How many days upon written notice can a contractor terminate a contract with a valid
reason?
Suspension of work for ___ days by order of any court or other public authority through
no act or fault of the contractor gives the him the right to terminate contract.
True or false, the contractor can terminate contract if the owner should fail to pay the
contractor any sum within 15 days after its award by arbitration
True or false, the contractor can terminate contract if the owner should fail to act upon
any request for payment within 30 days after its certification by the architect.
Who declares bankruptcy as a valid reason for the termination of a contract?
True or false, upon termination of contract and upon the decision of the architect that
materials and equipment left by the contractor which do not belong to him can be used
and rent of such shall be borne by the failing contractor.
True or false, in case of suspension of work, all unpaid work executed including expenses
incurred during suspension shall be evaluated by the architect and charged to the owner.
True or false, the owner has no right to claim liquidated damages if he takes over the
work from the contractor for failure to complete the project
How many days prior to canceling an insurance be given to the owner stipulating the
intention to cancel?
How many percent of the contract amount is the Performance Bond?
How many percent of the contract amount is the Payment Bond?
A contract provision setting forth the damages a party must pay in the event of his breach.
Basic Fee for Physical Planning Type 1 or site such as industrial estates, commercial
centers, sports complex, resorts, etc.
Predecessor of PD 1096
What presidential decree institutionalized the profession of environmental planning?
It is a right enforceable against specific property to secure payment of an obligation.
Minimum basic fee for simple projects.
Minimum basic fee for alterations/renovations.
When the architect is engaged to render opinion or advise, clarification or explanation
on technical matters pertaining to his profession, the minimum basic fee shall be ___.
When rendering service as an expert witness, the architect is compensated ___/ hr.
Minimum basic fee for Group 5 Projects (monumental).
What is Group 6 Project classification?
Minimum Basic fee for housing projects.
60% 2nd-10th Unit
30% 11th and above
Under what classification of Project does Hospitals and Medical Buildings fall?
Under what classification of Project does Stadium fall?
Minimum Per diem paid to the architect if work is beyond 50 kms. From office.
On the remaining 15% work fee of the architect, where does the 5% go.
Repairs and corrective works at the expense of the contractor should be done within how
many days after written notice by owner?
Failure on the part of the contractor to remove condemned work shall give the owner right
to remove said work at contractor's exepense and contractor shall pay the owner the
expenses incurred within how many days from removal by the owner of said work?
Contract time reckoning shall commence on the ___ from receipt of ___.
An area of a city where municipal buildings are grouped.
Any article of property not consisting of or affixed to land plus any interest in land that is
less than a freehold.
No person who is not a citizen of the Philippines may take the board exams or practice
the profession unless the country of his relation allows the same ___.
R.A. 545
AGREEMENT
GENERAL CONDITIONS
SPECIAL PROVISIONS
SPECIFICATIONS
DRAWINGS
FIREWALL
no openings
one hour fire-resistant
minimum open space requirement from density 60-100
minimum size of pocket parks
potable water supply per capita per day
if independent from the developer
far away from pollution or source of contamination
difference between developed and undeveloped area on circulation
not necessary in suitability of site of economic socialized housing
minimum lot area- single detached
minimum lot area- semi detached corner lot
minimum lot area- semi detached rowhouse
minimum lot frontage- single detached
minimum lot frontage- semi detached corner lot
minimum lot frontage- semi detached rowhouse
maximum block length
provide an alley
maximum block length provided by an alley
maximum block length provided by pathwalk
height limitation
minimum horiizontal dimension of courts
minimum size of passageway or street
floor area requirement for single family dwelling unit
minimum ceiling heights
minimum ceiling heights of mezzanine
mezzanine shall not cover the floor area in %
minimum door clear height
minimum door clear height for mezzanine and bathroom
opening of main door
service door/bedroom
bathroom
window opening and floor area
window opening and floor area of bathroom
stairway clear width
maximum riser height
minimum tread width
headroom clearances
maximum height between landings
maximum number of risers w/o handrail
handrail measurement
minimum clearance of handrail to wall
minimum tread of winding stair from 300 mm side
maximim variation in tread and risers
maximim distance between landings required of ladder
electrical requirements
2 units abut each other is re required of
non residential shall not exceed from residential
minimum distance between two dwelling units
minimum distance of roof eaves between two dwelling units
minimum distance between two dwelling units (3-4 storeys)
minimum roof eaves distance of two dwelling units (3-4 storeys)
minimum distance between two dwelling units (more than 4 storeys)
minimum horizontal distance of two dwelling units (more than 4 storeys)
minimum roof eaves distance of two dwelling units (more than 4 storeys)
minimum parking requirement
minimum floor area for multi family dwellin units
exit width w/ occupant load of 50 or less
for every additional occupant load of 25
maximum exit of travel
maximum exit of travel if there is fire extinguisher
maximum dead end corridors
maximum corridor of an interior corridor
maximum allowable slope ramps with 300mm changes in elevation
clear width of stair w/ 2 or more living units
maximum landing width; equal to run
with 3.00 m width of stair
with 3.00 m-3.50 m stair width
above the nosing or tread
maximum distance of travel when above one storey
for 4 or more building storey in height w/ roof slope not greater than 1:3
headroom clearances
lifespan of indigeneous materials
FRONTAGE
Model A and B
Model C
irregular lot
rowhouse
minimum width of alley after 250m block
maximim length of blocklength
4 floors
5-6 floors
7 floors and up
required area of playgrounds/parks for every 1,000 sqm
features that enable the disable person to make use of the primary function
a small recess space in a room or a wall
a break in the sidewalk or traffic island provided w/ an inclined surface to
facilitate mobility of wheelchair
the degree of inclination of the sloped surface expressed in ratio
a sloped surface connecting two or more surface at different levels
a paved footwalk at the side of the street
a strip fastened to the floor usually required to cover the joint where two
types of floor materials meet
an exterior passage for walking along
width of walkway to permit a person in wheelchair to traverse it w/ safety
maximum dimension of turn about spaces
maximum distance between restop
width of corridor for person to traverse w/ wheelchair
entrance depth w/ vestibule
structural opening of door entrances
clear opening of door entrances
minimum dimension of floor area of toilet
minimum dimension of floor area of elevator
minimum width of door elevator
centerline height of topmost buttons of elevator and floor switches
maximum gradient of ramp
maximum length for 1:12 ramp
minimum length of landing for the 1:12 ramp
level area at the top and bottom of any ramp
handrail level on both edges
length of extension in a handrail from ramp
height of curbs in a ramp
parking slot width
maximum height of tresholds
provision of one fountain
height of the rim of the fountain from the floor
unobstructed clear space for public telephones
height of dialling from floor of a telephone booth
clear opening of telephone booths
regular buses
air conditioned bus
passenger trains
passenger airplanes
4-50 seating capacity
51-300 seating capacity
301-500 seating capacity
10%
50%
85%
PHP 500.00
12%
6%
8%
Architect
3 months
General conditions
Schedule of material and finishes
Quotation
Certificate of payment
Performance bond
Bid
7%
Closed specification
Instruction to bidders
2 months
12 months / 1 yr
30 days
Statute of Limitation
Statutory Bond
Statute of Frauds
Lease
Leasehold
Lessee
Lessor
2-2.5
Multiple of Direct
TRUE
Percentage of Construction Cost
Multiple of Direct
50 kms.
Architect
Letter of transmittal
3
Contractor
TRUE
Owner
Contractor
1-1.5%
1.5-3%
Firm Fixed Price
Fixed Price Incentive
CPIF / CPAF
(1/6)
2%
Civil Code
Payment Bond
Lump Sum / Fixed Fee
2-5%
Project Manager
TRUE
Project Manager
Public / People
PD 223
People / Public
Bid Bulletin
Proposal
Proposal Bond
Special Provisions
Specifications
Written Notice
Work
Install
Furnish
Provide
50%
65%
30%
30%
2.5
12 sqm.
50 / Contractor
Specifications
15 Days
15 Days
90 Days
Contractor
TRUE
TRUE
FALSE
10 days
15%
15%
Penalty Clause
5,000 for First 50 Hectares
R.A. 6451
PD 1308
Liens
6%
50%
200 / hr
500
12%
Repetitive Construction
10% of 1st unit
10 days
7th day / Notice to Proceed
Civic Center
Chattel
Reciprocity
CELLULOSE NITRATE
PYROXYLIN
COMBUSTIBLE LIQUID
CORROSIVE LIQUID
CRYOGENIC
DAMPER
DISTILLATION
ELECTRIC ARC
EMBER
FIRE
FLASH POINT
FORGING
FULMINATE
HYPERGOLIC FUEL
OXIDIZING MATERIAL
PYROPHORIC
REFINING
SMELTING
CONTRACT DOCUMENTS
PROJECT REP.
PROPOSAL
PROPOSAL BOND (5%)
INVITATION TO BID
BID BULLETIN
INSTRUCTION TO BIDDERS
DRAWINGS
GENERAL CONDITIONS
SPECIAL PROVISIONS
SPECIFICATIONS
SUPPLEMENTARY SPECS.
SCHED. OF MATERIALS
AND FINISHES
BREAKDO
WRITTEN NOTICE
ACT OF GOD OR
TIME LIMITS
WORK
FURNISH
INSTALL
PROVIDE
HECTARES
151-225
225 ABOVE
HECTARES
150 BELOW
151-225
ABOVE 225
50%
20%
10%
5%
30%
100 sqm
43 li.
75 li
25 mts.
TYPE OF PAVEMENT
SLOPE
72 sqm
54 sqm
36 sqm
8m
6m
3.5 m
250 m
250 up to 400 m
150 m
100 m
2 STOREY
2.00 m
1.20 m
20 sqm
2.00 m
1.80 m
50%
2.00 m
1.80 m
.80 m
.70 m
.60 m
10 % opening
1 over 20
.60 m
.25 m
.20 m
2.00 m
3.60 m
4 steps
.80 m - 1.20 m
38 mm
150 mm
5 mm
1.80 m
1 light and 1 conv. outlet
4" thk fireblock
25%
4.00 m
1.5
6.00 m
2.00 m
10.00 m
6.00 m
1.00 m
1 for every 20 units
36.00 sqm
.80 m
plus .15 m
45.00 m
60.00 m
12 m
25%
15%
.90 m
1.20 m
one handrail
two handrails
.80 m - 1.00 m
24.00 m
one stairwell
2.00 m
25 years
ALLEY
BLOCK
CLUSTER HOUSING
FIREBLOCK
FIREWALL
PARTYWALL
10 hectares
50 sqm
150 sqm
100 sqm
10 m
8m
6m
4m
4.00 m
400 m
15.00 m
10.00 m
1.20 m
1.30 m
12.50 m
8.50 m
1.20 m
.80 m
10.00 m
6.00 m - 6.50 m
1.20 m
.80 m
10.00 m
6.00 m
.80 m
1.20 m
8.00 m
6.00 m
.40 m
.60 m
8.00 m
6.00 m
.40 m
.60 m
6.50 m
4.50 m
.40 m
.60 m
40 sqm
31 sqm
1 slot / unit
100 m
50 sqm/10 units
optional
1 elevator
2 elevators
100 sqm
ACCESSIBILITY
REACHEABILITY
USABILITY
ORIENTATION
SAFETY
WORKABILITY
ACCESSIBLE
ALCOVE
CURB CUT OUT
GRADIENT OF
RAM
SIDEWALK
THRESHOLD
WALKWAY
1.20 m
1.50 m
3.00 m
1.20 m
3.00 m
1.00 m
.80 m
1.70 m x 1.80 m
1.10 m x 1.40 m
.80 m
.90 m - 1.20 m
1:12
6.00 m
1.50 m
1.80 m
.70 and .90
.30 m
50 mm
3.70 m
2.5 mm
1 for 2,000 sqm
0.85 m
1.50 m x 1.50 m
1.10 m
.80 m
5 seats
4 seats
6 seats
2 seats
2 seats
4 seats
6 seats
BUILDING PERMIT
CONSTRUCTION
ADDITON
ERECTION
ALTERATION
RENOVATION
CONVERSION
REPAIR
MOVING
DEMOLITION
ANCILLARY BUILDING