HA - Estimation Sheet - 01
HA - Estimation Sheet - 01
HA - Estimation Sheet - 01
Unit Total
Item Rate Amount
N.B. All items must be Geometric
measured.
The inclination surfaces are
measured on the horizontal surface.
Plain Concrete
a. For foundations
M3 550 0
b. For track bed, inspection pits,
electrical trench, gutter drain, pressure
relief groove, bases of camera post,
cable well, assembly well and cable
inspection chamber, indoor hand hole
for telecommunication below raised
floor or into the S.O.G .. etc.
M3 -
c. For plain concrete under tank.
M3 -
Description Unit Qty. Unit Total
Item Rate Amount
4.02 Plain concrete for sub–flooring of grade
20 of minimum 28 days strength = 200
kg/cm² and minimum cement content
250 kg cement/m³ of concrete using
Portland cement including joints
between sub–flooring plain concrete
and underground bricks, or
underground R.C elements as per
drawings.
Rate per square meter
M3 -
Description Unit Qty. Unit Total
Item Rate Amount
d. For equipment bases above the
finish level (fair faced).
M3 -
Description Unit Qty. Unit Total
Item Rate Amount
4.04 Reinforced concrete of grade 35 of
minimum characteristic strength 350
kg/cm2 and minimum cement content =
450 kg cement/m3 of concrete using
Portland cement. (Excluding steel
reinforcement).
Rate per cubic meter
STRUCTURAL STEEL
T -
7.02 Supply and installation of main
structural steel grade 52 painted with
fire resistant caoting mesured in items
(7.06&7.07) .
Rate per ton
T -
7.03 Supply and install steel cover for
maintenance walkway at roof, catwalk
and door access platform (dimension
and thickness as per drawings).
Rate per square meter
L.M -
7.05 Supply & install galvanized steel ladder
including steel structure with cage.
Rate per linear meter
L.M -
7.06 Supply & install galvanized inclined
steel ladder including steel structure.
Rate per linear meter
L.M -
7.07 High denisty sprayed applied
cementitious material fire coating main
structural steel parts.
Rate per square meter
a. For 60 min.
M2 -
b. For 120 min.
M2 -
c. For 180 min.
M2 -
7.08 Intumescent coating for main structural
steel parts.
Rate per square meter
a. For 60 min.
M2 -
b. For 120 min.
M2 -
c. For 180 min.
M2 -
Description Unit Qty. Unit Total
Item Rate Amount
METAL CLADDING
7.09 Supply and installation corrugated steel
sheets, PVF2 factory coated according
to specifications of color approved by
the organization. Price includes
fasteners, overlapping, propping and
steel plate formed to cover top of
intersection of inclined cladding
corrugated sheets for roof steel
structure as per drawingsand
specifications of sheets, structural
calculations and paint system indicating
durability shall be submitted with
tender.
Rate per square meter
a. For up to 4 hours.
L.M 102 0
b. For less than 1 hour. L.M -
c. For 1 hour.
L.M -
d. For 2 hours. L.M -
e. For 3 hours.
L.M -
f. For 4 hours.
L.M -
MISCELLANEOUS
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Project Name:
Owner:
Consultant:
Estimation Date:
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
Item Distribution Unit Qty. Unit Rate
Subcontractors M3 3850 30
Transportion in site نقل ناتج الحفر داخل الموقع M3 4042.5 10
Transportion Out site نقل ناتج الحفر خارج الموقع
Productivity
Item Distribution Unit Qty.
Rate
Excavation in any type of soil (except rock) including
dewatering of ground and surface water and shoring of
excavation sides, transportation of excavated material to
M3 3500
storage site areas (or to place of fill, where allowed),
geometric measured volumes.
EGP 155,925.00
EGP 115,500.00
EGP 40,425.00
"