1 Inlet Chamber
3
Quantity of Flow (Ave) 5.00 m /day
3
Peak Flow 7.50 m /day
3
0.000 m /sec
Assumed Detention period 240.00 sec
3
Volume of the Inlet Chamber 0.02 m
Assumed Depth of flow 1.35 m
2
Area Required for Inlet Chamber 0.02 m
Assumed Length to Breadth Ratio 1.00
Breadth of the Tank 0.20 m
length of the Tank 0.20 m
Provide the Dimension of Inlet Chamber as 0.2 m x 0.2 m x 1.35 m SWD + 0.5 m Freeboard
Provide the Dimension of Grit Removal unit as 0 m x 0.5 m x 0.3 m SWD + 0.5 m Freeboard
Page1 of 6
SBR System - Design Calc Sewage Treatment Plant
Provide the Dimension of Gravity Grease Interceptor as 0.5 m x 0.5 m x 1.5 m SWD + 0.5 m Freeboard
Provide the Dimension of Equalization Tank (Collection Chamber ) as 0.5 m x 1 m x 5 m SWD + 0.5 m Freeboard
Mixing Arrangements
Assumed BOD reduction in the tank 15% %
Incoming BOD of Raw sewage 400.00 ppm
BOD to be reduced 60 ppm
Outlet BOD 340.00 ppm
Weight of BOD removed 0.5 kg/day
Oxygen required to remove BOD load 1.5 kg/kg of BOD
Oxygen required for BOD load 0.7 kg/day
0.03 kg/hr
Total oxygen required at standard condition (SOR) 1.57
SOTE of diffuser per meter depth 5.60 %
Liquid level of aeration basin 4.50 m
Height at which diffuser are kept 0.30 m
Aeration depth 4.20 m
SOTE above aeration depth 23.52 %
Fraction of oxygen in air 23.20 %
Specific gravity of air 1.20
Air requirement at field condition per basin 10.27 3
Nm /day/basin
Hours of aeration time per day 24.00 hrs
Air required per hour per basin 0.43 3
Nm /hr required air blower capacity
use 1.00 3
Nm /hr at 15% peak factor
3
0.01 Nm /min
Number of diffuersers 0.07 pcs
at 25% factor 0.09
use 1.00 pcs
Page2 of 6
SBR System - Design Calc Sewage Treatment Plant
8 Anoxic Tank
AMN influent, So 25.00 ppm
Nitrogen loading 0.13 kg/d
Operating temperature, T 28.00 °C
Effluent ammonia, AMN 0.50 ppm
Effluent nitrate Nitrogen, N 14.00 ppm
MLVSS/MLSS, fi 0.80 (So-S-N)
NO3- N to be denitrification, Ne 10.50 ppm
Specific denitrification rate, Udn 0.04 /d
Dissolved oxygen, DO 0.20 ppm
(T-20)
Overall ddnitrification rate, U'dn 0.06 Udnx1.09 (1-DO)
Anoxic retention time, HRTdn 0.06 /d NO3-N/(0.8xMLSSxU'dn)
1.41 hrs
3
Anoxic volume required 0.29 m
Number of units 1.00 nos
2
Area of tank required 0.10 m
Depth of tank 3.00 m
Length of tank 0.30 m
Width of tank 0.40 m
Length to Width ratio 1.00
3
Volume of tank provided 0.36 m
Detention time provided 1.73 hrs
3
Volume of tank provided 0.36 m
Provide the Dimension of Anoxic Tank as 0.3 m x 0.4 m x 3 m SWD + 0.5 m Freeboard
9 Aeration tank
No of Tanks 1
Flow - completely mixed
3/
Q- per tank 5.00 m day
BOD 340.00 ppm
MLSS 4000.00
MLVSS 3200.00
Type Aeration - Diffuser type fine bubble
Blowers - 2.00 ( 1W+1SB)
F/M assumed 0.40 (0.15-0.6/day - Ind. 0.15-0.4/day - domestic)
3
Volume of the tank 1.33 m volume of tank as per 13.6 page 226
3
Total volume of tank required 1.33 m
Hydraulic Detention Time 0.00 day
2
Area of the Tank 0.27 m
2
Area for each tank 0.27 m
Assumed Breadth to Length Ratio 1.30
Depth of the tank 5.00 m
Width of the tank 0.5 m
Length of tank 0.6 m
3
Volume of tank provided 1.5 m
3
Decant volume 0.6 m /min30
3
1.2 m /hr
3
0.0 m /min
5.3 gal/min
Provide the Dimension of Aeration tank as 0.6 m x 0.5 m x 5 m SWD + 0.5 m Freeboard
Page3 of 6
SBR System - Design Calc Sewage Treatment Plant
3
Actual requirement of air 4.21 m /hr
3
Total Air Requirement 4.90 m /hr at 15% peak factor
3
Provide 2 Blowers of capacity at 0.45 ksc (1W+ 1 SB) 4.90 m /hr
3
Volumetric loading rate 1.28 kg/m
Xt V = 5312.50
ay Q (Yo – Ye) qc/(1 + ke qc) 1600.00
0.30
0.24
Hydraulic Mean Cell Residence Time 4.15 days
Page4 of 6
SBR System - Design Calc Sewage Treatment Plant
Provide the Dimension of Effluent Tank as 0.3 m x 0.4 m x 5 m SWD + 0.5 m Freeboard
Effluent pump
Operating time 3.00 hrs
3
Tank Volume 0.60 m
3
Pump Capcity 0.20 m /hr
3
use 1.00 m /hr
Provide the Dimension of Sludge Holding Tank as 0.3 m x 0.4 m x 5 m SWD + 0.3 m Freeboard
Air requirement
Mixing using coarse bubble diffuser
3 3
Air required 20.00 (20 or 30m air/1000m tank)
3
Air supply requirement 0.01 m /min
3
0.72 m /hr
3
Air flow per diffuser 0.13 m /min
Nos of diffuser required 0.14
Nos of diffuser provided 1.00
3
Air provided 0.13 m /min
Diffuser submergence 4.70 m (diffuser to be installed 0.3m above tank floor)
3
Qs 0.15 m /min
14 Tertiary System
Provide the Dimension of Multi Media Filter as 30 inches Diamater x with 72 inches Shell height
Page5 of 6
SBR System - Design Calc Sewage Treatment Plant
Provide the Dimension of Activated Carbon Filter as 30 inches Diameter x with 72 inches Shell height
Page6 of 6