Class 7-Budgeting and Cost Estimation

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 24

Industry Verticals for Project

Law Firm
Capital goods Manufacturing Company: Air Compressor, Heat Exchangers, Generator etc.
HR Firm
Ecommerce Organisation
Distribution Company
Pharma Company
IT enabled Service company
Engineering Construction Company
Architect

1
Budgeting and Cost
Estimation

2
Budget and Cost Estimation

3
Estimating Project Budgets

4
Case Study- Path Finder Mission
1976: NASA’s two Viking Mars-lander missions took 6 years and $3 billion to develop
21 year later…. 4th July 1997:Mars Pathfinder and Sojourner Rover landed on Mars at a
development cost of $175 Million
94 percent cost reduction over the earlier mission.

HOW?

5
Case Study- Path Finder Mission
The means of limiting the cost of the mission were multiple and creative:
• Development was cost-capped, with no opportunity for more funds.
• identifying a set of “de-scope” options, which could be implemented in case the cost grew
beyond the fixed budget
• mission, flight, and ground systems designs were driven by existing hardware and system
capability
• a project cash reserve of 27 percent of the total budget was held back and carefully planned
for time-phased release throughout the duration of the project
• mission designers/builders transitioned into the testers/operators to save documentation,
time, labor cost, and chance of error

6
Case Study- Path Finder Mission contnd…
• Existing NASA mission infrastructure was used rather than designing new systems
• Instituting time-phased “what if” and lien lists for real or potential current and anticipated
items of cost growth during the project
• Choosing to use a “single-string” but higher risk design and offsetting the risk by using more-
reliable parts
• 70 percent of major procurements contracts were fixedprice rather than cost-plus
• creative procurement, such as existing equipment spares, and accounting, such as lower
burden rate personnel

7
Top- Down Budgeting

8
Top- Down Budgeting

9
Bottom Up Budgeting

10
Bottom Up Budgeting

11
Budgeting

12
Work Element Costing

13
Iterative Budgeting Process

14
Iterative Budgeting Process

15
Category/Activity Budgeting Vs Program
Budgeting

16
Category/Activity Budgeting Vs Program
Budgeting

17
Program Budgeting

18
Program Budgeting

19
Improving process of Cost Estimation

20
Funding Non-Profitable Projects

21
Project Bids and RFP’s
Technical Bid
Implementation Plan
Plan for Logistic support and Administration.
Past Experience

22
Learning Curves

23
Other Factors

24