Dt: 02.06.

24
Pending Deficiencies of Joint Inspection of P&C and Track Circuits
SI Item
Station Pending Deficiencies
No Category
1 Point No. 101A M.S flat tie bar to be provided. B
2 Point No. 101B M.S flat tie bar to be provided. B
3 Point No. 102A MS flat tie bar to be provided. B
4 Point No. 102B MS flat tie bar to be provided. B
5 Point No. 103A MS flat tie bar to be provided. B
SDV 13.04.24
6 Point No. 105A MS flat tie bar to be provided. B
7 Point No. 105B MS flat tie bar to be provided. B
8 Point No. 106A MS flat tie bar to be provided. B
9 Point No. 106B MS flat tie bar to be provided. B
10 Point No. 104B RH tongue rail chipped off to a length of 100mm to be attended. B
11 Point No. 101A MS flat tie bar to be provided. B
12 Point No. 101B MS flat tie bar to be provided. B
GID 15.04.24
13 Point No. 105A MS flat tie bar to be provided. B
14 Point No. 105B MS flat tie bar to be provided. B
REM
15 Point No. 8B chair plate rubber pads to be replaced. B
06.05.24
16 Point No. 109 LH side opening to be attended. B
17 Point No. 108A chair plate bolts loose to be attended. B
CBM
18 105AT, 108AT, 02AT, 02BT pendrol clips & GFN liners to be provided.
18.05.24 Glued joints No. 27, 29, 45, 52, 63, 72, 81 missing / damaged GFN liners/ pendrol clips to be
19
provided.
20 Point No. 8A packing required. B
21 Point No. 14A 1st stretcher bar to be replaced. B
22 Point No. 14A packing required. B
23 CTYL Point No. 27B both sides housing to be improved. B
24 18.05.2024 Point No. 12A both sides opening to be adjusted. B
25 Point No. 13B point Toe out of square, same to be attended. B
26 Point No. 13B RH tongue rail floating to be attended. B
27 Point No. 14B point Toe, out of square, same to be attended. Gauge+8mm to be attended. A
28 Point No. 12A tongue rail rubbing on 1st (G.T plate) sleeper to be attended. B
TLU 21.05.24
29 Point No. 19B both sides opening to be attended. B
30 Point No. 22A, RH side housing & rubbing of chair plate to be attended. B
31 Point No. 22B crushed rubber pads to be replaced. B
32 Point No. 25B crushed rubber pads to be replaced. B
33 Point No. 16A crushed rubber pads to be replaced. B
34 Point No. 16B crushed rubber pads to be replaced. B
35 Point No. 17A crushed rubber pads to be replaced. B
GJJ 23.05.24
36 Point No. 17B crushed rubber pads to be replaced. B
37 Point No. 18B opening RH & LH side and crushed rubber pads to be replaced. B
38 Point No. 21B crushed rubber pads and LH side split to be attended. B
39 Point No. 27 cross level to be attended. A
40 7T, 3/6T, 16BT, 19BT tracks GFN liners missing to be provided.
41 Glued joints 27, 33, 57, 62, 94 & 123 missing/ damaged GFN liners to be provided.
42 Point No. 18B leading stretcher bar insulation to be replaced. B
43 Point No. 13B LH side stock rail burr to be removed. B
PPM
44 Point No. 11A LH side housing to be improved. B
27.05.24
45 Point No. 20B gap between stock rail and stretcher bar to be attended. B
46 Point No. 19B both side opening to be attended. B
47 Point No. 14B M.S flat tie bar to be provided. B
48 CMZ Point No. 14B LH opening to be adjusted. B
49 27.05.24 Point No. 7B M.S flat tie bar to be provided. B
50 Point No. 8B M.S flat tie bar to be provided. B
51 Point No. 14A LH housing to be attended. B
52 Point No. 14A RH side floating to be attended. B
53 Point No. 14B RH side tongue rail floating to be attended. B
KADM
54 Point No. 13B 2nd & 3rd stretcher bar insulations to be replaced. B
31.05.24 th
55 Point No. 13B LH side 11 sleeper welding given to be attended. B
56 Point No. 8A LH Side floating to be attended. B
57 Point No. 7B LH/RH housing to be attended. B
58 Point no. 18A packing to be attended. B
59 Point No. 14B RH side bur to be cleared. B
60 Point No. 13A LH side housing to be improved. B
61 Point No. 13B RH side housing to be improved. B
62 NLPI Point No. 13A opening to be attended. B
63 01.06.24 14AT ballast to be cleared.
64 18AT ballast to be cleared.
65 1LAT & 1LBT ballast to be cleared.
66 2LAT & 2LBT ballast to be cleared.
67 1T 30 Nos missing liners to be provided.