e. Technical manuals
b. Verifying the test results with respect to the acceptance criteria wherever
applicable
d. Archiving the completed test results as per the approved archiving system .
The contractor testing engineer shall Follow the instructions below for
conducting the SAS GPS testing
Check as per the hardware specification the GPS has the correct number of
following :
a. GPS model
b. Number of port
c. Type of all port
d. Power supply type ( AC/DC)
e. IRIG – B output
f. Burden (VA)
4.0 REFERENCES
This document shall comply in accordance with the existing Company’s Rules and Regulations.
Any modifications therein found not conformance with the document shall be declared invalid.
For clarification and verification on this document, contact the following:
Substation
Bay
SAS Panel Name
Device Name Serial No
Not
Capabilities Checked N.A Remarks
Checked
GPS model
Number of port
Filtering of Events at
Device Level
__________________ __________________
Date Date