ACROPOST - SHORING
A-01 B-03 JOINT PIN C-08 G.I. PIPE ASSORTED D-11 HORIZONTAL 80CM
JACK
A-02 BASE JACK B-04 WING NUT C-09 B.I. PIPE 2"x6m D-12 HORIZONTALS 115CM
ALUMA BEAM
A-03 U-HEAD SMALL B-05 TIE ROD C-10 B.I. PIPE 2-1/2"x6m E-1
122x120CM
ALUMA BEAM
A-04 U-HEAD BIG B-06 HOOK PIN C-11 B.I. PIPE 3"x6m E-2
122x240CM
ALUMA BEAM
A-05 U-HEAD TELESCOPIC B-07 LADDER - REBAR C-12 B.I. PIPE 4"x6m E-3
122x360CM
A-FRAME SCAFFOLD
A-06 MAIN POST 90CM B-08 LADDER - MONKEY D-01 E-4 CROSS BEAM 60CM
60x158CM
A-FRAME SCAFFOLD
A-08 MAIN POST 240CM B-10 LADDER - ALUMINUM D-03 E-6 CROSS BEAM 120CM
120x170CM
H-FRAME SCAFFOLD
A-09 CORNER ANGLE 90CM C-01 G.I. PIPE 1"x6m D-04 E-7 MAIN BEAM 177-288CM
90CM
H-FRAME SCAFFOLD
A-10 CORNER ANGLE 120CM C-02 G.I. PIPE 1-1/4"x6m D-05 E-8 MAIN BEAM 228-368CM
120CM
H-FRAME SCAFFOLD
A-11 CORNER ANGLE 180CM C-03 G.I.PIPE 1-1/2"x6m D-06 E-9 MAIN BEAM 268-438CM
170CM
A-12 CORNER ANGLE 240CM C-04 G.I. PIPE 2"x6m D-07 CROSS BRACE E-10 SUB BEAM 80CM
A-13 CIPPO FABRICATED 2M C-05 G.I.PIPE 2-1/2"x6m D-08 WELLER PIPE E-11 SUB BEAM 115CM
B-02 WEDGE PIN C-07 G.I. PIPE 8"x6m D-10 HORIZONTALS 40CM
Project Site: ___________________________________________ Project-in-charge: _____________________________ Warehouseman: _____________________________