Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Project name: DMHS - Lokasi Pak Soleh Date: 2024-06-05 to 2024-06-05

Log reference: DMH2 Location: -


Drilling contractor: Tim BOR Drill bit diam (mm): 76.2 Country: Indonesia
Driller name: Asriyadi / Amran Total drill depth (m): Lat/Lon: -0.23181167, 116.95888333
Drilling method: Open Hole / Cutting Total well depth (m): Altitude (m):
Drilling successful? Well devel.: Yield (l/m):
Water table (mbgl):

Drill time (hrs)

Water level
Depth (m)

pump
Lithology Lining Annular backfill

0
TOPSOIL, slightly sandy.
Kuning jingga, tekstur liat
berpasir.
1

3
CLAY, clayey. Abu-abu cerah,
tekstur liat.

CLAY, clayey. Abu-abu gelap,


8 bercampur karbon (maj) / roof.

9
SAMPLE MISSING. Bb (+/- 15 cm
-sisipan 15 cm).
10
CLAY, slightly sandy. Abu-abu
gelap bercampur karbon
(minor).
11
SAMPLE MISSING. Bb +/- 10 cm.

CLAY, clayey. Abu-abu agak


12 gelap, tekstur liat.

SILT, medium to coarse,


clayey. Abu-abu gelap, tekstur
13 agak keras.

14

15
Log created by: Site info: Drill info:
Company name: Tim BOR Gajah Mada (KM7) BB (Depth. 9.20 m 15 cm -sisipan 15 cm) BB
Logged by: Dede Yusuf.ST (Depth 10 m BB +/-10 cm)

Digital tools for Groundwater Development is a product by Practica Foundation, with support from Groundwater Relief and MSF 7dc7d16a-0cd2434c

You might also like