Method Statement: Temporary Removal of Obstructions in
Construction of STG Pipe Rack Foundations at Block 2 Checked By Contractor Checked By SEC/LI when No. Items Before Submitting for Received Approval Name and detail of person from 1 contractor responsible for the supervision Page-4: Paragraph 5 of works. Brief Description of the work to be 2 carried out. (detail methodology under Page-3: Paragraph 1 item 12) Detail Program of work showing timing, 3 sequence and order of activities on daily Page-5: Paragraph 7 basis. Plant and Resource Utilization (Listing 4 daily usage of Plant and Resource for N/A the period of works.) Identification of work Area (sketch, showing operation area, storage area, Attachements: Obstacles @ 5 vehicle and plant movement area). If Pipe Rack Foundations, Block any crane or lifting equipment are used 2 drawing and EA-679403 Jib radius and lifting plan.
6 Access and egress to work area (sketch N/A
indicating boundaries of work area). Proposed Method of cordoning and 7 N/A fencing of the work area (sketch). Provision of access to Plant Operators 8 and pedestrian through the work area if N/A required (sketch indicating access routes). Provision of reduction of noise, dust, 9 N/A vibration and other pollutions.
10 Provision of protection of existing plant N/A
and installation from damage from adjacent construction activities (sketch). Provision of temporary work at the necessary calculations for shoring of 11 existing foundation, structure adjacent to N/A construction works (drawings and calculations sheets).
12 Detailed description of the Methodology Page-5: Paragraph 8
of carrying out the works. Emergency and safety plan specific to 13 Page-5: Paragraph 6 the work place. 14 Risk assessment Page-5: Paragraph 7
15 Requirement of all the relevant permits. Page-5: Paragraph 7.1