:- RA BILL - 10
NAME OF CONTRACTER:- Hussain Ali Al Mahrous General Contract Ing Company
NAME OF THE WORK:- RTR/Non Metalic Under Ground Piping Work for GCP - 04
LOA/PO NO.:- LTHSC-LOA-JGCP-23-09 Dated - 16-June-2023 / 7400053377
شركة ال أند تي هيدروكربون السعودية PERIOD OF MEASUREMENT 01-April-2024 To 30-April-2024
DATE
Measurement cum Abstract Sheet
Stage -> Jointing @ 35% Laying & Alignment @ 35% Hydrotest @10% Draining/Drying @10% QC Documentation @10%
Unit Price SOR Amount Upto Previous Bill This Bill Cumulative Bill Upto Previous Bill This Bill Cumulative Bill Upto Previous Bill This Bill Cumulative Bill Upto Previous Bill This Bill Cumulative Bill Upto Previous Bill This Bill Cumulative Bill Remarks
Sr. No Details of Services Pipe Size SOR Qty. UOM Unit Price
100% (SAR) Unit Price Unit Price Unit Price
Unit Price Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount
TOTAL (SECTION A + SECTION B) 4,118,273.63 713,193 127,575 840,769 597,010 102,430 699,440 132,990 19,335 152,325 132,990 19,335 152,325 - - -
A Non-Metallic Bonding - UG Piping - Adhesive RTR UG Piping Works 3,929,979 2,847 648,180 883 127,575 3,730 775,755 2,287 531,996 675 102,430 2,962 634,426 1,593 114,415 317 19,335 1,910 133,749 1,593 114,415 317 19,335 1,910 133,749 - - - - - -
B Non-Metallic Bonding - UG Piping - Butt & Wrap RTR UG Piping Works 188,294.39 65,013 - 65,013 65,013 - 65,013 - 18,575 - 18,575 - 18,575 - 18,575 - - - -
Butt & Wrap 6 51 NOJ 635.41 32,405.91 222 43 9,563 - - 43 9,563 222 43 9,563 - - 43 9,563 64 43 2,732 - - 43 2,732 64 43 2,732 - - 43 2,732 64 - - - -
Butt & Wrap 12 44 NOJ 1270.83 55,916.52 445 54 24,019 - - 54 24,019 445 54 24,019 - - 54 24,019 127 54 6,862 - - 54 6,862 127 54 6,862 - - 54 6,862 127 - - - -
Butt & Wrap 16 59 NOJ 1694.44 99,971.96 593 53 31,432 - - 53 31,432 593 53 31,432 - - 53 31,432 169 53 8,981 - - 53 8,981 169 53 8,981 - - 53 8,981 169 - - - -
Summary
Stage/ Payment % SOR Amount Upto Previous This Bill Cumulative
Jointing @ 35% 1,441,396 713,193.50 127,575 840,769
Hussain Ali Al Mahrous General ContractIng Company L&T Hydrocarbon Saudi Company
Prepared By Checked By Reviewed By Approved By
SHEIK MYDEEN
PROJECT MANAGER
26-May-24
SIMANCHAL PATRA P GANESAN R
Signature with Designation & Date (SITE ENGINEER/MANAGER) (MECHANICAL LEAD) (CONSTRUCTION SUPERINDENT)