JSA Brickworks TSK
JSA Brickworks TSK
STANDARD ADDITIONA
LEGAL REVISED RESIDUAL RISK RESPONSIBLE
HAZARD IDENTIFICATION CONTROL RISK ASSESSMENT L CONTROL
REQUIREMENT RATING PERSON
MEASURES MEASURES
JOB
RISK RATING RISK RATING P
SEQUENCE P S
NO. PXS XS
/ STEPS
HAZARDS CONSEQUENCES P S
LEVE
SCORE SCOR LEVE
L
E L
1. To control lorries
speeding at site.
(max 15km/h)
Mechanical -Minor injury
2. Workers stay
Struck by -Damage to
away from OSHA 514
moving part of property 2 2 4 L
moving
vehicle/lorry
vehicle/lorry. 1. Project
3. To provide Manager
appropriate PPE 2. Construction
and signal flag. Manager
Delivery of 1. Crane must 3. Engineer
material operate by 4. Supervisor
1. loading and competent 5. Safety
unloading operator. Officer
material 2. Workers stay 6. Safety
Physical
away from lifting Supervisor
Struck/hit by
area. 7. Workers
moving part of -Minor injury FMA ( BOWEC )
3. Designated 2 2 4 L 8. First Aider
material
person to
during lifting
supervise hoisting
activity
and lifting
operation.
4. To provide
appropriate PPE.
competent
person.
2. Crane inspection
Physical before work
Falling object -Damage to commences.
(during lifting property 3. Workers stay
of material) away from lifting
area.
4. Barricade lifting
area. 2. Construction
5. To provide Manager
appropriate PPE. 3. Engineer
4. Supervisor
1. To ensure
Stacking/ 5. Safety
material not
Storing Officer
obstructing any
material at 6. Safety
access way during
site Supervisor
stacking of
7. Workers
Physical material.
8. First Aider
Slip/fall/collap -Serious injury 2. Material to install
se of material -Damage to in proper FMA ( BOWEC )
2 3 6 M
due to poor property platform.
material 3. Routine checking
arrangement to ensure stability
of material.
4. High of material
to monitor.
5. To provide
appropriate PPE.
person to
supervise hoisting
and lifting
operation.
4. To provide
appropriate PPE.
Brick works
lifting of 1. Crane must
brick to operate by 6. Safety
working competent Supervisor
area person. 7. Workers
2. Crane inspection 8. First Aider
Physical -Serious injury
before work
Falling object -Damage to
commences. FMA ( BOWEC )
(during lifting property 2 3 6 M
3. Workers stay
of material)
away from lifting
area.
4. Barricade lifting
area.
5. To provide
appropriate PPE.
1. Manual
handling /lifting
4. Physical should be carry
(Ergonomic) out with correct 1. Project
Improper method. Manager
-Negligible injury
method of 2. Scaffolding 2 2 4 L OSHA 514 2. Construction
Erection of handling erecting by Manager
working activity experience 3. Engineer
platform workers. 4. Supervisor
3. To provide 5. Safety
appropriate PPE. Officer
-Serious injury 1. Proper working 2 3 6 M -FMA 6. Safety
platform for ( BOWEC ) Supervisor
workers. -FMA ACT 7. Workers
2. Scaffolding 8. First Aider
Physical erecting by
JOB SAFETY & HEALTH ANALYSIS
PROJECT /DIV/DEPT: DESCRIPTION OF JOB: PREPARED BY:
CADANGAN PEMBANGUNAN 70 UNIT KEDAI Brickworks Muhamad Adnan Bin Zin
PEJABAT 2 TINGKAT (22’X70’), TAMAN SUTERA
KAJANG
LOCATION: REVIEW BY:
JSA NO: 0001 REV NO: 000
TAMAN SUTERA KAJANG, PHASE 8 Rosli Bin Muhamad
TYPE OF ACTIVITIES: ROUTINE / NON-ROUTINE / APPROVED:
DATE: 01/02/2024 PAGE: 4 of 7
EMERGENCY Mohd Asri Bin Sidek
Workers slip
and fall experience
workers.
3. To provide
appropriate PPE.
Important note:
No activity shall be carried out without: -
1) Authority Approval.
2) Permit To Work (PTW). If any
3) Work task must be conducted by responsible person (Site Spv / PIC) based on the approved Method Of Statement (MST).
4) All workers must have CIDB green Card.
5) First aid box shall be made available at site.
6) Outdoor work must be stopped during bad weather.
7) The hoisting gear giving to access to the caisson shall be subjected to DOSH design approval before it may be used in the work (if any)