Summery of BOQ

PROJECT : Cobblestone
Location: Berooda town
client beroda Addministration Office
Contractor:- Kadir,mohammed fi sh

No It Description Unit QTY Rate Total Amount


1. EARTH WORK
1.2Establishment of vertical alignment
1.2.1 Excavation to level and compaction
soft Material (Cut-fill) M3 200 100.32 20064
1.3 Construction of Embankment
Borrow Material Production,Loading Unloading,Transporting, Spreading and Com3 210 206.252 43312.92
Total Carried to Summary 85,663.92
2.MASONRY WORKS
2.150cm thick Masonry work along sides of the road m3 45 3429.68 154335.6
2.2Pointing stone masonry wall at one side m2 120 170.25 20,430.00
Total Carried to Summary 174,765.60
SubTotal 260,429.52
15%Vat 0.15 39,064.43
Grand Total With Vat 15% 299,493.95
timising dimension Description

1, Masonry work along sides wich need to support by short retain cobble stone slope
60 L=60m ,W=0.5m ,D=1.5m
0.5
1.5
45 m3
2, BACK FILLING around masonry wall
60 L=60m ,W=1m ,D=2.5m
2.5
1 150 m3
3 ,Borrow Material Production,Loading Unloading,Transporting, Spreading and Compacting Using Dumptruck, Tractor, Animal Cart, Labour and loaded from a dis.of (0.4,5)km
100 L=100m ,W=7m ,D=0.3m
7
0.3
210 m3

4.Excavation to level and compaction


100 L=100M,W=2M&D=1M
2
1 200 m3
5. Pointing stone masonry wall at one side
60 L=60m d=2.5m
2 120 m2