Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Project name: DMHS - Lokasi Pak Soleh Date: 2024-06-05 to 2024-06-05

Log reference: DMH1 Location: -


Drilling contractor: Tim BOR Drill bit diam (mm): 76.2 Country: Indonesia
Driller name: Asriyadi / Amran Total drill depth (m): 15 Lat/Lon: -0.23190000, 116.95909833
Drilling method: Open Hole / Cutting Total well depth (m): Altitude (m):
Drilling successful? Yes Well devel.: Yield (l/m):
Water table (mbgl):

Drill time (hrs)

Water level
Depth (m)

pump
Lithology Lining Annular backfill

0
TOPSOIL, slightly sandy.
Kuning jingga, tekstur liat
berpasir (kuarsa minor).
1

CLAY, clayey. Abu-abu


8 bercampur karbon (maj).

9
SAMPLE MISSING. Bb (+/- 15 cm
sisipan +/-15cm).

10 SILT, medium to coarse,


clayey. Abu-abu tua bercampur
karbon (maj).

11 SAMPLE MISSING. Bb (+/- 10cm).

CLAY, clayey. Abu-abu cerah,


tekstur liat.
12

13
SILT STONE. Abu-abu gelap.

14

15
Log created by: Site info: Drill info:
Company name: Tim BOR Gajah Mada (KM. 7) BB (Depth. 9.15m 15 cm -sisipan 15 cm) BB
Logged by: Dede Yusuf. ST (Depth 10 m BB +/-10 cm)

Digital tools for Groundwater Development is a product by Practica Foundation, with support from Groundwater Relief and MSF 7dc7d16a-e95df610

You might also like