PPH Piping BOQ (Butt Fusion)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

ANNEXURE

Fabrication & Erection of Non metallic Piping

Sr No Description Size Qty Unit Rate Amount Remarks


1 Pipe 20 OD 5.00 Mtr 100.00 500.00
2 Pipe 32 OD 5.00 Mtr 100.00 500.00
3 Pipe 50 OD 175.00 Mtr 150.00 26,250.00
4 Pipe 63 OD 5.00 Mtr 200.00 1,000.00
5 Pipe 75 OD 5.00 Mtr 250.00 1,250.00
6 Pipe 90 OD 120.00 Mtr 300.00 36,000.00
7 Pipe 110 OD 165.00 Mtr 400.00 66,000.00
8 Pipe 140 OD 20.00 Mtr 550.00 11,000.00
9 Pipe 180 OD 180.00 Mtr 700.00 1,26,000.00
10 Elbow 50 OD 15.00 Nos 330.00 4,950.00
11 Elbow 90 OD 20.00 Nos 660.00 13,200.00
12 Elbow 110 OD 12.00 Nos 880.00 10,560.00
13 Elbow 140 OD 4.00 Nos 1,210.00 4,840.00
14 Elbow 180 OD 19.00 Nos 1,540.00 29,260.00
15 Flange 20 OD 2.00 Nos 110.00 220.00
16 Flange 32 OD 2.00 Nos 110.00 220.00
17 Flange 50 OD 6.00 Nos 165.00 990.00
18 Flange 63 OD 5.00 Nos 220.00 1,100.00
19 Flange 75 OD 1.00 Nos 275.00 275.00
20 Flange 90 OD 10.00 Nos 330.00 3,300.00
21 Flange 110 OD 5.00 Nos 440.00 2,200.00
22 Flange 140 OD 8.00 Nos 605.00 4,840.00
23 Flange 180 OD 20.00 Nos 770.00 15,400.00
24 BV 20 OD 2.00 Nos 250.00 500.00 GF++ Make
25 FTA 20 OD 2.00 Nos 220.00 440.00
26 Reducer 140x75 OD 1.00 Nos 880.00 880.00
27 Reducer 110 x 50 OD 2.00 Nos 605.00 1,210.00
28 Reducer 90x50 OD 1.00 Nos 495.00 495.00
29 Reducer 50 x 32 OD 1.00 Nos 275.00 275.00
30 Tee 180 x 63 OD 4.00 Nos 1,760.00 7,040.00
31 Tee 140 OD 1.00 Nos 1,815.00 1,815.00
32 Tee 110 x 20 OD 1.00 Nos 990.00 990.00
33 Tee 180 OD 5.00 Nos 2,310.00 11,550.00
34 Tee 90 OD 1.00 Nos 990.00 990.00
35 Tee 90 x 63 OD 1.00 Nos 880.00 880.00
36 Tee 50 x 20 OD 1.00 Nos 440.00 440.00
37 Pipe Clamp 20 OD 2.00 Nos 10.00 20.00
38 Pipe Clamp 32 OD 2.00 Nos 10.00 20.00
39 Pipe Clamp 50 OD 130.00 Nos 15.00 1,950.00
40 Pipe Clamp 63 OD 5.00 Nos 20.00 100.00
41 Pipe Clamp 75 OD 1.00 Nos 25.00 25.00
42 Pipe Clamp 90 OD 90.00 Nos 30.00 2,700.00
43 Pipe Clamp 110 OD 120.00 Nos 40.00 4,800.00
44 Pipe Clamp 140 OD 10.00 Nos 55.00 550.00
45 Pipe Clamp 180 OD 120.00 Nos 70.00 8,400.00

TOTAL 4,05,925.00

Notes :
1. The above offer is based on the unit prices, any vary in quantites as per suit to site conditions will
change cost effectively.
2. Supply of Pipe, Fittings, Valves and Instruments, gaskets and hardwares will be in scope of client.
3. Supply, Fabircation and Installation of Secondary supports will be in scope of client.
4. Our scope is limited to fabrication and erection of non metallic piping only.
5. Required quality compliance will be in scope of client, we will submitt only installed quantities at
site.
6. Required suiable space for fabrication of spools will be in scope of client.
7. Required electricity / DG set with diesel at single point of contact will be in scope of client.
8. Material storage and material reconcillation will be in scope of client.
9. Required Hydra, Scissor Lift, Boom Lift, Scaffolding and Ladder for installation and material
shifting will be in scope of client.
10. We will do hydrotesting for non metallic Piping only.

Ex-Works, Dholera
Delivery :
4 Weeks

20% advance against manpower mobilization,


Payment
70% against certified measurement sheet within 7 days.
Terms :
10% immediate against hydrotesting.