High Risk Activity Scoring

Lifting and Rigging Rev 0

Assessor Details:
Name:
Company:
Department:
Date of Assessment:
Time of Assessment:
Area of Assessment:
Supervisor of the group
being assessed:
Company of group being
assessed:

Scoring: No evidence of implementation: 0; Little evidence of implementation: 1; Fairly well


implemented: 2; Fully implemented: 3

Element: Score: Comments:


1. Riggers are trained and certified.

2. Riggers have been authorized as


competent persons.
3. Approved and correct rigging practices are
being used.
4. Rigging equipment is: in good condition
with no apparent signs of excess damage
and wear.
5. Rigging equipment is inspected and colour
coded.
6. Rigging gear is entered into the lifting gear
register and inspections are documented.
7. Lifting gear being used is rated for the lift
being performed.
8. Crane and lifting gear hooks are equipped
with safety latches.
9. The gaps on hook throats are regularly
measured to detect changes in the hook
gaps.
10. When lifting two tag lines of adequate
length, are used to control the load.
11. The area is barricaded and access
controlled by a watchmen.
12. An assessment is made of access &
working platforms required for riggers to:
unhook or adjust the positioning of the
load, especially during spool placement.
High Risk Activity Scoring
Lifting and Rigging Rev 0
13. All lifting & rigging crew to attend & sign
off on the TSTI for each lift, inclusive:
responsibilities & lines of communication.
14. Signals to crane operator to be by
predetermined personnel only.
15. Correct securement by body harness to
substantial anchor points at height to be
followed.
Total Score: /45

Additional Comments: