Changing a BOM Using a Change Master

Changing a BOM Using a Change Master

Explanation Screenshot

To learn more about


how a BOM engineer
changes a BOM
using a change
master, follow this
interactive tutorial.

1. To open the app,


select the Maintain
Bill of Material -
Create, change &
discard BOMs tile.

2. In the Material
field, enter FG126
and open the BOM
Usage list.

1
Changing a BOM Using a Change Master

Explanation Screenshot

3. Select
Engineering/Design.

4. Choose Go.

5. Select the BOM.

2
Changing a BOM Using a Change Master

Explanation Screenshot

6. Choose Display
Timeline.

7. If the Status is
inactive, change the
selected date to a
new date on the
Maintain Bill of
Material screen.

For this tutorial,


choose Select.

8. Choose OK.

3
Changing a BOM Using a Change Master

Explanation Screenshot

9. Choose Edit.

10. Choose Assign


Change Number.

11. In the Assign


Change Number
window, choose
Create.

4
Changing a BOM Using a Change Master

Explanation Screenshot

12. In the Create


field, enter CN002
and press Enter.

13. Open the date


picker and select the
date.

14. Select a start


date of today plus
one week.

For this tutorial,


select January 13,
2021.

5
Changing a BOM Using a Change Master

Explanation Screenshot

15. In the
Description field,
enter Change
number for changes
to FG126 BOM and
press Enter.

16. Choose OK.

17. Choose Add.

6
Changing a BOM Using a Change Master

Explanation Screenshot

In the BOM Item


Number 0110,
L(Stock item) is
already selected as
the Item Category.

18. In the Component


field, enter RM27 and
select the
Component Quantity
field.

19. In the Component


field, enter 1 and
choose Save.

7
Changing a BOM Using a Change Master

Explanation Screenshot

Note the date in the


Valid From column
and the assigned
Change Number for
the component
RM27.

20. Choose Display


Timeline.

21. To see the


timeline for change
number CN002,
choose Change
History.

8
Changing a BOM Using a Change Master

Explanation Screenshot

Here you can check


the corresponding
component
configuration of the
BOM.

22. Choose OK.

23. To return to the


launchpad, choose
SAP.

9
Changing a BOM Using a Change Master

Explanation Screenshot

You have
successfully changed
a BOM using a
change master.

This concludes the


interactive tutorial.