2 - BW-Z Maintenance+Service
2 - BW-Z Maintenance+Service
90°
60°
Bucket elevator
40°
30°
0°
Guide Frame
U Frame
Assembly casing
Feed Point
Boot
Drive shaft
Slow drive
Hub
Gear box
Drive bearings
Main motor
Fluid coupling
Double drive for AUMUND- Bucket elevator BW-Z / BW-ZL with inching drive
Double drive for AUMUND- Bucket elevator BW-D with inching drive
1- Drive shaft
2- Segment / Drive ring
3- Hub
4- Screw
5- Loose bearing
6- Fix bearing
8- Sealing
10- Screw
11-14 Segment’s screw
15-17- Lager screw
18-19- Position screw
Elevator boot
Guide beams
Guide frame
AU 04.2
Sealing
Pin
Inner link
Outer link
Bush
Since 1996
AUMUND PREVENTIVE MAINTENANCE TRAINING BW-Z : 20
WE CONVEY QUALITY
Reduced vibration
(polygon effect)
No cracks in welding
seem and bucket
fixation
Self-locking
screws
AU 04 / AU 06 / AU 13 / AU 15
AUMUND standard
„ 1.Bucket with or without Das Bild k ann zurzeit nicht angezeigt werden.
reinforced lip
„ 2. Angular bracket Reinforced lip
Maintenance
The inspections and checks to be carried out are subdivided in the following plan according to
operating hours and maintenance intervals
Legend:
X Daily
X Weekly
X Monthly
X Yearly
2 Every 2 weeks
3 or 6 Every 3 months (quarterly)
every 6 months (half yearly)
2 Every 2 years
Start With each commissioning
Team Before beginning of each shift
Need As required
More
Monthly
Number
Weekly
informati
Yearly
Daily
Operating
Sub-assembly
hours
Cat * on Work to be done
chapter
Drive elements (e.g. The drive elements contained in the bucket elevator and the documentation belonging to it, are listed in chapter 8.
* motor, gear unit, The necessary maintenance work may be learn from the manufacturer's documentation and must be carried out in
coupling, brake the time intervals indicated there.
Check fixture
* Torque support 3 S Check for damage
Check for :
-function
Tensioning device 3 B -damages, wear
-tight fit of screws
Monthly
Weekly
More
Yearly
Daily
Operating Cat
Sub-assembly information Work to be done
hours *
chapter
Check for : -
damages -
X B completeness of bolted
connections ( visual check)
All Buckets
Check for material backings
X Remove material backings
B = Work can (or must) be done during operation S = work must be done during machine stop
Wear measurement
1 – Visual check
2 – By measuring
1 – Visual check
- seeing
- feeling
- touching
- hearing
Wear examples
Tail ring
Drive ring
Wear mark
Wear mark
The wheel segments have to be renewed as soon as the wear marks are achieved
Wear limit
The wheel segments have to be replaced as soon as the wear marks are achieved
We recommend to replaced the wheel segments when exchanging the chain
See also Operation Manual § 5.10
AUMUND PREVENTIVE MAINTENANCE TRAINING BW-Z : 38
WE CONVEY QUALITY
Highly wear!
Bushing Cracks
The chain must be exchanged if the bushings are presenting cracks or pittings
Pitting
The chain must be exchanged if the bushings are presenting cracks or pittings
„ Measurement of one
double link
• Friction bearings
The friction bearings must be replaced, if
the gap between bushing and pillow block
exceeds 10 mm (≈3/8 inch)
• Friction bearings
The friction bearings must be replaced, if the gap between bushing and pillow block
exceeds 10 mm (3/8 inch)
• Angular brackets
The angular brackets must be replaced if the gap between bracket and bolt reach 10 mm
Min. 150 mm
The gap between buckets and bucket elevator boot should not be less than 150 mm
Boot Level
Control
Monitoring of
take-up length
Parts replacement
BEFORE CARRYING OUT ANY REPAIR OR MAINTENANCE WORK,
ALWAYS STOP AND SWITCH OFF THE CONVEYOR AND PROTECT
AGAINST ANY ACCIDENTELY UNAUTHORISIZED RESTARTING!!!!
- Drive ring
- Tail ring
- Chain
- Angular brackets