Schedule D :Annex I

(Part-VI)
List of specialized works to be executed through specialized agencies:
Eligibility criteria for Specialized agencies

1. The list of specialized works which are to be got executed only through specialized
agenciesalong with qualifying criteria are mentioned below:

Sr. No Specialized Work Qualifying criteria for specialized agencies

1. Water proofing work The main contractor shall submit the names of
specialized agencies (minimum 02 agencies),
2. Structural Steel Work who has successfully carried out *similar nature
3. Metal roofing System work, as given below :
4. False ceiling Work (All type)
One work of at least 80% of the total value of
5. Structural Glazing and glass work, equal or greater to cost component of
partitions works. particular work(s). /area / quantity of work as
6. ACP , GFRC,GFRGand solid per approved drawings as worked out by
acrylic surface cladding contractor.
7. Reinforced Soil Structure (RE
Wall) OR
8. Internal & External Electrical Two works each of at least 50% of the total
Installation including light and value of work, equal or greater to cost
power plug point hand dryeir, component of particular work(s)./area / quantity
land scaping / facade lighting of work as per approved drawings as worked out
earthing and lighting by contractor.
protection f UPS etc. OR
* Similar nature work means
~ITC of Internal & External Three works each of at least 40% of the total
Electrical Installations. value of work, equal or greater to cost
component of particular work(s)./area / quantity
9. Power supply Systems: of work as per approved drawings as worked out
Substation equipment lndudtno by contractor.
DG sets Transformers HT, LT
Panels cabtnc APFC panel etc during the last Seven years ending on the date
*Similar nature work of issue of work order alongwith the client's
means certificate.
SITC of Substation
Equipments. In this regard the firms will also submit the latest
financial position (balance sheet etc.) duly
10. HVAC System
certified by charted accountant. The average
* Similar nature work means
financial turnover shalt be more than 30% of
- tendered amount of a particular item(s)!
SITC of Chiller
work(S).

11. Fire hydrant & Sprinkler JV/Consortium is not permitted for execution of
system, gas suppression
specialized works.
*Similar nature work means
SITC of Fire hydrant & Sprinklel
Infrastructure and machineries proposed to be
system
deployed shalt not be more than 07 years old
for the particular item of work. Documents
12. Fire alarm & Detection .. towards ownership or leasing arrangement shall be
System

Tender Documen~~iPur (I;r.(!:lV.~, .q"'li Page- 328


/"-;;-:
;;, t\ISH0KE DEOLI
.~.;.am:
(\ilr~I.-r~t:'I)
General Manager (Engg.-Clvil)-NR

~,~~
* Similar nature work means
submitted to the E-I-C, within 1/8th of stipulated
- completion period or within three month from
SITe of Fire Alarm & issue of work order whichever is earlier. Engineer-
Detection System In-Charge after getting the documents will
13 Way Finding Signages approve the specialized agencies without prejudice
14 Solar Power Generation System to AAI.
15. PA system In case of non- government works, TDS certificate
16. Lift/Escalators for entire value, will be required to be submitted.
17. Sewerage Treatment Plant In case contractor claim's of having requisite
18. Water Treatment Plant experiencein house, a certificate from client Is to
(WTP)/ PHE including water be submitted stating that the particular works is
supply pumps etc. executed by contractorhimself and no specialized
19. Building Management System agency engaged in terms of agreement and in
CBMS) case of private client supporting
20. Airport System & Security qualifying document as mentioned shall be
submitted as
21. IT Works a proof of In -house capability ..
22. Tyre killers and Boom barriers
with ANPR and DIG

Note-
1. Lift/Escalators work shall be executed
throughOEM.
2. Fire Detection Alarm System, work
shall be executed through OEM /
Specelized agacny
3. For Internal &. External EI, SUb-station
Equipments &. DG Sets work, agency
should also have valid Electrical
License issued by appropriate
authority.

The main contractor shall submit the credential of specialized agencies well in advance as perthe
direction of Engineer-in-charge. After verification of the same, written approval will be conveyed to
main contractor in this regard. The credentials and expertise of the specialized agencies in the similar
works should be commensurate the quantum and nature of the specialized works as above. Even if,
such specialized items of work shall be executed by the specialized agencies, the work shall be
deemed to be executed by the tenderer for all purposes and the responsibility Of the quality of items
of works executed etc. shall continue to be that of thetenderer only. To this effect, Main Contractor
shall execute Tripartite agreement with AAI & specialised agencies till completion of AICMC
period

The main contractor shalt not change the specialized agency without taking prior approval of Engineer~
in-Charge except due to exceptional circumstances such as closure or bankruptcy of specialised
agency etc. However before making any such change he has to enter into agreementwith new agency
and submit the same to Engineer - in - Charge for approval. This shall however be without any
change in the accepted rates of the contract agreement and without any cost implications to the
Department and penalty for such changes @ RS. 5 Lacs per Specialised agency shall be effected.

It shall be the responsibility of main contractor to sort out any dispute /Iitigation with the Specialized
Agencies without any time & cost overrun to the Department. The main contractor shall be solely
responsible for settling any dispute/litigation arising out of his agreement with the Specialized
Agencies. The contractor shall ensure that the work shalt not suffer on account of litigationl dispute

Page- 329
Tender DO~0jC; C ~~UdaiPur
(~q. ~
5; p tt
( s::
I.).l ~
't1
~ .....
r , ",,"
between him and the specialized agencies I subcontractor( s). No claim of hindrance in the work shall
be entertained from the Contractor on this account. No extension of time shall be granted and no claim
what so ever, of any kind, shall be entertained from the Contractor on account of delay attributable to
the selection/rejection of the Specialized Agencies or any dispute amongst them.

2. List of items of works for which specific guarantee period as mentioned herein under shall be
provided (Refer 7.2 and 7.3 of Article 7)

iSr. No Item of Work Reference to Period of Guarantee


Schedule G from certified date
of completion
of construction work
1, Water prooflnq work 2,1(v),2.10(iv), 15 Years
7 (v) & (vi), 8.2
(iii)
2, Structural Steel Work 2,6 0), 4 (iv) 15 Years
3. Roofil}g_ 2.6 (ii), 4 (iv) 15 Years
4. Structural Glazing and glass 2.7 10 Years
partitions works.
5. False ceiling Work (All type) 2.8 10 Years
6. Cladding system (All Type) ilc 2.9 10 Years
ACP, GFRC,GFRGand solid acrylic
surface cladding
7. LED Light Fittings 9.2 05 Years
8. Solar PV Panel 9.9 25 Years
9. Inverter for Solar Plant 5 Years

a{P'~
NAJ~f)~:I, 'I > r("lLi
Page-330

~,~'I> (tlJ1i.-,I..,. ) T·I.~n{


General Manager (Engg.-Ci~iI)-NR