Project name: Proj.

Camp Hui - Tanah Bapak Uli (Angga) Date: 2024-05-24 to 2024-05-24


Log reference: DS5 Location: -
Drilling contractor: Tim BOR Drill bit diam (mm): 76.2 Country: Indonesia
Driller name: Asriyadi Total drill depth (m): 15 Lat/Lon: -0.26393167, 116.92596833
Drilling method: Open Hole / Cutting Total well depth (m): Altitude (m):
Drilling successful? Yes Well devel.: Yield (l/m):
Water table (mbgl):

Drill time (hrs)

Water level
Depth (m)

pump
Lithology Lining Annular backfill

0
TOPSOIL, very clayey. Tanah
liat/lempung kuning cerah dan
berpasir, terdapat hasil
1 cutting dari batuan
kuarsa/padas..

SILT, fine, slightly silty.


5 Berwarna abu abu gelap, dengan
bercampur sedikit karbon.
SILT STONE. Berwarna abu-abu
6 cenderung gelap dg tekstur
bercampur karbon ( menipis).

SILT STONE. Berwarna abu abu 1.5


8 cenderung gelap bercampur
dengan parting dan karbon
batubara .
9

10

11
SILT STONE. Abu abu gelap,
tekstur agak keras berbutir
halus. terdapat karbon dan
12 serpihan batubara.

13

14

15
Log created by: Site info: Drill info:
Company name: Tim BOR Kamp Hui (Sebulu)
Logged by: Dede Yusuf.,ST.