Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Total Loss Measurement

(Result from OTDR)

Project Name : FO Implementasi 1 site Local Loop Fibernet for Bili-bili Inspection date : ………………………

Segment : Pekerjaan Implementasi FO Segmen Bili bili From (A) : Bili-bili


to IDC Makassar
Sub-Segment : To (B) : IDC Makassar

Test Equipment : Cable Length Core 1 : Bili-bili to IDC Makassar : 1475,98 m


Wavelength : 1310 nm Total Joints :

Fiber Fiber Fiber Fiber Fiber


Span Average Span Average Span Average Span Average Span Average
No. No. No. No. No.
Loss Loss Loss Loss Loss Loss Loss Loss Loss Loss
1 A-B 0,771 24,256 13 A-B 25 A-B 37 A-B A-B
2 A-B 2,834 26,336 14 A-B 26 A-B 38 A-B A-B
3 A-B 0,773 24,265 15 A-B 27 A-B 39 A-B A-B
4 A-B 0,773 24,265 16 A-B 28 A-B 40 A-B A-B
5 A-B 0,978 26,452 17 A-B 29 A-B 41 A-B A-B
6 A-B 0,098 1,575 18 A-B 30 A-B 42 A-B A-B
7 A-B 1,479 0 19 A-B 31 A-B 43 A-B A-B
8 A-B 1,48 0 20 A-B 32 A-B 44 A-B A-B
9 A-B 1,48 0 21 A-B 33 A-B 45 A-B A-B
10 A-B 1,48 0 22 A-B 34 A-B 46 A-B A-B
11 A-B 1,48 0 23 A-B 35 A-B 47 A-B A-B
12 A-B 1,48 0 24 A-B 36 A-B 48 A-B A-B

Note:
*) Total Loss < ( Cable length in Km x 0.3 dB/Km) + (Total Joint x 0.15 dB) + (Total Connector x 0.5 dB)
Total Loss < (1,47598 x 0,3 dB/Km ) + ( 1 x 0,15 dB ) + ( 0 x 0,5 ) = 1,0925dB

Makassar , 23 / April / 2024

PT. Tiga Suku Indonesia PT.Inti Bangun Sejahtera,Tbk

Zainal Abidin 1 _________________


Project Supervisor Project Supervisor

OSP-UJT-FRM013
Page ___ of ___

You might also like