Subcontracting Using Scheduling Agreement
Subcontracting Using Scheduling Agreement
Subcontracting Using Scheduling Agreement
Solution is as follows.
Step 1
Path Logistics  Materials Management  Material Master  Material
 Create (general)  Immediately
Create Material Master with source list marked in Purchasing view and Special Procurement type is 30 in
MRP2 View.
Procurement type in F
Step 2.
Transaction: QI01
Menu Path: Logistics  Quality Management  Quality Planning  Logistics
Master Data  Q-Info Record: Procurement  Create
Step 3.
Enter the firm zone: Zone in which the requirement should be converted to Schedule lines.
Step 4.
Transaction: ME01
Path: Logistics  Materials Management  Purchasing  Master Data
 Source List  Maintain
In ME01,
Enter the valid from and to date, vendor, purchasing organization, agreement created in STEP 3, and
MRP indicator as 2 = Record relevant to MRP. Sched. lines generated automatically. SAVE the record
STEP 5
RUN MRP.
Transaction is MD02.
Path: Logistics  Production  MRP  Planning  Single item, multi
level
Control. Parameter to be used for schedule lines is 2, This will ensure that requirement in the firm zone is
converted to schedule lines rest will be converted to planned order.
step-6
Transaction: OMI4 (Define Lot sizing procedures), Choose MRP Lot Size
The Splitting will enable the requirement to be split between two vendors. The following are the details of
the same.
Change views
Transaction: ME11
Transaction: ME01
Transaction: MEQ1
Path: Logistics  Materials Management  Purchasing  Master Data
 Quota arrangement  Maintain
Input the Valid to date and Min. qty splitting (If the requirement is greater than Min qty Splitting only
then the requirement will be split else it will be allocated to only one vendor based on the Quota
Enter the following details
The system assigns a quota rating to each source of supply. The quota rating is calculated as follows:
= Quota rating
Quota
where
• Quota-allocated quantity
= Total quantity from all purchase requisitions, purchase orders, release orders, and scheduling agreement
schedules allocated to a given source of supply. (The quantities of quota-allocated planned orders are also
taken into account.)
= Quantity used to control the quota arrangement when new sources of supply are included.
• Quota
= A number specifying which portion of a total requirement should be obtained from a certain source.
The source with the lowest quota rating represents the valid source, even if it has a quota rating of 0 (that
is, the quota-allocated quantity and the quota base quantity have the value 0). If more than one source of
supply has a quota rating of 0, the item with the highest quota is the valid source of supply.
According to the formula, the following applies: The higher the quota, the lower the quota rating and the
higher the likelihood that the relevant source will be determined as the valid source.
But in case of splitting SAP will not go on the basis of Quota it will purely split the requirement quantity
between two or more vendor on the basis of Quota %.