PRE-APPROVAL OF IQ Limited
Laundry Dryer Sreepur, Gazipur, Bangladesh
Document No. Version Effective Date Page No.
IQ-PRE/GE/HR&A/HGEHR&A-002/2024/00 00 Page 1 of 2
Protocol Approval
Prepared by:
Reviewed by:
Manager, Security & General
Maj Tarun Talukder (Retd)
Services
Md. Ziaul Alam Manager, Production
Approved by:
Asst. Manager,
M. Adnan Rashel
Quality Assurance
Authorized by:
2. The following tests/content were not included in the supplier provided protocol and have
been added as additional testing/content.
Sl. No Additional Test
3. All blank phases of protocol will be filled up during qualification work and attached with
report as attachment.
4. Comments:
5. List of Attachments
Sl. Document Name Pages
1. IQ Protocol 13