Professional Documents
Culture Documents
Class 7-Budgeting and Cost Estimation
Class 7-Budgeting and Cost Estimation
Class 7-Budgeting and Cost Estimation
Law Firm
Capital goods Manufacturing Company: Air Compressor, Heat Exchangers, Generator etc.
HR Firm
Ecommerce Organisation
Distribution Company
Pharma Company
IT enabled Service company
Engineering Construction Company
Architect
1
Budgeting and Cost
Estimation
2
Budget and Cost Estimation
3
Estimating Project Budgets
4
Case Study- Path Finder Mission
1976: NASA’s two Viking Mars-lander missions took 6 years and $3 billion to develop
21 year later…. 4th July 1997:Mars Pathfinder and Sojourner Rover landed on Mars at a
development cost of $175 Million
94 percent cost reduction over the earlier mission.
HOW?
5
Case Study- Path Finder Mission
The means of limiting the cost of the mission were multiple and creative:
• Development was cost-capped, with no opportunity for more funds.
• identifying a set of “de-scope” options, which could be implemented in case the cost grew
beyond the fixed budget
• mission, flight, and ground systems designs were driven by existing hardware and system
capability
• a project cash reserve of 27 percent of the total budget was held back and carefully planned
for time-phased release throughout the duration of the project
• mission designers/builders transitioned into the testers/operators to save documentation,
time, labor cost, and chance of error
6
Case Study- Path Finder Mission contnd…
• Existing NASA mission infrastructure was used rather than designing new systems
• Instituting time-phased “what if” and lien lists for real or potential current and anticipated
items of cost growth during the project
• Choosing to use a “single-string” but higher risk design and offsetting the risk by using more-
reliable parts
• 70 percent of major procurements contracts were fixedprice rather than cost-plus
• creative procurement, such as existing equipment spares, and accounting, such as lower
burden rate personnel
7
Top- Down Budgeting
8
Top- Down Budgeting
9
Bottom Up Budgeting
10
Bottom Up Budgeting
11
Budgeting
12
Work Element Costing
13
Iterative Budgeting Process
14
Iterative Budgeting Process
15
Category/Activity Budgeting Vs Program
Budgeting
16
Category/Activity Budgeting Vs Program
Budgeting
17
Program Budgeting
18
Program Budgeting
19
Improving process of Cost Estimation
20
Funding Non-Profitable Projects
21
Project Bids and RFP’s
Technical Bid
Implementation Plan
Plan for Logistic support and Administration.
Past Experience
22
Learning Curves
23
Other Factors
24