Professional Documents
Culture Documents
INSTRUMENT
INSTRUMENT
AT HMD SITE
NOTES:
7 1. ALL DIMENSIONS ARE IN MM AND CO-ORDINATES IN METER.
4 2. DIRECTION OFF VALVE AND HAND WHEEL SHALL BE CHECK FOR
INTERFERENCE BEFORE ERECTION
3. PIPE FABRICATOR TO CONFIRM VALVE DIMENSIONS BEFORE
FABRICATING SPOOL PIPE
4. ALL LINES WITH SIZE 1.5"AND BELOW SHALL BE ROUTED AS PER SITE
REQUIREMENT
5. ALL ELEVATIONS REFEREED TO F.F.L. ELEVATION +41.100M
6. ACTUAL DIMENSIONS MAY VARY ON SITE WHILE LAYING THE PIPING
7. FOR SUPPORT PLEASE REFER SUPPORT DETAILS ISSUED
SEPARATELY.
4 8. DESIGN AND TEST PRESSURES HAVE BEEN TAKEN FROM
10149-G42-BBD954-1009
1
2
7
5 6
2