PROJECT : Cobblestone
Location: Berooda town
client beroda Addministration Office
Contractor:- Kadir,mohammed fi sh
1, Masonry work along sides wich need to support by short retain cobble stone slope
60 L=60m ,W=0.5m ,D=1.5m
0.5
1.5
45 m3
2, BACK FILLING around masonry wall
60 L=60m ,W=1m ,D=2.5m
2.5
1 150 m3
3 ,Borrow Material Production,Loading Unloading,Transporting, Spreading and Compacting Using Dumptruck, Tractor, Animal Cart, Labour and loaded from a dis.of (0.4,5)km
100 L=100m ,W=7m ,D=0.3m
7
0.3
210 m3