12

CH 3750
CH 3620
PT 01
PT 01
GL 01 MT 02 CEILING IN
20MM X 20MM PAINT FINISH
SHADOW LINE
25MM X 25 MM IN
POWDER COAT FINISH FCL
FCL
3600 MM
TF 01 3600 MM CH 3620
MT 01 MT 02 4
PT 01 AIR GRILLE
25MM X 25 MM IN (VERIFY
POWDER COAT FINISH 20MM X 20MM MECHANICAL)
CH 2800 SHADOW LINE
BH 09
PT 01 FCL 10
BH 07 3600 MM
2 CEILING IN
DT-1.10 BH 11 PAINT FINISH
6MM THK. STAINLESS
ASYA ID
CH 3600 CH 3600
GL 01 STEEL TRIM IN 17TH FLR A PLACE BUILDING, CORAL WAY MALL
HAIRLINE FINISH PT 01 PT 01 OF ASIA COMPLEX, CBP-1A PASAY CITY 1300,
FACIAL MIRROR
1 FACIAL MIRROR DETAIL MT 02 CEILING IN PHILIPPINES
PAINT FINISH CEILING IN
PAINT FINISH
REVISION DATE
LED STRIP LIGHT
(VERIFY LIGHTING
CONSULTANT) GL 01
12MM THK. TF 01 4
FACIAL MIRROR
SUBSTRATE
WALL IN TILE FINISH
12MM THK.
SUBSTRATE
OPEN
LED STRIP LIGHT
(VERIFY LIGHTING
CONSULTANT)

GL 01
FACIAL MIRROR GL 01

12MM THK. FACIAL MIRROR


SUBSTRATE 12MM THK. LP 01
SUBSTRATE
CUBICLE PARTITION
13 IN LAMINATE FINISH
LED STRIP LIGHT
(VERIFY LIGHTING
CONSULTANT) 2
GL 01
ST 01
FACIAL MIRROR FULL BODY MIRROR
SOLID SURFACE
COUNTER TOP
BH 02
LED STRIP LIGHT
(VERIFY LIGHTING BH 07
CONSULTANT) WATER CLOSET
UNDER COUNTER
PROJECT TITLE
MT 02 6MM THK. STAINLESS BASIN
STEEL TRIM IN TF 02
METAIL IN POWDER HAIRLINE FINISH FFL
COAT FINISH 0000 MM GLAS - A FLOOR
SUBWALL IN
GL 01 TILE FINISH
3 9 CO-WORKING
FACIAL MIRROR TF 02
MT 02 FLOOR
IN TILE FINISH PROJECT NUMBER
MT 02 FFL
0000 MM
OPEN 25MM X 25 MM IN FFL
POWDER COAT FINISH TF 01 0000 MM

BH 09
DRAWING TITLE
FAUCET
4 SPOT DETAIL 6 SPOT DETAIL 8 S E C T I O N 11 CUBICLE PARTITION DETAIL
TOILET DETAILS

ST 01
SOLID SURFACE DRAWN BY CHECKED BY
COUNTER TOP
12MM THK.
SUBSTRATE S/S U-CHANEL AGR
IN HAIRLINE FINISH

CH 3620 DRAWING NUMBER


GL 01 PT 01 7
BH 07
FACIAL MIRROR 20MM X 20MM SHADOW ID-10.40
UNDER COUNTER LINE IN PAINT FINISH
BASIN
CH 3600 BH 09 ISSUED FOR

PT 01 FAUCET
MT 01
2MM ARIS
CEILING IN
FFL PAINT FINISH EDGE
0000 MM
LP 02 SCALE REVISION
3MM ARIS
CUBICLE TRANSOM
EDGE
IN LAMINATE FINISH AS SHOWN
2 E L E V A T I O N 9 SPOT DETAIL
SEALANT
DATE
AIR GRILLE
CH 3750 (VERIFY MECHANICAL) 12 TRANSOM-CEILING CONNECTION 08/18/2022
GL 01 PT 01 ST 01
00
FACIAL MIRROR RECESSED CEILING SOLID SURFACE
IN PAINT FINISH COUNTER TOP
2MM ARIS EDGE
BH 07
MT 02 CH 3770
UNDER COUNTER
25MM X 25 MM IN PT 01 BASIN
POWDER COAT FINISH OPEN ST 01
3MM ARIS EDGE
20MM X 20MM SOLID SURFACE
SHADOW LINE COUNTER TOP
ADHESSIVE
ADHESSIVE 5

12MM THK. 12MM THK.


TF 01 SUBSTRATE
SUBSTRATE
WALL IN TILE FINISH

BH 07 LED STRIP LIGHT IN


CH 3600
UNDER COUNTER CONCEALED
PT 01 WASH BASIN ACRYLIC DIFFUSER
(VERIFY LIGHTING
CEILING IN CONSULTANT)
PAINT FINISH

3 SPOT DETAIL 10 SPOT DETAIL 7 SPOT DETAIL 5 SPOT DETAIL 13 COUNTER TOP DETAIL