PPH Piping BOQ (Butt Fusion)
PPH Piping BOQ (Butt Fusion)
PPH Piping BOQ (Butt Fusion)
TOTAL 4,05,925.00
Notes :
1. The above offer is based on the unit prices, any vary in quantites as per suit to site conditions will
change cost effectively.
2. Supply of Pipe, Fittings, Valves and Instruments, gaskets and hardwares will be in scope of client.
3. Supply, Fabircation and Installation of Secondary supports will be in scope of client.
4. Our scope is limited to fabrication and erection of non metallic piping only.
5. Required quality compliance will be in scope of client, we will submitt only installed quantities at
site.
6. Required suiable space for fabrication of spools will be in scope of client.
7. Required electricity / DG set with diesel at single point of contact will be in scope of client.
8. Material storage and material reconcillation will be in scope of client.
9. Required Hydra, Scissor Lift, Boom Lift, Scaffolding and Ladder for installation and material
shifting will be in scope of client.
10. We will do hydrotesting for non metallic Piping only.
Ex-Works, Dholera
Delivery :
4 Weeks