On-Going Concrete Pouring: Retaining Wall at Side Fence
On-Going Concrete Pouring: Retaining Wall at Side Fence
Fence
• On-going stone cladding @
main fence
• Possible inspection date for
motorized gate: June 6
Boathouse
• On-going installation of
bamboo bracing
• On-going fabrication of gates
• Remaining bamboo poles to
be installed: 6 pcs