Specification / QAP/ Drawing No Vendor Name Kintech Synergy Project Site G 12 Contact Person NIL Contact Person Mr. SANJAY Batch No/Lot no First Lot - PSS P.O reference Number Supply contract
Offered by Mr. Afsar Inspected by Mr. Pravin
Date Date Offered Qty 10 set Inspected Qty. 10 Set
Pre-Inspection - Delivery Documents
Delivery challan details Verified – Yes ✘ NO Material certificate received Verified – Yes NO ✘ Packing details Verified – Yes NO ✘ Unloading details Manual Unloading Mechanical Unloading Factory inspection done for material received Yes NO ✘ Overall condition of material received OK Not OK Storage details Stored in corrugated box
Inspection Inspection Samples
Sr Requiremen Measuring Parameter/Characteristic’s No. t Method 1 2 3 4 5 as per drg. Identification - part 1 Visual Inspection No defects Visual Measuring 2 Sectional Length 546 mm +/-10 tape Measuring 3 Creep age Distance 900 mm tape Measuring 4 Arcing distance 412 mm tape Vernier 5 Shed Diameter 95 mm +/- 1 calliper SPARKIL 90 6 Marking KN on metal Visual end fitting Measuring 7 End fitting dimensions , tape
Inspection Results: - Accepted Accepted with Deviation Rejected