There were two phases to the waterproofing
application process: the preparation, followed by
the waterproofing system itself. In the initial
phase the steel bridge deck was prepared by
shot blasting using metallic grit. Next, once the
quality of the preparation had been approved,
meeting the Sa 2.5 Standard required, the speed
of application of the Eliminator waterproofing
system was paramount, to deliver against the
tight schedule.
The applicators were able to apply 4500-5000m2
of the bridge waterproofing system per day,
facilitating quick contract progression. This was
made possible due to the speed and ease of
application of the Eliminator system, together
with the fact that each element of the system
cures in under an hour, enabling the next
element of the system to be applied
immediately.
Approvals 12-15
Page 3 of 4
these objectives, we had a skilled team on board
to ensure that the Eliminator product could be
applied quickly and safely; this was a key
element for a project such as the Osman Gazi
Bridge. We are confident that our product will
protect the bridge deck for years to come and
will help it to stand the test of time.”