JOINT OPERATION PPE-YUAN-MAJUBERSAMA

_______
GRESIK – LAMONGAN – TUBAN

DISTRIBUTION PIPELINE PROJECT PHASE I (CP21A)

TECHNICAL SPECIFICATION
GAS FILTER PACKAGE

A 24-04-2015 HM ISSUED FOR EPC PROPOSAL PI


REV DATE BY DESCRIPTION CHECK APPD
TOTAL OR PARTIAL RE-PRODUCTION AND/OR UTILISATION OF THIS DOCUMENT ARE FORBIDDEN WITHOUT
PRIOR WRITTEN AUTHORIZATION OF THE OWNER

PT. PERUSAHAAN GAS NEGARA REVISION STATUS


(PERSERO) TBK.

A IFB
KONSORSIUM JFE-JFEEI-PP
SPECIFICATION - GAS FILTER PACKAGE (Tag No. 3525-F-1101 A/B)

1. Design Basis Data

Design Pressure : 720 psig


Design Temperature : 130 OF
Operating Pressure : 290 - 363 psig
Operating Temperature : 80 OF
Fluid : Hydrocarbon Gas
Design Flow Rate : 100 MMSCFD
Gas MW : 16.21
Gas Density : 0.956 - 1.0775 lb/ft3
Gas Viscosity : 0.0117 - 0.0118 cP
Z-factor : 0.9527 - 0.9472
ANSI Rating : ANSI 300#
Mechanical Design Basis : Modular Skid Design
• Sub-Skid I – Filter Upstream Pipe Skid
• Filter Vessel A - Loose item supply
• Filter Vessel B - Loose item supply
• Sub-Skid II – Filter Downstream Pipe Skid
Piping Design Code : ANSI B31.8
Pressure Vessel Design Code : ASME Sect. VIII Div.1
Others Standard & Code : Common standard & code which use in oil and gas project
Process Design : by PT. Pacific Process Engineering
Mechanical Design : by PT. Pacific Process Engineering
Base Material : Carbon Steel

Filter Design Capacity : 2 x 100% (One unit running, one unit stand-by)
Filter Type : Gas Filter Coalescer
Filter Element Type : Coalescing cartridge element
Filter Element Media : Polyester
Filter Element Manufacturer : PECO (Perry Equipment) or equal
Filter Performance : 99.9% solid and liquid removal 1.0 microns and larger

Filter Opening type : Quick Opening Closure, Clamp type


QOC Safety Device : Pressure Warning Device & Mechanical interlock
QOC Manufacture : GD Engineering or equal

2. Specification of Gas Filter Vessel

Please refer to Attachment – GA Drawing of Gas Filter Vessel and Attachment – Technical
Specification of Quick Opening Closure

3. Structural Skid

Please refer to Attachment-GA Drawing of Gas Filter package

EPC Manyar Offtake Station – Gresik-Lamongan-Tuban Distribution Pipeline Phase 1 (CP21A) Page : 2
GAS FILTER PACKAGE
4. Piping

Please refer to Attachment-PID Drawing of Gas Filter package, and Attachment-GA Drawing Skid of
Gas Filter package

EPC Manyar Offtake Station – Gresik-Lamongan-Tuban Distribution Pipeline Phase 1 (CP21A) Page : 3
GAS FILTER PACKAGE