List of Work Additional Pipeline + Tracing + Insulation Noor Project
List of Work Additional Pipeline + Tracing + Insulation Noor Project
Hikari
Modification/New line
no line no from to line size Steam Tracing Hot Insulation
1 n/a 20P4 discharge 20T3 inlet line 3" V V
2 n/a 20P2B unloading flexibag 4" V V
3 n/a 20P2B unloading truck 4" V V
4 n/a 11P3 A/B 20T5 inlet line 3" V V
5 n/a 20P1A 11E1 A/B 3" V V
6 n/a outlet 20T3 suction line 20P1A 6" V V
7 n/a header compr.air Noor plant all floor 1/2"