surface. 2 Check the area when false ceiling to be fixed is clean. 3 Check the clearance from electrical team. 4 Check the clearance from fire team in case false ceiling is to cover fire pipes. 5 Check that the hangers and horizontal members (G.I) are placed equally and are in sufficient members. 6 Check that the gypsum boards used are of approved brands and as per specification. 7 Check the position of trap door. 8 Check the screws to be embedded inside the board thickness. 9 Check the line, level and right angle of the gypsum board fixed. 10 Check for no sagging & hogging state at the bottom of false ceiling after final finish with jointing compound. CONTRACTOR- SITE ENGINEER- QA/QC ENGINEER- PROJECT MANAGER-