AMT-HS-F-0001

HSE DOCUMENT SUBMITTAL RESPONSE SHEET

Abdulmohsen Al Project
Contractor: 11.TB.02.011C44
Tamimi Group Number:
Project Builder Works Package for Rose Wood At
Reviewer: RSG/AMAALA
Name: AMAALA Triple Bay.
1TB02011-
Document Document
011C44-PLN-HS- Health and Safety Plan
Number: Title:
0001.C1
No. RSG/AMAALA Comments Contractor’s Response
1 Missing signature Included in Document Approval; Page 1

2 Below provided certificate is expired. Included in Section 2; Page 8

3 Replace with RSG Included in Section 2.1; Page 9

4 Replace with TBA Included in Section 2.1; Page 9


Replace with Rosewood, below drawing is Included in Section 2.5; Page 12
5
for Six Senses.
In addition, a separate HSE policy to be Included in Section 2.5; Page 14
prepared for Rosewood Project and
6
undersigned by the project director/Project
Manager of Tamimi for Rosewood.
AMAALA's Three Cornerstone Health and Included in Section 4; Page 15
Safety Pillars to be incorporated and
7
establish Tamimi's commitment towards
the program.
Org Chart is not legible, a site-specific org Included in Section 7; Page 25
8
chart to be prepared and attached.
9 TBT and Pre-start briefing to be included. Included in Section 8; Page 29
10 Internal and external (Third party) training Included in Section 8.4; Page 32
requirements to be added.
11 Process of training assessment to ensure Included in Section 8.4; Page 32
the quality to be added.
Process of nonconformities and corrective Included in Section 9; Page 32
12 action (internal and external) to be
considered.
Incorporate ISOS and The helicopter Included in Section 10; Page 34
13 company to the incident management and
notification and incident elevation.
Throughout the whole document, any Amended throughout the whole document.
14 reference of TRSDC to be replaced with
RSG/AMAALA
Add a section for Health and Safety Included in Section 12; Page 41
15 Meeting requirements in compliance with
RSG
16 Ensure the PPE requirements are Included in Section 12; Page 42
complied with RSG requirements which
Rev 00 Effective 27/07/2023
AMT-HS-F-0001

includes but not limited to hard hat colour


coding.
Make sure below requirements are in Included in Section 13; Page 42
17
compliance with RSG requirements.
Add Pre-Mobilization Medical screening Included in Section 13.1.4; Page 43
18
program.
Minimum one medical drill to be Included in Section 13.1.6; Page 44
19
conducted as per RSG requirements.
Ensure welfare arrangements are Included in Section 14; Page 47
provided in compliance with RSG. Provide
20
the table of the requirements based on
RSG.
Site specific emergency contact to be Included in Section 17; Page 132
21
provided.
Consider the responsibilities of permit Included in Section 18.1; Page 135
22
issuer and receiver.
Ensure the below matrix are in compliance Compliance
23
with Saudi Legislation
Provide reference numbers of all relevant Included in Section 20; Page 152
RSG/AMAALA H&S documents that are
24
used to prepare contractor's HSE plan to
ensure the compliance
Health and Safety operational
management of activities associated with
the contractor according to the scope of
work shall be discussed in H&S plan such
as but not limited to:
25 Heat stress Management Included in Section 16.1; Page 58

26 Management of Night work Included in Section 16.2; Page 63


Ladders/ Scaffold Included in Section 16.3 & 16.4; Page 66 & Page
27
71
28 Temporary electrics Included in Section 16.5; Page 82

29 Plant and Equipment Included in Section 16.6; Page 95

30 Tools and Power tools Included in Section 16.7; Page 105

31 Work at height and fall protection Included in Section 16.8; Page 110

32 Fire Prevention and control Included in Section 16.9; Page 113

33 Confined space Included in Section 16.10; Page 115

34 Excavation and backfilling Included in Section 16.11; Page 117

35 Hot works Included in Section 16.12; Page 120

36 Lifting Included in Section 16.13; Page 121

37 Civil Works/Concrete Included in Section 16.14; Page 123

Rev 00 Effective 27/07/2023


AMT-HS-F-0001

38 Manual Handling/Brick laying Included in Section 16.15; Page 126

39 MEP works/LOTO Included in Section 16.16; Page 128

Rev 00 Effective 27/07/2023