CHB Fence
CHB Fence
ESTIMATE
7 Spans @ 3 Mts UNIT
QTY UNIT DESCRIPTION SUB TOTAL TOTAL
per Span COST
A) EARTHWORKS:
a) DEMOLITION and SITE CLEARING:
Labor: LUMP SUM 5,000.00
b) STAKING & LAYING
OUT:
Labor: LUMP SUM 450.00
c) EXCAVATION:
Column footing: F1-C1 = 8 units
Volume per F1C1 = 0.29 cu.m.
F1C1 vol: 8 x 0.29m
Total Volume F1-C1 = 2.32 cu.m.
Wall footing: 21 LM
WF = 0.30m. x 0.60m. x 5.00m.
Total WF Vol: 5 cu.m.
Total Volume = 7.32 cu.m.
Labor: 7.32 cu.m. 400.00 2,928.00
APPROVED BY: