PREPARED BY- Quality team

CHECKLIST FOR STEEL

PROJECT NAME- DATE-

SR NO ACTIVITY TO BE DONE ACCEPTANCE CRITERIA OBSERVATION


WITH DEVIATION

1 Reinforcement steel placed as per structural


drawing.

2 Bar bending schedule prepared.

3 Connection of bars to existing dowels checked


for alignment.

4 Placing of bar diameter, number, spacing


match with the construction schedule.

5 Check rebars are straight.

6 Check hooks and bends are placed as specified


by structural consultant.

7 Lap length, position of lap is ok.

8 Check the clear cover.

9 Check cover blocks are enough.

10 Maintain records and getting approval for


additional reinforcement not shown in
drawings.

11 To check the construction joint for proper


concrete bonding before placing
reinforcement.
PREPARED BY- Quality team

12 Check for test reports for steel and approved


brand.

13 Identification color coding ok.

14 Check the rebars are rust free.

15 Check the rebars are crack free.

16 Check minimum 1 inch clear distance is


maintained between two bars.

17 Check the rods are tied properly with binding


wire.

CONTRACTOR- SITE ENGINEER- QA/QC ENGINEER- PROJECT MANAGER-