Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

Aluminium Bahrain (ALBA) Power Station-5 Expansion at

1800MW CCPP Construction site, Air-Cooled Condenser


Installation Project
Hazard Hunt Report HSEP-00-F-102-C
Campaign Type Office and Porta Cabins Inspection
Inspector Iftikhar Malik, Anwaar Ul-Haq, Kamran Nazir (Encogroup)
Inspection Premises ACC west side
Inspection Date: 30.10.2019
Total Finding Closed Opened Positive Previous
14 14 0 0 0
Prepared by Reviewed by Reviewed by Reviewed by Reviewed by
HSE Supervisor HSE Manager HRSG Const Manager ACC Const Manager Site Manager
Anwaar Ul-Haq Iftikhar Malik Majed Ahmed Jean Sayah Nizar Elhed
Signature: Signature: Signature: Signature: Signature:

Finding Target Positive


01 Opened Closed
Ref No: Date Finding/ Info
Finding description (Area) Description of taken action
A walkway structure left opened, did not secure the end. Instructed foreman and got made rectified.

Location Reported By
THB Roof-2 Pearlson (AEIS)
Likelihoods: Responsible Person/ Group Signature:

Personnel falling could lead to serious injuries.

Before After

ENCO-HSEP-100-F-102-C-Hazard Hunt Report Page 1 of 9


Finding Target Positive
02 Opened Closed
Ref No: Date Finding/ Info
Finding description (Area) Description of taken action
Gratings kept on the walkway. Instructed Supervisor and removed the material.

Location Reported By
ACC-2 East Fazal Amin
Likelihoods: Responsible Person/ Group Signature:

Slip and trip, fall over, falling objects, serious personnel


Jerin (Mech Supervisor)
injuries.
Before After

Finding Target Positive


03 Opened Closed
Ref No: Date Finding/ Info
Finding description (Area) Description of taken action
Loose material left on the walkway. Instructed Supervisor and removed the material.

Location Reported By
ACC-2 West Fazal Amin
Likelihoods: Responsible Person/ Group Signature:

Slip and trip, fall over, falling objects, serious personnel


Jerin (Mech Supervisor)
injuries.
Before After

ENCO-HSEP-100-F-102-C-Hazard Hunt Report Page 2 of 9


Finding Target Positive
04 Opened Closed
Ref No: Date Finding/ Info
Finding description (Area) Description of taken action
Housekeeping did not perform, material left in the task Instructed Supervisor and removed the material and made
area. housekeeping.

Location Reported By
ACC-3 South Fazal Amin
Likelihoods: Responsible Person/ Group Signature:

Slip and trip, objects, Personnel injuries


Patel (Mech Supervisor)
Before After

Finding Target Positive


05 Opened Closed
Ref No: Date Finding/ Info
Finding description (Area) Description of taken action
Loose material kept on the grating platform without any Instructed Supervisor and removed the material.
protection.

Location Reported By
ACC-3 West Fazal Amin
Likelihoods: Responsible Person/ Group Signature:

Falling objects, Personnel injuries.


Jerin (Mech Supervisor)
Before After

ENCO-HSEP-100-F-102-C-Hazard Hunt Report Page 3 of 9


Finding Target Positive
06 Opened Closed
Ref No: Date Finding/ Info
Finding description (Area) Description of taken action
Loose material kept on the grating platform without any Instructed Supervisor and removed the material.
protection.

Location Reported By
ACC-2 West Fazal Amin
Likelihoods: Responsible Person/ Group Signature:

Falling objects, Personnel injuries.


Jerin (Mech Supervisor)
Before After

Finding Target Positive


07 Opened Closed
Ref No: Date Finding/ Info
Finding description (Area) Description of taken action
Loose material kept on the grating platform without any Assigned housekeeping team and removed material.
protection.

Location Reported By
ACC-3 Condensate Tank Umer Razzaq
Likelihoods: Responsible Person/ Group Signature:

Falling objects, Personnel injuries.


Tiju (Mech Supervisor)
Before After

ENCO-HSEP-100-F-102-C-Hazard Hunt Report Page 4 of 9


Finding Target Positive
08 Opened Closed
Ref No: Date Finding/ Info
Finding description (Area) Description of taken action
Loose material kept on the grating platform without any Assigned housekeeping team and removed material.
protection.

Location Reported By
ACC-3 Condensate Tank Umer Razzaq
Likelihoods: Responsible Person/ Group Signature:

Falling objects, Personnel injuries.


Tiju (Mech Supervisor)
Before After

Finding Target Positive


09 Opened Closed
Ref No: Date Finding/ Info
Finding description (Area) Description of taken action
Poor housekeeping observed on the scaffold. Assigned housekeeping team and removed material.

Location Reported By
ACC-3 Condensate Tank Umer Razzaq
Likelihoods: Responsible Person/ Group Signature:

Falling objects, Personnel injuries.


Tiju (Mech Supervisor)
Before After

ENCO-HSEP-100-F-102-C-Hazard Hunt Report Page 5 of 9


Finding Target Positive
10 Opened Closed
Ref No: Date Finding/ Info
Finding description (Area) Description of taken action
Poor housekeeping, unwanted cables left at task location. Assigned housekeeping team and removed material and
cables.

Location Reported By
ACC-3 Condensate Tank Ummer Razzaq
Likelihoods: Responsible Person/ Group Signature:

Falling objects, Personnel injuries.


Tiju (Mech Supervisor)
Before After

Finding Target Positive


11 Opened Closed
Ref No: Date Finding/ Info
Finding description (Area) Description of taken action
Un protected loose material left at task location, on the Assigned housekeeping team and removed material.
grating.

Location Reported By
THB Roof Stair case Hameed Khan
Likelihoods: Responsible Person/ Group Signature:

Falling objects, Personnel injuries.


Tiju (Mech Supervisor)
Before After

ENCO-HSEP-100-F-102-C-Hazard Hunt Report Page 6 of 9


Finding Target Positive
12 Opened Closed
Ref No: Date Finding/ Info
Finding description (Area) Description of taken action
Un protected loose material left at task location, on the Assigned housekeeping team and removed material.
grating.

Location Reported By
THB Roof Stair case Hameed Khan
Likelihoods: Responsible Person/ Group Signature:

Falling objects, Personnel injuries.


Chubey (Mech Foreman)
Before After

Finding Target Positive


13 Opened Closed
Ref No: Date Finding/ Info
Finding description (Area) Description of taken action
Structural material left on the roof. Informed foreman and removed material.

Location Reported By
THB Roof Hameed Khan
Likelihoods: Responsible Person/ Group Signature:

Falling objects, Personnel injuries.


Chubey (Mech Foreman)
Before After

ENCO-HSEP-100-F-102-C-Hazard Hunt Report Page 7 of 9


Finding Target Positive
14 Opened Closed
Ref No: Date Finding/ Info
Finding description (Area) Description of taken action
Unwanted material left on the scaffold platform. Informed foreman and removed material.

Location Reported By
ACC3 Scaffold Umer Razzaq
Likelihoods: Responsible Person/ Group Signature:

Falling objects, Personnel injuries.


Parkash (Mech Foreman)
Before After

ENCO-HSEP-100-F-102-C-Hazard Hunt Report Page 8 of 9


Previous Day’s Opened Issues
Finding Target Positive
Opened Closed
Ref No: Date Finding/ Info
Finding description (Area) Description of taken action
N/A

Location Reported By

Likelihoods: Responsible Person/ Group Signature:

Before After

END

ENCO-HSEP-100-F-102-C-Hazard Hunt Report Page 9 of 9