PROJECT: ALTRON WOODLANDS - HVAC INSTALLATION

INFORMATION: HVAC Services


Version: Revision 0 – 2024-05-14

Section 5

Annexure C

BOQ
HVAC SERVICES
1005168 – ALTRON WOODLANDS - HVAC INSTALLATION VI

PART VI - BILLS OF QUANTITIES

1. PROVISIONAL BILLS OF QUANTITIES

1.1 These Bills of Quantities contain pages numbered consecutively in each bill as indicated
in the Master Index. Before the tenderer submits his tender he should check the number
of pages, and if any are missing or duplicated or the figures or writing indistinct, or the
Bills of Quantities contain any obvious errors, he should apply to the enquirer at once
and have same rectified, as no liability whatsoever will be admitted by the enquirer in
respect of errors in tender due to the foregoing.

1.2 The Bills of Quantities form part of and must be read in conjunction with the
specifications and drawings which contain the full description of the work to be done and
material and equipment to be used.

1.3 Tenderers to price the Bill of Quantities as well as any items described in the
specifications and or drawings but not in the Bill of Quantities. Should there be a
discrepancy of quantities between items in the specification, drawings and the Bill of
Quantities, the greater of the quantities shall be priced for.

1.4 Tenders shall be submitted for initial consideration on the declaration of the total value of
the Bills, Bill Summary, Non Schedules Bill Item Rates and Extra over Rates. Subject to
declaration of intent to enter into a contract, the bills priced in detail shall be made
available within 4 working days after the request to submit the completed bill.

The enquirer may request the submission of completed bills by more than one tenderer
subsequent to the tender opening where special circumstances warrant this request.

1.5 The total sum in the tender form or other sum, subsequently negotiated between the
enquirer and tenderer shall constitute the contract sum of the successful tenderer.
Tenderers are advised to check their item extensions and total additions, as no claim for
arithmetical errors will be considered.

1.6 No alterations, erasure or addition is to be made in the text of the Bills of Quantities.
Should any alteration, erasure or addition be made, it will not be recognised and the
original wording of the Bills of Quantities will be adhered to.

1.7 The priced Bills of Quantities of the successful tenderer will be checked and the enquirer
reserves the right to call for reasonable adjustments to any individual price and to rectify
any discrepancy whilst the total tender price, as submitted, remains unaltered. This is to
be resolved before award of the contract.

1.8 The responsibility for the accuracy of the quantities written into the bills remains with the
party who prepared the bills. The tenderer shall be relieved of responsibility of
measuring quantities at the tender stage, and tender sum submitted shall be in respect of
the quantities set-out in the bills, although he will be required to make his assessment of
items such as fixings, etc. from details stated in the bills and shall include the item prices
for such small installation materials as are required for the complete installation in
accordance with the specification.

MAY 2024 1
Revision 0
1005168 – ALTRON WOODLANDS - HVAC INSTALLATION VI

1.9 The Contractor and the Employer or his Agent may agree that the total of any bill or bills,
including any changes by way of additions thereto or deductions therefrom, represents a
fair and accurate quantification of the items set-out in the bills and the parties may agree
final payment on that basis. In the event of any dispute as to the quantities, then the
disputed item or items shall be adjusted where necessary.

1.10 The quantities in these Bills of Quantities are not to be used for ordering purposes.

1.11 Changes in the scope and extent of the work included in the Bills shall be allowed to
meet the Employer’s requirements.

1.12 Unless separate rates for the supply and for the installation of any item is specifically
called for, the supply and installation costs of any item shall be fully included in the unit
price according to specification.

The description and pricing of each item shall, unless otherwise stated herein, be held to
include making, conveying and delivering, unloading, unpacking, setting, fitting and fixing
in position cutting and waste, patterns, templates, plant, return of packings, profit and all
other obligations arising out of the conditions of contract, excluding preliminaries.

1.13 The labour and transport rates and the overhead and profit percentage included for Non-
Scheduled Bill Items in the tender shall form part of the contract.

1.14 Tenderers shall price the Preliminaries under any of all three groups, viz;

a) a fixed amount;
b) an amount varied in proportion to the final contract value as compared to the
tender price;
c) an amount varied in proportion to the final contract period as compared to the
originally specified contract period.

The allocation of prices to the three categories listed above must be realistic and the
Contractor may be required to justify the allocation of the prices. Attention is particularly
drawn to the right reserved in terms of Clause 1.6 above.

1.15 Any work for which a budgetary allowance has been made, shall be priced in terms of
the n/s agreement. Any balance remaining shall be deducted from the budgetary
allowance in the n/s contract sum.

1.16 The quantities in these Bills of Quantities are measured provisionally. All work executed
in accordance with the workshop drawings approved by the Engineer shall be re-
measured by the agent who measured the original Bill of Quantities and priced at rates
contained in, or based on, the priced Bill of Quantities.

1.17 Provision is made on the Tender Form for the applicable Value Added Tax to be added.

1.18 Monthly progress claims may be based on the percentage completion of the items under
the main headings.

1.19 All fluctuations in costs, with the exception of fluctuations in the rate of Value Added Tax,
shall be for the account of the subcontractor”

MAY 2024 2
Revision 0
1005168 – ALTRON WOODLANDS - HVAC INSTALLATION VI

1.20 The preamble will be the Model Preambles for Trades as recommended and published
by the Association of South African Quantity Surveyors. Tenderers are referred to this
document for the full intent and meaning of each clause.

Alternatively the non-scheduled item could be treated as a proven cost item.

1.21 METHOD OF MEASUREMENT

1.21.1 Rectangular Ductwork - Straight

Straight rectangular ductwork will be measured along the centre lines and is billed in
square metres according to size in the five categories based on the SARACCA
classification.

1.21.2 Rectangular Ductwork - Fittings

Duct fittings are measured individually shall include sheetmetal and extra over
allowances for manufacturing, additional labour, turning vanes etc.

1.21.3 Rectangular Ductwork - General

The rate for ductwork includes all necessary jointing materials such as drive-slips, slip
joints, angle section flanges, gaskets, nuts, bolts, duct sealer, etc. and shall allow for off-
cuts and wastage.

Duct supports are measured in the duct rate and shall include fixing to concrete slabs,
roof trusses and purlins as required.

Design drawings must be used in order to draw a distinction between ductwork fixed
vertically or horizontally and between ductwork fixed to different elements and at different
heights.

Special ductwork such as high pressure ductwork and kitchen canopy exhaust ductwork,
are billed separately.

1.21.4 Round Ductwork

Straight round ducts are listed in metres.

Round fittings are listed separately by type and size.

The rate for ductwork includes all necessary jointing material such as slip joints, angle
section flanges, gaskets, nuts, bolts, duct sealer, etc. and shall allow for off-cuts and
wastage.

Duct supports are measured in the duct rate and shall include fixing to concrete slabs,
roof trusses and purlins as required.

Flexible ductwork are billed in metres and number of lengths based on a length of 1½m
(expanded) per section. The rate shall include for two clamps per 1½ section.

MAY 2024 3
Revision 0
1005168 – ALTRON WOODLANDS - HVAC INSTALLATION VI

1.21.5 Duct Insulation

Internal insulation is listed in square metres based on the nett metal surface area of the
duct to which the insulation is applied based on the measurement methods mentioned
above.

External insulation is listed in square metres based on the outside surface area of the
insulation.

Rates for insulation include glue for fixing and pins as per specification.

Areas for different types of insulation and different thicknesses are listed separately.

1.21.6 Piping and Tubing

Piping and tubing are measured in metres, stating the internal diameter in accordance
with accepted trade usage. The rate for piping includes cutting jointing and running
joints. The lengths for pipes are measured over / through all fittings, but not over valves,
pumps and in-line instruments such as strainers, site glasses, etc.

Pipe fittings are billed “in number” as “extra over” piping. Pipe fittings such as bushes,
elbows, bends, tees, junctions, etc. to pipes not exceeding 50 mm diameter are given in
one item for each diameter of pipe. Pipe fittings to pipes exceeding 50 mm diameter are
given separately for each diameter of pipe and each type of fitting. Valves, flanges, etc.
are given separately for all diameter of pipe. Purpose-made fittings are to include for
lining-up of fittings.

The rate for a pair of flanges shall include for flange weld, gasketing and bolts.

Pipe supports are measured in the pipe rate and shall include fixing to concrete slabs
and roof trusses.

Where anti-vibration elements are to be used with the supports, these elements are
listed separately.

Refrigerant charge for piping and equipment shall be included in the pipe rate.

Black piping and galvanised piping and their respective fittings are billed separately.

1.21.7 Pipe Insulation

Pipe insulation is measured in metres stating the diameter of the pipe. Pipe fittings are
billed in number as “extra over” pipe insulation, all as described above.

Where cladding to insulation is required, this is to be listed separately.

1.21.8 Diffusers, Grilles, Louvres, Dampers, etc

Diffusers, grilles, louvres, dampers, fire dampers, filters, etc. are given in number for the
different sizes.

Master and slave variable volume diffusers are billed separately.

MAY 2024 4
Revision 0
1005168 – ALTRON WOODLANDS - HVAC INSTALLATION VI

1.21.9 Supports

Rates for pipework, ductwork and fans allow for “normal” supports.

1.21.10 Spares and Replacements

Any are billed separately in detail.

Water treatment chemicals are to be included for the full maintenance period.

1.22 FORMAT OF THE BILL OF QUANTITIES

The Bill of Quantities has been presented in twelve (5) parts, namely:

1. SUMMARY
2. P&G
3. BLD5 TENANT BOQ
4. BLD6 TENANT BOQ
5. BLD7 TENANT BOQ

Each part consists of the following high-level scope:

1. SUMMARY

A summary page of each part of the BOQ.

2. P&G

All P&G related items pertaining to the project

3. BLD5 TENANT BOQ

All fan coil units and associated ducting, chilled water piping from shut-off valves,
air terminals etc. which is based on the tenant internal space plan with individual
control to spaces such as meeting rooms where indicated and thermally zoned
open plan spaces. One additional DX midwall split unit complete wit refrigerant
piping and condenser.

4. BLD6 TENANT BOQ


All VRF hideaway units and associated ducting, refrigerant piping, air terminals
etc. which is based on the internal space plan with individual control to spaces
such as meeting rooms where indicated and thermally zoned open plan spaces.

5. BLD7 TENANT BOQ

All VRF hideaway units and associated ducting, refrigerant piping, air terminals
etc. which is based on the internal space plan with individual control to spaces
such as meeting rooms where indicated and thermally zoned open plan spaces.

MAY 2024 5
Revision 0
1005168 – ALTRON WOODLANDS - HVAC INSTALLATION VI

IMAGE ABOVE - SITE PLAN

MAY 2024 6
Revision 0
1005168 – ALTRON WOODLANDS - HVAC INSTALLATION VI.A3

VI.A3 - DETAIL BILL OF QUANTITIES

The sub-contractor shall complete this section in full in order to assess project progress valuations
and variations.

The prices shall be :-

- Nett cost of equipment materials supplied and installed on site.

- Excluding project engineering, management and quality control.

- Excluding company overheads, financing, insurance, guarantee costs and profit.

- Excluding Value Added Tax.

- Excluding one year's free maintenance and guarantee.

Here follows the detail bill of quantities:

NOTE: ALL RATES MUST BE PROVIDED AND THE BILL OF QUANTITIES


MUST BE COMPLETED IN FULL

MAY 2024 1
Revision 0
ALTRON WOODLANDS - SUMMARY 1 VI.A3.3 - DETAIL BILL OF QUANTITIES

VI.A3.3 - DETAIL BILL OF QUANTITIES


ALTRON WOODLANDS - SUMMARY

ITEM DESCRIPTION UNIT QUAN- RATE AMOUNT


NO TITY

1 Preliminaries and General Lot


2 Bld5 Tenant Lot
3 Bld6 Tenant Lot
4 Bld7 Tenant Lot
5 BMS as per attached Point List Lot
6 Contingencies Lot 100,000.00

TOTAL VI.A3.3 SUMMARY BOQ (Carried forward to VI.A1 Summary)


ALTRON WOODLANDS - P AND G 2 VI.A3.3 - DETAIL BILL OF QUANTITIES

VI.A3.3 - DETAIL BILL OF QUANTITIES


ALTRON WOODLANDS - SUMMARY

ITEM DESCRIPTION UNIT QUAN- RATE AMOUNT


NO TITY

PRELIMINARIES AND GENERAL ITEMS

Agreement and schedule of conditions of Building Sub contract (Selected


1 Subcontract) 2000 Edition. Item 1

Preliminary and conditions of the Main Contract are included in the


3 specification Document and shall form part of this HVAC contract. Item 1

The HVAC tenderer is referred to the above mentioned documents for


4 the full intent and meaning of each clause thereof Item 1

If the HVAC tenderer wishes to place value to any of the clauses detailed
5 on the preliminary he should do so hereunder. Item 1
6 Health and Safety as per Main Contractors Conditions Sum 1
7 Clearance of Rubbish Sum 1
8 Site establishment & clearance Sum 1
9 Scaffolding Sum 1
10 Performance Guarantee Sum 1
11 Payment Guarantee Sum 1
12 Staff organisation Sum 1
13 Progress for measurements Sum 1
14 Attendance for measurements Sum 1
15 Tests and inspections Sum 1
16 Preparation of operation and maintenance manuals Sum 1
17 As- built drawings Sum 1
18 12 months guarantee and maintenance Sum 1
19 Programming of the work Sum 1
20 Testing, balancing & commissioning Sum 1
21 Equipment submissions Sum 1
22 Contract drawings Sum 1
23 Contract management Sum 1
24 Office administration Sum 1
25 Safety Sum 1
26 Spares as specified Sum 1
27 Equipment labels Sum 1
Storage of imported goods (off site) inclusive of security, insurance, etc.
28 until installation is required on site. Sum 1
Any additional items of preliminary nature that the HVAC
tenderer may wish to add to comply with the requirements of
the HVAC specification and/or bill of quantities. To be listed
29 hereunder by the HVAC tenderer:
30
31
32
33
34
35
36
37
38
39
40

SUB-TOTAL (Carried forward to Summary Page)

TOTAL VI.A3.3 P&G BOQ (Carried forward to VI.A1 Summary)


ALTRON WOODLANDS - BLD5 TENANT HVAC 3 VI.A3.2 - DETAIL BILL OF QUANTITIES

VI.A3.2 - DETAIL BILL OF QUANTITIES


ALTRON WOODLANDS - BLD5 TENANT HVAC

ITEM DESCRIPTION UNIT QUAN- RATE AMOUNT


NO TITY

1 DUCTING

Ducting installed and pressure tested as per specification

DUCTING

Galvanised Rectangular Straight Ducting (measured along centre lines)

Category 1 m² 12

Galvanised Round Straight Ducting (measured along centre lines)

150ø m 9
200ø m 24
250ø m 35
300ø m 13

1 SUB TOTAL - DUCTING

2 DUCT FITTINGS

Galvanised Rectangular Duct Fittings (Including Sheetmetal)

Stop end
400x300 No 6

Square to round
1448x233-Ø250 No 6

Transformation
1448x233-400x300 No 4

Galvanised Round Duct fittings (Including Sheetmetal)

Bend
90.00° Ø150-Ø150 No 8
90.00° Ø200-Ø200 No 23
90.00° Ø250-Ø250 No 24
90.00° Ø300-Ø300 No 8

Spigot
Ø150-Ø150 No 6
Ø200-Ø200 No 15
Ø250-Ø250 No 9

Butterfly lockable quadrant dampers, including spigots


250ø No 18

1500mm Insulated Round Acoustic Flexible Ducting (incl two clamps)


150Ø No 8
200Ø No 3
250Ø No 57
300Ø No 5

Duct Insulation
Duct Insulation (Internal Sonic Liner, 25mm thick) m² 12
Duct Insulation (External, 25 mm thick) m² 80

Demolition
Uninstall, removal and blank-off of existing HVAC ducting, air terminals in the building as
per new design drawing and existing as-built drawing, excluding existing units in patch Sum 1
rooms and existing ablutions

2 SUB TOTAL - DUCT FITTINGS

3 PIPING (Insulated)

Chilled water piping, threaded


20 dia m 56
25 dia m 42

PVC Condensate Drain Piping


50 Dia m 80

3 SUB TOTAL - PIPING


ALTRON WOODLANDS - BLD5 TENANT HVAC 4 VI.A3.2 - DETAIL BILL OF QUANTITIES

ITEM DESCRIPTION UNIT QUAN- RATE AMOUNT


NO TITY
4 Chilled water pipe fittings (Insulated)

Bend, threaded
20 dia No 4
25 dia No 3

Reducer Tees, threaded


80 dia - 20 dia No 4
40 dia - 20 dia No 4
80 dia - 25 dia No 3
40 dia - 25 dia No 3

Shut-off valves, screwed, and insulated


20 dia No 4
25 dia No 3

Auto air vent with socket


15 dia No 7

Valved drain c/w socket, ball valve and stop-end (plug)


15 dia No 7

Motorized 2 way Pressure Independent Control valves, screwed and insulated


20 dia No 4
25 dia No 3

Flexible piping including connections (600mm length)


20 dia No 4
25 dia No 3

4 SUB TOTAL - PIPE FITTING

6 AIR TERMINALS

600x600 Fixed Blade Alu Powdercoated Grill c/w Return Air Filter Frame
c/w plenum box and 1 No. 250Ø spigot No 7
c/w plenum box and 2 No. 250Ø spigot No 6

600x1200 Fixed Blade Alu Powdercoated Grill c/w Return Air Filter Frame
c/w plenum box and 2 No. 250Ø spigot No 3

600x600 CV Plate Diffuser


200Ø No 12
250Ø No 5

CV Round Diffuser
200Ø No 5

6 SUB TOTAL - AIR TERMINALS

7 MECHANICAL EQUIPMENT

Fan Coil Unit as specified, installed and tested in position, complete with flexible connection to
supply plenum, return plenum, condensate drain pan, trap and pump. All new units to be connect to
the existing BMS System

TC 1.8kW; SC 1.4kW; HT 1.7kW; SA 166 l/s No 1


Mark-up, installation, flexible connection, supply plenum, condensate trap, etc No 1
Return air plenum to suit c/w 1-off Dia 250 Spigot No 1
TC 2.8kW; SC 2.3kW; HT 2.5kW; SA 180 l/s No 3
Mark-up, installation, flexible connection, supply plenum, condensate trap, etc No 3
Return air plenum to suit c/w 1-off Dia 250 Spigot No 3
TC 5.6kW; SC 4.5kW; HT 6kW; SA 402 l/s No 3
Mark-up, installation, flexible connection, supply plenum, condensate trap, etc No 3
Return air plenum to suit c/w 2-off Dia 250 Spigot No 3

Condensate Pumps No 7

Labelling of FCU return air grille No 20

Split air-conditioning units, heat pump, to specification, tested and installed in position. Including
refrigerant piping and condensate pumps, and all necessary trunking, electrical connections, control
wiring, hard-wired remote controllers, labeling, hail-guards, unit-struct brackets & mounting
accessories.
All units shall be supplied with a BACNET or equal interface to enable communication with BMS
Midwall unit - 12000 BTU/hr No 1
Refrigerant piping to suit ALL units (Length indicated PER UNIT) m 25

7 SUB TOTAL - MECHANICAL EQUIPMENT


ALTRON WOODLANDS - BLD5 TENANT HVAC 5 VI.A3.2 - DETAIL BILL OF QUANTITIES

ITEM DESCRIPTION UNIT QUAN- RATE AMOUNT


NO TITY
8 ELECTRICAL ITEMS

Distribution and termination of electrical installation to isolator by others:


Fan Coil Units No 7
Split Units No 1

Controls:
FCU Hard wired controller, supply and installation incl. 10m cable, + BACnet Interface No 16

8 SUB TOTAL - ELECTRICAL ITEMS

9 ADDITIONAL ITEMS

Additional items shown on drawings and schematics and diagrams or in written or tabulated HVAC
specification but not in BOQ and vice versa, that is necessary for a complete and fully operational and
balanced system in accordance with the HVAC drawings, specifications, diagrams or schematics issued.
NOTE that additional items may not be claimed at later stage by HVAC contractor, unless if the design scope
changed.

10 SUB TOTAL - ADDITIONAL ITEMS

SUMMARY

1 Ducting No 1
2 Duct Fittings No 1
3 Piping No 1
4 Pipe Fittings No 1
5 Air Terminals No 1
6 Mechanical Equipment No 1
7 Electrical Items No 1
8 Additional Items No 1

TOTAL VI.A3.1 BLD5 TENANT HVAC BOQ (Carried forward to Summary Page)
ALTRON WOODLANDS - BLD6 TENANT HVAC 6 VI.A3.2 - DETAIL BILL OF QUANTITIES

VI.A3.2 - DETAIL BILL OF QUANTITIES


ALTRON WOODLANDS - BLD6 TENANT HVAC

ITEM DESCRIPTION UNIT QUAN- RATE AMOUNT


NO TITY

1 DUCTING

Ducting installed and pressure tested as per specification

DUCTING

Galvanised Rectangular Straight Ducting (measured along centre lines)

Category 1 m² 4

Galvanised Round Straight Ducting (measured along centre lines)

150ø m 4
200ø m 4
250ø m 2

1 SUB TOTAL - DUCTING

2 DUCT FITTINGS

Galvanised Rectangular Duct Fittings (Including Sheetmetal)

Stop end
500x300 No 1

Transformation
844x185-500x300 No 1

Galvanised Round Duct fittings (Including Sheetmetal)

Bend
90.00° 200ø-200ø No 1

Spigot
150ø-150ø No 1
200ø-200ø No 3
250ø-250ø No 3

Butterfly lockable quadrant dampers, including spigots


200ø No 3

1500mm Insulated Round Acoustic Flexible Ducting (incl two clamps)


150Ø No 2
200Ø No 3
250Ø No 5

Duct Insulation
Duct Insulation (Internal Sonic Liner, 25mm thick) m² 2
Duct Insulation (External, 25 mm thick) m² 2

Demolition
Uninstall, removal and blank-off of existing HVAC ducting, air terminals in the building as
per new design drawing and existing as-built drawing, excluding existing units in patch Sum 1
rooms and existing ablutions

2 SUB TOTAL - DUCT FITTINGS

3 PIPING

PVC Condensate Drain Piping


50 Dia m 33

3 SUB TOTAL - PIPING

4 AIR TERMINALS

600x600 Fixed Blade Alu Powdercoated Grill c/w Return Air Filter Frame
c/w plenum box and 1 No. 250Ø spigot No 3

600x1200 Fixed Blade Alu Powdercoated Grill c/w Return Air Filter Frame
c/w plenum box and 1 No. 250Ø spigot No 1

600x600 CV Plate Diffuser


250Ø No 3

Supply Disc Valve


150Ø No 2

4 SUB TOTAL - AIR TERMINALS


ALTRON WOODLANDS - BLD6 TENANT HVAC 7 VI.A3.2 - DETAIL BILL OF QUANTITIES

ITEM DESCRIPTION UNIT QUAN- RATE AMOUNT


NO TITY
5 MECHANICAL EQUIPMENT

VRV/VRF air-conditioning units, heat recovery, to specification, tested and installed in position.
Including refrigerant piping and condensate pumps, and all necessary trunking, electrical
connections, control wiring, hard-wired remote controllers, labeling, hail-guards, unit-struct brackets
& mounting accessories.
All units shall be supplied with a BACNET or equal interface to enable communication with BMS

TC 5.6 kW; SC 4.4 kW; HT 6.3 kW; SA 400 No 1


Return air plenum to suit c/w 2-off Dia 250 Spigot No 1
Refrigerant piping to suit ALL units (15m PER UNIT) m 15

4-Port Mode Change Unit (220-240V) and associated pipework back to condenser No 1

Degassing and Regassing of the system No 1

Labelling of FCU return air grille Lot 3


Stainless steel drain pans for condensing units No 1

5 SUB TOTAL - MECHANICAL EQUIPMENT

6 ELECTRICAL ITEMS

Distribution and termination of electrical installation to isolator by others:


Indoor Units No 1
MCU 4-Port Unit No 1

Controls:
VRF Units Hard wired controller, supply and installation incl. 10m cable, + BACnet Interface No 1

6 SUB TOTAL - ELECTRICAL ITEMS

7 ADDITIONAL ITEMS

Additional items shown on drawings and schematics and diagrams or in written or tabulated HVAC specification
but not in BOQ and vice versa, that is necessary for a complete and fully operational and balanced system in
accordance with the HVAC drawings, specifications, diagrams or schematics issued. NOTE that additional items
may not be claimed at later stage by HVAC contractor, unless if the design scope changed.

7 SUB TOTAL - ADDITIONAL ITEMS

SUMMARY

1 Ducting No 1
2 Duct Fittings No 1
3 Piping No 1
4 Air Terminals No 1
5 Mechanical Equipment No 1
6 Electrical Items No 1
7 Additional Items No 1

TOTAL VI.A3.1 BLD6 TENANT HVAC BOQ (Carried forward to Summary Page)
ALTRON WOODLANDS - BLD7 TENANT HVAC 8 VI.A3.2 - DETAIL BILL OF QUANTITIES

VI.A3.2 - DETAIL BILL OF QUANTITIES


ALTRON WOODLANDS - BLD7 TENANT HVAC

ITEM DESCRIPTION UNIT QUAN- RATE AMOUNT


NO TITY

1 DUCTING

Ducting installed and pressure tested as per specification

DUCTING

Galvanised Rectangular Straight Ducting (measured along centre lines)

Category 1 m² 19
Category 3 m² 14

Galvanised Round Straight Ducting (measured along centre lines)

150ø m 2
200ø m 4
250ø m 24
300ø m 4

1 SUB TOTAL - DUCTING

2 DUCT FITTINGS

Galvanised Rectangular Duct Fittings (Including Sheetmetal)

Bend
90.00° 350x250-350x250 No 1

Shoe
350x250-350x250 No 1

Stop end
300x300 No 2
350x250 No 2
450x250 No 2

Transformation
500x300-300x300 No 2
850x300-500x300 No 2
844x185-450x250 No 1

Square to Round
250x250-Ø250 No 2

Galvanised Round Duct fittings (Including Sheetmetal)

Bend
90.00° Ø250-Ø250 No 3

Reducer
Ø250-Ø150 No 1

Spigot
200ø-200ø No 10
250ø-250ø No 13

Butterfly lockable quadrant dampers, including spigots


200ø No 3
250ø No 3

1500mm Insulated Round Acoustic Flexible Ducting (incl two clamps)


200Ø No 10
250Ø No 13

Duct Insulation
Duct Insulation (Internal Sonic Liner, 25mm thick) m² 33
Duct Insulation (External, 25 mm thick) m² 19

Demolition
Uninstall, removal and blank-off of existing HVAC ducting, air terminals in the building as
per new design drawing and existing as-built drawing, excluding existing units in patch Sum 1
rooms and existing ablutions

2 SUB TOTAL - DUCT FITTINGS

3 PIPING

PVC Condensate Drain Piping


50 Dia m 33

3 SUB TOTAL - PIPING


ALTRON WOODLANDS - BLD7 TENANT HVAC 9 VI.A3.2 - DETAIL BILL OF QUANTITIES

ITEM DESCRIPTION UNIT QUAN- RATE AMOUNT


NO TITY
4 AIR TERMINALS

600x600 Fixed Blade Alu Powdercoated Grill c/w Return Air Filter Frame
c/w plenum box and 1 No. 250Ø spigot No 1
c/w plenum box and 1 No. 300Ø spigot No 1

600x600 CV Plate Diffuser


200Ø No 3
250Ø No 5

4 SUB TOTAL - AIR TERMINALS

5 MECHANICAL EQUIPMENT

VRV/VRF air-conditioning units, heat recovery, to specification, tested and installed in position.
Including refrigerant piping and condensate pumps, and all necessary trunking, electrical
connections, control wiring, hard-wired remote controllers, labeling, hail-guards, unit-struct brackets
& mounting accessories.
System B7-1
All units shall be supplied with a BACNET or equal interface to enable communication with BMS

TC 4.6 kW; SC 3.9 kW; SA 354 No 1


Return air plenum to suit c/w 2-off Dia 300 Spigot No 1
Refrigerant piping to suit ALL units (15m PER UNIT) m 15

4-Port Mode Change Unit (220-240V) and associated pipework back to condenser No 1

Degassing and Regassing of the system No 1

Labelling of FCU return air grille Lot 2


Stainless steel drain pans for condensing units No 1

5 SUB TOTAL - MECHANICAL EQUIPMENT

6 ELECTRICAL ITEMS

Distribution and termination of electrical installation to isolator by others:


Split Units No 1
MCU 4-Port Unit No 1
Controls:
Split Unit Hard wired controller, supply and installation incl. 10m cable, + BACnet Interface No 1

6 SUB TOTAL - ELECTRICAL ITEMS

7 ADDITIONAL ITEMS

Additional items shown on drawings and schematics and diagrams or in written or tabulated HVAC specification but
not in BOQ and vice versa, that is necessary for a complete and fully operational and balanced system in
accordance with the HVAC drawings, specifications, diagrams or schematics issued. NOTE that additional items
may not be claimed at later stage by HVAC contractor, unless if the design scope changed.

7 SUB TOTAL - ADDITIONAL ITEMS

SUMMARY

1 Ducting No 1
2 Duct Fittings No 1
3 Piping No 1
4 Air Terminals No 1
5 Mechanical Equipment No 1
6 Electrical Items No 1
7 Additional Items No 1

TOTAL VI.A3.1 BLD7 TENANT HVAC BOQ (Carried forward to Summary Page)
1005168 – ALTRON WOODLANDS - HVAC INSTALLATION VI.A6

VI.A6 - SCHEDULE OF INFORMATION

The information below shall be supplied by the tenderer and shall be deemed to comply with the
specification unless deviations from the specification are specifically pointed out in writing in the
tender by the tenderer.

VI.D4.05.02 - MANUALLY ADJUSTABLE AIR DAMPER

1. Make :
2. Name of supplier :
3. Model and type :

VI.D6.01 - AIR DISTRIBUTION SYSTEM

1. Name of supplier :
2. Applicable standard, test bureau
or code of practice :

VI.D6.02 - WATER PIPING SYSTEM

1. Name of supplier :
2. Applicable standard, test bureau
or code of practice :

VI.D6.03 - REFRIGERANT PIPING SYSTEM

1. Name of supplier :
2. Applicable standard, test bureau
or code of practice :

VI.D10.01.04 - SPLIT TYPE AIR CONDITIONING UNIT COMPLETE WITH REMOTE AIR COOLED
CONDENSER

1. Make :
2. Name of supplier :
3. Model and type :
4. Country of origin :
5. Applicable standard, test bureau
6. or code of practice :

VI.D11.01 - CHILLED WATER FAN COIL UNIT

1. Make :
2. Name of supplier :
3. Model and type :

VI.D16.02 - CONSTANT VOLUME SQUARE OR ROUND CEILING AIR TERMINAL

1. Make :
2. Name of supplier :
3. Model and type :
4. Country of origin :
5. Applicable standard, test bureau
or code of practice :

MAY 2024 1
Revision 0
1005168 – ALTRON WOODLANDS - HVAC INSTALLATION VI.A6

VI.D20.01 – VARIABLE REFRIGERANT VOLUME SYSTEM

1. Make :
2. Name of supplier :
3. Model and type :
4. Country of origin :
5. Applicable standard, test bureau
or code of practice :

MAY 2024 2
Revision 0
Rev. 0
ALTRON HVAC Points List
Issued: May 2024

Function Legend Signal Legend Link Protocol Legend

A - Alarm AI - Analogue Input VF - Voltage Free Contact


S - Status AO - Analogue Output IO - Input Output Unit
S/S - Stop/Start DI - Digital Input OP - OPC
S/P - Set Point DO - Digital Output MB - MODBUS
M - Monitoring PI - Pulsed Input LW - LONWORKS
C - Control PO - Pulsed Output BN - BACNET

A1 BMS SYSTEM STRUCTURE


Main Graphic Screens 5
B2 COMMUNICATION INTERFACE HARDWARE
B2.1 Computer Station 1
C COMMISSIONING 1
D 12 MONTHS GUARANTEE AND MAINTENANCE 1
E BUILDING TUNING AND RE-COMMISSIONING 1
F SMS Alarms 10
Point
HVAC Plant / Plant Room / Distribution Board Information
Information
FUNCTION Quantity Schedule Link Description
No Plant Room / DB Location Equipment Description
AI AO DI DO PI PO Protocol

1 Fan Coil Units -


Fans S/S and S 7 7 BN FCU start/stop
Room Temperature 7 BN Indication
Heaters 7 BN Heating status
Cooling Valve 7 BN Cooling Status
Room Temperature set point 7 BN Adjustment
Supply temperature 7 HARD

2 VRF units - New Condensing unit Systems S/S and S 2 2 BN Start/stop and status
Ceiling Concealed DX units S/S and S 2 2 BN Start/stop and status
Room Temperature 2 BN Indication
Heating/Cooling Mode 2 BN Indication
Room Temperature set point 2 BN Adjustment
Supply temperature 2 HARD

TOTAL 20 9 25 11 0 0 65