Disc Insulator - Incomig Inspection Checklist

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Document No: EDFRI-Quality-CL01

Disc Insulator- Incoming Rev.: 00


Inspection Check List Release date: 10.04.2024

Part Name Disc Insulator


Specification / QAP/ Drawing No
Vendor Name Kintech Synergy Project Site G 12
Contact Person NIL Contact Person Mr. SANJAY
Batch No/Lot no First Lot - PSS P.O reference Number Supply contract

Offered by Mr. Afsar Inspected by Mr. Pravin


Date Date
Offered Qty 10 set Inspected Qty. 10 Set

Pre-Inspection - Delivery Documents


Delivery challan details Verified – Yes ✘ NO
Material certificate received Verified – Yes NO ✘
Packing details Verified – Yes NO ✘
Unloading details Manual Unloading Mechanical Unloading
Factory inspection done for material received Yes NO ✘
Overall condition of material received OK Not OK
Storage details Stored in corrugated box

Inspection Inspection Samples


Sr Requiremen Measuring
Parameter/Characteristic’s
No. t Method 1 2 3 4 5
as per drg.
Identification - part
1 Visual Inspection No defects Visual
Measuring
2 Sectional Length 546 mm +/-10
tape
Measuring
3 Creep age Distance 900 mm
tape
Measuring
4
Arcing distance 412 mm tape
Vernier
5 Shed Diameter 95 mm +/- 1
calliper
SPARKIL 90
6 Marking KN on metal Visual
end fitting
Measuring
7 End fitting dimensions ,
tape

Inspection Results: - Accepted Accepted with Deviation Rejected

Projects - QHSE - Suzlon-

You might also like