Coursework No 1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Module Design Economics and Cost Planning

Coursework No. 1
Title Project Case Study
Submission Date April 20, 2024
Format Email in PDF format to danalynntan@gmail.com

Task:
Provide a project case study on design economics and cost planning considering the construction
of a commercial office building described below:
The project involves the construction of a 10-story commercial office building in a prime
business district. This structure will showcase modern/contemporary architectural
aesthetics, incorporate energy-saving technologies, and provide cutting-edge amenities
tailored to cater to diverse business needs.

A. Design Economics Considerations:


1. Material Selection – impact of the selection of durable and high-efficiency materials can
impact functionality, aesthetic, maintenance on a long-term period
2. Energy Efficiency – impact of incorporating sustainable elements
3. Space Utilization – impact of maximizing space through efficient floor plans and flexible
designs

B. Cost Planning Strategies:


1. Detailed Cost Estimation – impact of conducting a comprehensive cost estimation process
in consideration of material, labour and plant expenses
2. Value Engineering – impact of collaborating with various stakeholders in identifying potential
optimization opportunities
3. Life Cycle Cost Analysis – impact of evaluating long-term costs associated with building
operation, maintenance, and potential renovations during design phase

C. Outcome:
Drawing from the above points, conclude on describing the critical role of design economics and
cost planning in the successful delivery and economic sustainability of this construction project.

D. Assessment Criteria
Marks awarded for thought process, quality and outline presentation. Provided answers must be
easy to understand and follow.
This task will be given a weighting of 30% for this Module.

You might also like