Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

Creating a Change Master

Creating a Change Master

Explanation Screenshot

To learn more about


how a BOM engineer
creates a change
master, follow this
interactive tutorial.

1. To open the app,


select the Create
Change Master tile.

The function has


been selected for
you.

1
Creating a Change Master

Explanation Screenshot

2. In the Change
Number field, enter
CN001 and press
Enter.

3. In the field next to


the change number,
enter Change
Master for BOM
FG126 and choose
the Valid From field.

4. In the Valid From


field, open the date
picker.

2
Creating a Change Master

Explanation Screenshot

5. For this tutorial,


select January 6,
2021.

6. In the Change no.


status field, enter 01
and press Enter.

In the Bill of Material


row, select Actv.,
Object and MgtRec.

For this tutorial, these


have been selected
for you.

3
Creating a Change Master

Explanation Screenshot

7. Choose Save.

A message displays
confirming the
change number has
been created.

8. To return to the
launchpad, choose
SAP.

4
Creating a Change Master

Explanation Screenshot

You have
successfully created
a change master.

This concludes the


interactive tutorial.

You might also like