DZPS SW20 and Tailings Clash

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Plotted by: DONOVAN, CRAIG, 5/12/2022 2:06 PM

A B C D E F

PROPOSED: new deposition PROPOSED: reroute


location, corner of impoundment. existing lines around
INTERSTATE 80
Allows demo of existing lines and DZPS SW20
reduces flow filling under 3 existing line from WCS spillover and full flow bypass,
embankment and crest area cannot be removed until VS, DZPS & TDPS SW21 are
operational. These facilities currently lie overtop the 63" 7595 Technology Way, Suite 200
NORTH IMPOUNDMENT Denver, CO 80237
east SPD corridor. This cannot be removed until SPD PS
Tel. 1-303-740-2600
is operational. AECOM.COM
1 1
Also of note, finger drains and crest are located over
extent of the existing routing
SOUTH IMPOUNDMENT

3 lines proposed HIGHWAY 201


reroute for PH2 IFC KEYMAP
1" = 9000'

PROPOSED: relocate DZPS SW20


to east or west

2 2
RIO TINTO
KENNECOTT

2022 PHASE 2 IFC


PACKAGE
NORTH IMPOUNDMENT
COMPLETION (NIC)
FACILITIES PHASE 2
CONSTRUCTION PACKAGE
MAGNA, UTAH
1

3 3

ISSUED FOR BIDDING 12/04/2020 KEA


DATE BY
Layout:44231-56-201

07/15/2022 MJV
ISSUED FOR CONSTRUCTION
DATE BY

REVISIONS
NO. DESCRIPTION DATE
44231-56-201.dwg

0 ISSUED FOR BID 12/04/2020

4 4
- File:

1 ISSUED FOR CONSTRUCTION 07/15/2022


Data Source - 60593437-NIC_4500FS - 60593437-nic_4500PS (PROJECT WISE)

AECOM PROJECT NO: 60680619


DRAWN BY: -
DESIGNED BY: -
CHECKED BY: -
DATE SAVED: 2022-05-11
PLOT DATE: 2022-05-12
ACAD VER: AUTOCAD / CIVIL 3D 2019

SHEET TITLE

FLUSH PIPELINE TDPS


5 5
SW21 TO DZPS SW20
PLAN & PROFILE
SHEET 2 OF 2
1 2022 PHASE 2 IFC PACKAGE

44231-56-201
ISSUED FOR CONSTRUCTION