Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

A1 (594*841 P)

FUNDO SAN MARTIN - MODULO 07 - 2DA ETAPA

M7- 7A
UVA: 3.40m (2lat)
AREA: 0,46ha
LAT: 82

DESFOGUE
DE MATRIZ-
75mm
TURNOS DE RIEGO

PV
23 63
C
m /5
62 m
PVC 63/5

72 m PVC 75/7.5
M7- 7

PVC 63/5
UVA: 3.40m (2lat)

44 m
AREA: 0,41ha
2 Sal LAT: 78
UR 01
cota: 515.0m/ECO
CAUDAL: 20,24m³/h
P. REG: 17,00m

DOR
46 m

58 m PVC 75/7.5
1/1 PVC 63/5 OPERACION: 3

E
BERMAD S100 2"+A

v=1,67m/s
COM
25

3
57 m PVC 75/7.5
23 v=1,67m/s
M7- 8 M7- 9
UVA: 3.40m (2lat)
24 UVA: 3.40m (2lat)
AREA: 1,62ha AREA: 1,43ha
LAT: 128 LAT: 157
CAUDAL: 38,08m³/h CAUDAL: 33,60m³/h
P. REG: 13,00m P. REG: 10,00m
OPERACION: 3 OPERACION: 3
BERMAD S100 2"L BERMAD S100 2"L+A

153 m PVC 75/7.5


v=1,67m/s
104 m 104 m
PVC 75/5 PVC 75/5

PV
2 2 75
C
m /5
PVC 90/5
75 m

PVC 90/5
DESFOGUE

38 m
DE MATRIZ-
IN PIG 75MM 160mm

2
26 27 2 Sal
VALV. DE 114 m Biax 250/6 150 m Biax 160/6.3 2/1 UR 02
3/1 cota: 538.0m/ECO
ALIVIO 3" v=0,91m/s v=1,01m/s
21 P>

22 2/2
M7- 1 M7- 10 2 Sal M7- 11

1
UVA: 3.40m (2lat) UVA: 3.40m (2lat) UR 03 3/2
cota: 521.0m/ECO UVA: 3.40m (2lat) 28
AREA: 1,86ha AREA: 1,79ha AREA: 1,19ha

PVC 90/5
LAT: 206

41 m
LAT: 166 LAT: 156
20

PVC 90/5
CAUDAL: 43,71m³/h CAUDAL: 43,29m³/h CAUDAL: 27,94m³/h

75 m
P. REG: 11,00m 5/1 P. REG: 19,00m P. REG: 10,00m
OPERACION: 3 OPERACION: 3 OPERACION: 3
BERMAD S100 3"+A BERMAD S100 3" BERMAD S100 2"L+A m 5
60 75/

5
110/
PVC 0 m PV
C
3

/6
77 m 58 m 90 m 26 m 84 m
v=1 iax 250
/s
PVC 75/5 PVC 90/5 PVC 75/5 PVC 90/5 PVC 75/5
,35m

5/5
PV 3 m
/5
PV 40 m
75

C7
B

3
C

71 m

19
/s /6
5m 250
1,3 x
v= Bia
m
68

M7- 2 M7- 12 - 2 M7- 12 - 1


UVA: 3.40m (2lat) 18 UVA: 3.40m (2lat) UVA: 3.40m (2lat)
AREA: 2,62ha AREA: 1,37ha AREA: 1,32ha
6
48 m Biax 250/

LAT: 234 LAT: 118 LAT: 108


v=1,35m/s

CAUDAL: 61,35m³/h CAUDAL: 32,85m³/h CAUDAL: 30,55m³/h


P. REG: 10,00m P. REG: 13,00m P. REG: 14,00m
OPERACION: 1 OPERACION: 2 OPERACION: 2
BERMAD S100 3"L+A BERMAD S100 2"L BERMAD S100 2"L+A
CUADRO DE PRESIONES Y CAUDALES - MÓDULO 7
5/2
Operación P. Requerida hf Filtro Presión de regulación Q. Total
111 m 48 m 34 m 17 91 m 92 m (#) (m.c.a.) (m.c.a.) a campo (m.c.a.) (m³/hr)
/5

PVC 75/5 PVC 90/5 PVC 110/5 PVC 75/5 PVC 75/5
PVC 75
26 m

1 59.25 10.00 49.25 320.05


87.20 77.20
PVC 90/5

2 10.00 226.78
75 m

PVC 90/5
,35m 0/6

79 m

3 93.33 10.00 83.33 206.10


v=1 iax 25
/s
B

04 05
59 m

IN PIG 250MM
4/2
06
60 m Biax 315/10 183 m Biax 315/8 140 m Biax 250/6 88 m Biax 200/6.3 4/1
AREA PARA COMERDOR

v=1,10m/s v=1,10m/s v=1,48m/s v=1,65m/s

03 M7- 3 M7- 13 - 2 4/3 M7- 13 - 1 6 Sal


2
R-

UVA: 3.40m (2lat) IN PIG 250MM UVA: 3.40m (2lat) UR 04


UVA: 3.40m (2lat) cota:
DO

A = 0.34Ha

78 m Biax 200/6.3

525.0m
ME

0/6

AREA: 2,72ha AREA: 1,58ha AREA: 1,18ha


CO

v=1,32m/s

LAT: 128 LAT: 94


78 m Biax 25
/s /10

LAT: 223
v=1,34m/s
HH

PVC 90/5

CAUDAL: 36,95m³/h
SS

CAUDAL: 27,73m³/h
0m 15

CAUDAL: 63,44m³/h
75 m
E
GU
1,1 x 3

SA
DE

P. REG: 15,00m
ZA

P. REG: 12,00m
PO

P. REG: 10,00m 23 m
v= Bia

OPERACION: 1 OPERACION: 2 OPERACION: 2 PVC 75/5


BERMAD S100 2"L
3m

BERMAD S100 3"L BERMAD S100 2"L+A


07
PVC 75/5

11
10

36 m

6 Sal 4/4
5/3 UR 05
cota: 506.0m
102 m 45 m 34 m 102 m 63 m 13 m
PVC 75/5 PVC 90/5 PVC 110/5 PVC 75/5 PVC 63/5 PVC 75/5
PVC 63/5
- ACABADO A CARGO DE RESPONSABLE CIVIL
30% APROX., Y DEBERÁ CONTAR CON PISO ADECUADO PARA SU TRANSITO
- DE USAR ESTOCA O MONTACARGA, AREA PARA OPERACION DISMINUYE EN UN
- ESTIMADO PARA APROX. 50 PALETS Y BASE DE DE GRAVA
NOTAS :

OUT PIG 200MM


ALMACEN DE FERTILIZANTES
AREA REFERENCIAL =300m2 aprox.

24 m

02 IN PIG 160MM
3
m
0
(Volumen minimo = 110% vol. tanques)
62 m Biax 315/10

SOBRE LOSA
TANQUE
ACIDO

CONTENCION
2,500L

.0
5,500L
PISCINA DE
SOBRE LOSA
TANQUE
ACIDO

2,500L

03 00
(Volumen minimo = 110% vol. tanque)
PISCINA DE CONTENCION
SOBRE LOSA
PEROXIDO

R- 0,0
TANQUE

3,000L
2,500L
+15cm
SOBRELOSA A CARGO

Y DISEÑO
SOBRELOSA
(CALCULO CIVIL)

CIVIL)

DE
OPTIMO
RESP.

(CALCULO

SOBRELOSA +15cm
A CARGO
RESP.
+15cm
Y DISEÑO

SOBRELOSA +15cm (CALCULO Y DISEÑO OPTIMO


DE

(CALCULO Y DISEÑO OPTIMO A CARGO DE


OPTIMO A CARGO DE RESP. CIVIL)
RESP. CIVIL)
v=1,10m/s

SOBRE LOSA SOBRE LOSA SOBRE LOSA SOBRE LOSA

TANQUE 10,000 L TANQUE 10,000 L TANQUE 10,000 L TANQUE 10,000 L

1 m
O .0
SOBRE LOSA SOBRE LOSA SOBRE LOSA SOBRE LOSA

TANQUE 10,000 L TANQUE 10,000 L


TANQUE 10,000 L TANQUE 10,000 L

RI t= 5
SOBRE LOSA SOBRE LOSA SOBRE LOSA SOBRE LOSA

TANQUE 10,000 L TANQUE 10,000 L TANQUE 10,000 L TANQUE 10,000 L

O
RV
OPTIMO A CARGO DE

OPTIMO A CARGO DE

OPTIMO A CARGO DE
(CALCULO Y DISEÑO

(CALCULO Y DISEÑO

(CALCULO Y DISEÑO
RESP. CIVIL)

RESP. CIVIL)

RESP. CIVIL)
SOBRELOSA +15cm

SOBRELOSA +15cm

SOBRELOSA +15cm

H
E
125 m Biax 200/6.3

S
160/6.3

RE
CORTINAS
ACCESORIOS DE AUTOMATIZACION
CONTROL/MEDICION, P/UBICACION DE
APROX. 0.30M ALREDEDOR DE VALVULAS

MOD.05

IN PIG 110MM
ACCESORIOS DE AUTOMATIZACION
CONTROL/MEDICION, P/UBICACION DE
APROX. 0.30M ALREDEDOR DE VALVULAS

MOD.08
ACCESORIOS DE AUTOMATIZACION
CONTROL/MEDICION, P/UBICACION DE
APROX. 0.30M ALREDEDOR DE VALVULAS

MOD.09

2 Sal
v=1,44m/s

CORTINAS
ACCESORIOS DE AUTOMATIZACION
CONTROL/MEDICION, P/UBICACION DE
APROX. 0.30M ALREDEDOR DE VALVULAS
v=1,60m/s

MOD.07
ACCESORIOS DE AUTOMATIZACION
CONTROL/MEDICION, P/UBICACION DE
APROX. 0.30M ALREDEDOR DE VALVULAS

UR 07
A FUTURO
ACCESORIOS DE AUTOMATIZACION
CONTROL/MEDICION, P/UBICACION DE
APROX. 0.30M ALREDEDOR DE VALVULAS

01
A FUTURO
129 m Biax

GABINETE DE CONTROL CUARTO ELECTRICO

cota: 475.0m CONTROLADOR

M7- 4 M7- 14
UVA: 3.40m (2lat) UVA: 3.40m (2lat)
AREA: 2,63ha AREA: 2,29ha
LAT: 222 LAT: 212
12 CAUDAL: 53.82m³/h 08
CAUDAL: 59,81m³/h 5/4
P. REG: 13,00m P. REG: 13,00m 4/5
OPERACION: 1 OPERACION: 2
10/5

BERMAD S100 3"L+A


PVC 110/5

BERMAD S100 3"L+A


37 m

33 m
PVC 1

M7- 17
72 m
CULTIVO: 0.50m 49 m M7- 16 68 m 92 m 44 m 40 m 82 m 38 m 55 m
PVC 63/5 PVC 90/5 PVC 75/5 PVC 75/5 PVC 90/5 PVC 110/5 PVC 75/5 PVC 90/5 PVC 110/5
AREA: 1.13ha CULTIVO: 0.50m
/5
PV 39 m

LAT: 106 AREA: 1.31ha


63

LAT: 140
C

CAUDAL: 26.71m³/h
P. REG: 14.00m CAUDAL: 30.74m³/h
P. REG: 23.00m 09
/s .3

OPERACION: 1
m /6

BERMAD S100 2"L OPERACION: 1


75 160

BERMAD S100 3"+A 13


v= Biax
0,
m
53

14 M7- 15
M7- 5
v=1,3 x 160/8

UVA: 3.40m (2lat) UVA: 3.40m (2lat)


10
4m/s

AREA: 2,11ha AREA: 2,08ha 6/1 2 Sal ESQUEMA DE OPERACION - MÓDULO 7


UR 06
Bia

LAT: 176 LAT: 210 cota: 526.0m/ECO

CAUDAL: 43,24m³/h CAUDAL: 47,03m³/h Operación Area Neta Tasa Irrig. Tiempo R. Q. Total
198 m

P. REG: 10,00m P. REG: 14,00m (#) (Has) (mm/hr) (Hrs) (m³/hr)


OPERACION: 1 OPERACION: 2
320.05
/5

1 13.64 2.35 3.20


PV 40 m

BERMAD S100 3"L BERMAD S100 3"L+A


90
C

DESFOGUE 2 9.65 2.35 3.20 226.78


15 DE MATRIZ-
160mm
101 m 17 m 158 m 3 8.77 2.35 3.20 206.10
PVC 75/5 PVC 90/5 PVC 75/5
5/5 TOTAL 32.06 9.60
60/6.3
113 m 0,54m/s
Biax 1

DATOS DE IRRIGACIÓN LEYENDA


v=

CLASE 6.3 CLASE 8 CLASE 10


Descripción Unidades Instalado
TUBERIA BIAX 315
Cultivo Uva TUBERIA BIAX 250
Area de Irrigation (Neta) Has 32.06 TUBERIA BIAX 200
M7- 6
UVA: 3.40m (2lat) Líneas / Espacio entre camas mts 3.40 TUBERIA BIAX 160
AREA: 1,51ha Espacio entre plantas mts - TUBERIA BIAX 110
LAT: 156 16 CLASE 5 CLASE 7.5 CLASE 10

CAUDAL: 34,31m³/h Sistema de Irrigación Goteo TUBERIA PVC 140


PVC 110/5

5/6
P. REG: 10,00m
27 m

OPERACION: 1 Tipo de Emisor DRIPNET PC 16250 TUBERIA PVC 90


BERMAD S100 2"L+A Emisor - Presión mínima mts 8.00 TUBERIA PVC 75
m 5 DESFOGUE
29 90/ DE MATRIZ- TUBERIA PVC 63
PV C 160mm Descarga del emisor lph 1.60
TUBERIA PVC 1½"
94 m Espaciamiento entre emisores mts 0.40
PVC 75/5 TUBERIA PVC 1"
Espaciamiento entre laterales mts 1.70
SPRAYLINES
N° laterales por cama o hilera 2.00 PERIMETRO
Tasa de Irrigación mm/h 2.35 DIRECCION DE FLUJO
Máx. consumo diario mm/día 7.53 ESTACION DE BOMBEO B

Ciclo de Irrigación días 1.00 CABEZAL DE FILTRADO


CAMINO 8m, EL CLIENTE
VAL. HIDRAULICA 3"L
SE HA COMPROMETIDO Duración de la operación Hrs 3.20
DEJAR. VAL. HIDRAULICA 3"
Número de operaciones 3.00
VAL. HIDRAULICA 2"L
Máxima duración del riego al día Hrs 9.60 VAL. HIDRAULICA 2"
Máxima duración disponible Hrs 10.00 VALVULA DE AIRE 2"
VALVULA ALIVIO
P>

Máxima descarga requerida m³/hr 320.05


Máxima descarga disponible m³/hr 320.05 LINE FLUSHING
VALVULA DNL 0.2BAR
Presión requerida en la fuente agua mca 93.33
LEYENDA DE AUTOMATIZACIÓN
Variación de Caudal * % 0.00 4 Sal
UR 01 UNIDAD REMOTA
* Se considera variación de caudal solo en mangueras no compensadas.

1 03/10/23 ACTUALIZACION DE ÁREAS MFA Este documento ha sido preparado de conformidad con las CLIENTE:
prácticas de ingeniería generalmente aceptados. Se basa en
0 24/08/23 AJUSTE DE AREAS ZONAS NIVELADAS MFA los datos, que se presentó a Netafim por el cliente, la AGRICOLA LOS ANDENES
precisión y / o veracidad de los cuales no fueron verificados
por Netafim, y para los que no se hace responsable Netafim.
0 21/08/23 CAMBIO DE PERIMETRO // Este documento es propiedad exclusiva de Netafim y sólo GROW MORE WITH LESS PROYECTO:
puede ser utilizado en combinación con productos que
0 07/08/23 REUBICACIÓN DE RESERVORIO Y ACTUALIZACION DE LOTES // pueden comprar de Netafim. Este documento deberá ser "RIEGO POR GOTEO EN UVA - MÓDULO 07"
devuelto a Netafim por el cliente inmediatamente después de
0 26/07/23 ALINEAMIENTO DE SURCOS // la solicitud de Netafim. NOMBRE DEL ARCHIVO: DEPARTAMENTO: LOCALIZACION:

0 06/07/23 EMITIDO PARA REVISION // All rights reserved to Netafim www.netafim.com PE-2748-REV1-M7-V1-H-031023.DWG ICA PISCO

VERSION FECHA DESCRIPCION DE REVISION: REVISADO DISEÑO: DIBUJO: T. PAPEL: ESCALA: PAGINA: PROY. N°: AREA: CULTIVO: FECHA: VERSION:
VRP LMR A1 1/2000 1/1 2748 32.06 Ha UVA 03/10/23 1

You might also like