk Number Date
DETAIL SEPTICTANK & RESAPAN
2024
Jln. P. Diponegoro No. 51 - Medan - Sumatera Utara
STA RESOURCES Tbk Note:
FI ASL MM WTY SW
Project:
RUMAH G2 STAFF 3 LANTAI Paper Size: Drawing Number: Sheet Number:
G2.3LT/STOF/CIV/III/2024/SU/0 A3 ARS-52 52