SR NO ACTIVITY TO BE DONE ACCEPTANCE CRITERIA OBSERVATION
WITH DEVIATION
A PRE PLUMBING WORK
1 Manufacturer’s test certificate/installation guide available. 2 Architectural/plumbing drawing available on site. 3 Proper lighting arrangement ensured in dark areas. 4 Toilet walls marked with tile fixing positions. 5 Toilet floor is marked with positions of EWC, bath tub and other WC fittings. 6 Tile thiyyas are taken as specified to decide finished tile level. 7 Positions of flush tank marked on walls. 8 Drainage outlet holes marked on walls. 9 All the trap positions marked. 10 Ledge wall masonry work done as per specified. B DURING PLUMBING WORK 11 CPVC pipes were visually inspected for cracks.
12 CPVC pipes are cut and installed as specified.
13 Solvent cement used for jointing CPVC pipes as specified. 14 Pipe inserted in fitting by rotating ¼ to ½ turn for even distribution of solvent cement. 15 Plastic clamps from the same manufacturer used at approx. 900mm c/c. C POST PLUMBING WORK 16 Pressure testing carried out as specified (8-10kg/sq.cm or 1 ½ times the design pressure) 17 Leakages, if any are corrected after pressure test. 18 Filling of chases done using non-shrink grout and cured for 4 days.
CONTRACTOR- SITE ENGINEER- QA/QC ENGINEER- PROJECT MANAGER-