SURFACE PREPARATION AND PAINTING WORK Document number:
NISL -PLN-HSE-0001
HSSE PLAN
Revision: B Status: IFR
Document Type: PLN Discipline: HSE Date: 29 Sept. 2023
Page 2 of 9
WORK METHOD STATEMENT Document number:
TSNL -ENG-WMS- 0011
METHOD STATEMENT
Revision: B Status: IFR
Document Type: WMS Discipline: ENG Date: 12 Dec. 2023
TABLE OF CONTENT
1.0 INTRODUCTION…………………………………………………………………..4
2.0 PURPOSE……………………………………………………………………………4
4.0 LOCATION………………………………………………………………………….5
5.1 – Definitions…………………………………………………………………….5
5.2 – Abbreviations…………………………………………………………………6
6.0 REFERENCES…………………………………………………………………….6
Page 3 of 9
WORK METHOD STATEMENT Document number:
TSNL -ENG-WMS- 0011
METHOD STATEMENT
Revision: B Status: IFR
Document Type: WMS Discipline: ENG Date: 12 Dec. 2023
1.0 INTRODUCTION
NAVGAS Limited has contracted TREXM Oil and Gas Services Nigeria Limited to carry out
a thorough Integrity Inspection on Tank 102. The project is aimed at providing Integrity
Inspection for NAVGAS Spherical Tank 102, at Apapa, Lagos State to ensure suitability for
continuous service.
2.0 PURPOSE
The purpose of the Integrity Inspection on the Spherical Storage Tank (Tank 102) is to ensure
the tank is suitable and fit for continuous service until the next inspection due date based on
the history of the equipment and inspection findings.
3.0 SCOPE
This Method Statement highlights guidelines on the inspection scope and methods, and also
the post inspection reporting system. The scope shall cover, but not limited to the following
areas:
- Inspection results showing Tank general arrangement drawing & orientation drawing,
photographs etc. Tank general arrangement drawing shall be provided by the client, but
where general arrangement drawing is not available a field sketch of tank shall be done so as
to aid reporting.
Page 4 of 9
WORK METHOD STATEMENT Document number:
TSNL -ENG-WMS- 0011
METHOD STATEMENT
Revision: B Status: IFR
Document Type: WMS Discipline: ENG Date: 12 Dec. 2023
4.0 LOCATION
5.1. Definitions
Page 5 of 9
WORK METHOD STATEMENT Document number:
TSNL -ENG-WMS- 0011
METHOD STATEMENT
Revision: B Status: IFR
Document Type: WMS Discipline: ENG Date: 12 Dec. 2023
5.2. Abbreviations
6.0 REFERENCES
Integrity assessment by Non-Destructive Examination (NDE) shall be carried out on the in-
service T102 sphere external as per client’s requirements and /or the following in-service
codes API 510, Pressure Vessel and API 570, Piping.
UTM and PAUT data shall be collected by duly qualified NDT technicians, and subsequently
processed and analyzed by appropriately qualified API inspector(s) (API 510, API 570, API).
Magnetic Particle and Dye Penetrant Inspection shall be carried on the tank welds and bottom
plates by a duly certified NDT technicians and further analyzed by the API Inspector
Rope Access techniques as per IRATA standards shall be used to access points for data
collection and inspection.
Page 6 of 9
WORK METHOD STATEMENT Document number:
TSNL -ENG-WMS- 0011
METHOD STATEMENT
Revision: B Status: IFR
Document Type: WMS Discipline: ENG Date: 12 Dec. 2023
10.0 RESPONSIBILITIES
Ensuring that all the preparation and application works are conducted as per the
contract scope of work and requirements.
Ensuring that the advancement of works is accomplished according to the pre-planned
programme and according to the approved method statement.
Ensuring that all the equipment, devices, material or substances needed for executing
the work are available as per planned.
Making sure to co-ordinate with the Client and Personal for the safe and appropriate
execution of the work.
To provide all the essential information and the distribution of responsibilities to the
inspection team.
The Supervisor shall be Responsible for the following:
- The Supervisor shall accomplish his duties by maintaining regular coordination with
the project engineer/line manager, and any other concerned department on daily basis.
Furthermore, to ensure proper distribution of the workforce.
- To provide to the client’s representative with a day-to-day progress report,
highlighting the activities gained and discuss with him/her the planned activities for
the next day.
- Ensuring that the day-to-day work is programmed as planned and to advise the client
rep of any requirement for additional resources.
-To ensure full coordination with the health and safety specialists to maintain a safe
work environment and appropriate housekeeping of the worksite, by practicing the
approved HSE initiatives and further ensure that the work team are well aware of the
same, to prevent incidents/accidents.
Page 7 of 9
WORK METHOD STATEMENT Document number:
TSNL -ENG-WMS- 0011
METHOD STATEMENT
Revision: B Status: IFR
Document Type: WMS Discipline: ENG Date: 12 Dec. 2023
11.0 METHODOLOGY
3. Rope Access Technique will be used to access thickness location at height. Rope access
activities will be carried out in line with IRATA procedure / requirement.
4. Data collected will be analyzed by the API inspector. Anomalies that pose imminent risks
to the spherical Tank and personnel shall be reported on site to the client’s representative or
Inspection lead.
TREXM NDT team shall strictly follow as per the standards / Client’s Health & Safety
recommendations for handling and use of the materials and ensure all involved personnel
shall be aware of the same. The general safety guidelines are given below:
2. The NDT Team will ensure safe working conditions and safe act.
5. Safety equipment (Safety helmet, safety shoes, coveralls, gloves, goggles, face mask as
applicable) to be worn at all times.
6. Personnel working at high will be properly kitted with their harness and closely supervised
by a qualified and certified Irata Level 3 personnel to ensure zero LTI.
Page 8 of 9
WORK METHOD STATEMENT Document number:
TSNL -ENG-WMS- 0011
METHOD STATEMENT
Revision: B Status: IFR
Document Type: WMS Discipline: ENG Date: 12 Dec. 2023
The NDT Team will ensure the site is free of empty bottle water and any other waste
generated during the inspection and barricades shall be completely removed from the site
when the job is completed and equipment moved from site.
The NDT Team shall ensure total site reinstatement to its original state before
commencement of inspection.
Page 9 of 9
Project:
JOB SAFET ANALYSIS
Ref No.:
Rev No.:
JOB SAFETY ANALYSIS (JSA) FOR INTEGRITY INSPECTION OF TANK 102
Page: 1 of 5
SITE / LOCATION : Apapa / Lagos JSA NUMBER DATE: 12/11/2023 NEW JSA PAGE 1 OF _ 3_
JOB INTEGRITY ASSESSMENT OF SPHERE TASK / PROCEDURE: SEE PROCEDURE DOCUMENTS FOR: PAUT, MPI, UT AND DPI.
HAZARD IDENTIFICATION
Surroundings Tools / Equipment PPE Required
Noise Levels Chemicals Hand Tools Pumps Glasses Goggles Face Shield
Lighting Sharp Edges Air Operated Hoses High visibility vest Long sleeves
Ventilation Congested Generator Scaffolding Fire Retardant Clothing
Overhead work Walking Surface Ladders Fire Extinguisher Hard Hat Gloves
Pinch Points Slings Special/Unusual Tools Respirator Safety Harness
Slips/Trips/Falls Weather Electrical Tools / Extension Cords Eye Wash Basin Supplied Air/SCBA
Pier/Water Other Hoist / Cranes / Winches Safety Shoes Hearing Protection
High Voltage Lines Combustibles Mobile Equipment Lifting Slings Protective Hood Personal Floatation
Buried Cables/Pipes/Other Services Ground Fault Circuit Interrupter (GFCI) Protective Clothing for Cutting/Welding
Other ____________________ Other ____________________ Other_______________
Project:
JOB SAFET ANALYSIS
Ref No.:
Rev No.:
JOB SAFETY ANALYSIS (JSA) FOR INTEGRITY INSPECTION OF TANK 102
Page: 2 of 5
Does this work require Lock Out/Tag Out not captured in WCP? Yes No (If Yes, then complete the Lockout / Tag-out section below)
Lockout / Tag-out: Activities involving LO/TO document below and complete the sequence of job steps for the work task. The following should be considered: Electrical, thermal, hydraulic, steam,
gas, gravitational, mechanical, chemical, pneumatic, flammable, toxic or corrosive.
NOTE: Lock and Tag always required. Tag only can be used if equipment cannot be physically locked.
No. Energy Type Energy Magnitude Isolation Status/ Location / Identification / Equipment Identification #
(electrical, (voltage, psi, etc.) device Position (attach sketch if applicable)
pressure, etc.) (see below) (see below)
1
2
Isolation Device: Blind = BL, Valve = V, Block & Bleed = BB, Spool = SP, Switch = SW, Breaker = BR, Chocks/Pins/other Mechanical
Locking Device(s) = MLD Status/Position: Closed =CL, Open = O, Pulled = P, Installed = I, Off = Off, On = On.
Project:
JOB SAFET ANALYSIS
Ref No.:
Rev No.:
JOB SAFETY ANALYSIS (JSA) FOR INTEGRITY INSPECTION OF TANK 102
Page: 3 of 5
Risk Level
Step Description of Task Control Measures/
Potential Hazard Risks Responsible
No. Step H M L Preventive Measures
Mobilize equipment and Vehicular accident. Damage to Property Observe Mobil terminal speed limit of Project Supervisor
personnel to site Falling object. Slip Loss of Lives 15km/hr. Wear appropriate and complete
1 X
and fall. PPE: safety boot, industrial hand gloves, hard
hat, reflective vest, and eye must be on task.
Obtain required Permit Failure to identify Damage to property Obtain and comply with the content of PTW, Project Supervisor
to Work and followed Method Statement,
2 X
required safety
procedure
Working under extreme Prolonged working Injuries to Personnel Ensure cool drinking water is available in the Project Supervisor
hot conditions. in hot conditions can place of work. NDT Level 3
3 result in exhaustion, X Safe methods to overcome heat stress to be Inspector
dehydration and explained to all personnel.
heatstroke.
Tank Visual Inspection Flying particles can Injuries to Personnel Proper use of Hardhat, Safety Eye Google, Project Supervisor
damage eyes, Slip Hand gloves etc NDT Level 3
Leg and/or hand Inspector
4 X
injury. Injury to
hand and skin from
irritation
Clean sphere surface Hand injury from Amputation X Properly clean tank surface by using Project Supervisor
with appropriate cleaning equipment Injuries to Personnel industrial hand gloves. Comply with work NDT Level 3
5
material before work Flying particles can procedures and Use eye goggles where Inspector
commence. damage eyes. necessary
Project:
JOB SAFET ANALYSIS
Ref No.:
Rev No.:
JOB SAFETY ANALYSIS (JSA) FOR INTEGRITY INSPECTION OF TANK 102
Page: 4 of 5
Risk Level
Step Description of Task Control Measures/
Potential Hazard Risks Responsible
No. Step H M L Preventive Measures
Pre-job meeting with all Personnel ignores Damage to Property Discuss all aspect of the integrity works with Project Supervisor
personnel involved in the the scope of job, the project team
inspection project hazards, timelines Ensure that the project team understands the
etc. risks and mitigation measures, scope of work
6 X
stated on the permit
Project Supervisor
NDT –Die Penetrant Inhaling Chemicals Eye Injuries Proper PPE as indicated on MSDS. NDT Level 3
10 X
Testing Skin Irritation Skin Burn/Injuries Certified MPI Inspector. Inspector
Procedure approved by Company.
Project:
JOB SAFET ANALYSIS
Ref No.:
Rev No.:
JOB SAFETY ANALYSIS (JSA) FOR INTEGRITY INSPECTION OF TANK 102
Page: 5 of 5
Risk Level
Step Description of Task Control Measures/
Potential Hazard Risks Responsible
No. Step H M L Preventive Measures
Project Supervisor
NDT –Magnetic Particle Inhaling Chemicals Eye Injuries Proper PPE as indicated on MSDS. NDT Level 3
11 X
Testing Skin Irritation Skin Burn/Injuries Certified MPI Inspector. Inspector
Procedure approved by Company.
Trip and fall Injuries to Personnel Ensure use of Proper PPE Project Supervisor
12 Site Reinstatement / X NDT Level 3
House Keeping Inspector
AUTHORIZATION
Comments if any: All project personnel to adhere to recommendations mentioned above and to work Prepared By: Igho Oghene Approved By:
closely with client HSE Supervisor to ensure there is no LOSS TIME INJURY (LTI) Sign: George Ogbeche
Date: Sign:
Reviewed By: Cyril Obuse
Date:
Sign:
Date: